Loading...
HomeMy WebLinkAbout18-0128 - Nort End Phase 1 - C1.4 POST-CONSTRUCTION SWPP84 Required (x4 floors) 92 Provided 36 13 2 CHECKED BY: PROJECT NO.:DATE: DRAWN BY: SHEET TITLE: SHEET NO.:3/20/2020 12:10 PM, Ron Richardson|S:\Project Files\2018\18-0128\CADD\Design\Sheet Sets\North End\18-0128_Post-Construction SWPPP.dwgTOTAL SHEETS:NO.DATEDESCRIPTIONCOPYRIGHTED BY SHREWSBERRY AND ASSOCIATESREVISIONS RDR KMB 02/19/2020 18-0128 ----HAMILTON COUNTYCARMEL, INDIANANORTH END - PHASE 17321 SHADELAND STATION, INDIANAPOLIS IN 46256 (p) 317.841.4799   (f) 317.841.4790 shrewsusa.com DRAWING STATUS: CONSTRUCTION PLANS IIND ANA T DE RE RE G I S 10302164 STATE OF No. PR ELI MI N A R Y NO T F O R CO N S T R U C TI O N102/19/20INITIAL CONSTRUCTION PLAN SUBMITTAL TO CARMEL FOR REVIEW203/20/20CITY OF CARMEL RESUBMITTALC1.4 POST-CONSTRUCTION STORM WATER POLLUTION PREVENTION PLAN N LEGEND: PHASE 1 PHASE 2 BENCHMARK INFORMATION:(NAVD 1988)CARMEL GENERAL NOTES: THIS SHEET TO BE USED FOR EROSION CONTROL ONLY. CONSTRUCTION ACTIVITIES CONSTRUCTION INFORMATION PRE-CONSTRUCTION ACTIVITIESDEVELOPMENT NOTES GENERAL NOTES SITE SPECIFIC SEQUENCE:STORMWATER POLLUTION PREVENTION PLAN GENERAL NOTES: