HomeMy WebLinkAbout18-0128 - North End Phase 1 - C1.0 COVER11
10
84 Required (x4 floors)
92 Provided
144 Required (x4 floors)
144 Provided
36
8
8
13
14
9
2
9
9
9
9
8
7
6
3/20/2020 1:27 PM|S:\Project Files\2018\18-0128\CADD\Design\Sheet Sets\North End\18-0128_Cover Sheet.dwgNORTH END - PHASE 1
CARMEL, IN
SECONDARY PLAT - CONSTRUCTION PLANS
OLD TOWN COMPANIES, LLC
02/19/2020 C1.0
18-0128
SHEET7321 SHADELAND STATION, INDIANAPOLIS IN 46256
(p) 317.841.4799 (f) 317.841.4790
shrewsusa.com
CONSTRUCTION
PLANS
N
GENERAL LOCATION MAP
HAMILTON COUNTY, INDIANA
PROJECT LOCATION MAP
NOT TO SCALE
BENCHMARK INFORMATION:(NAVD 1988)
DEVELOPER:
OLD TOWN COMPANIES LLC
1132 S. RANGELINE ROAD, SUITE 100
CARMEL, IN 46032
(317)496-7160
rebecca.mcguckin@gmail.com
CIVIL ENGINEER:
SHREWSBERRY & ASSOCIATES, LLC
7321 SHADELAND STATION WAY, SUITE 160
INDIANAPOLIS, IN 46256
(317)983-2109
kbuck@shrewsusa.comSOILS MAP
NOT TO SCALE
SITE MAP
NOT TO SCALE
N
SOILS LEGEND:
CARMEL GENERAL NOTES:
PREPARED BY:
SHREWSBERRY & ASSOCIATES, LLC
7321 SHADELAND STATION WAY, SUITE 160
INDIANAPOLIS, IN 46256
(317)841-4799
N
UTILITY CONTACT INFORMATION:
STORM WATER ADMIN.:
SANITARY:
WATER:
TELEPHONE:
CARMEL ENGINEERING
DEPARTMENT:
SURVEYOR:
GAS:
ELECTRIC:
CABLE:
LEGAL DESCRIPTION
DOCKET NO. PZ-2020-00002
ZONING: UR AND P1 WITHIN THE MONON GREENWAY OVERLAY
TOTAL SITE DISTURANCE = 12.93 ACRES
OPEN SPACE = 0.98 ACRES
TOTAL ACREAGE = 12.93 ACRES = 7.60 %
PHASE 1
PHASE 2
PHASE 3
PRELIMINARY
NOT FOR CONSTRUCTIONCITY RESUBMITTAL - 3/20/2020