HomeMy WebLinkAboutFP0.1 Fire Protection PlansFIRE PROTECTION SPECIFICATIONS
FIRE PROiECT10N SPECIFICATIONS
1. GENERAL PROVISIONS
A. THE PRaVISIONS OF THE INSiRUCT10N5 TO BIDDERS GENERAL CONDITIONS
SUPPLEMENTARY CON�ITIONS ALTERNATES AD�ENDA�S' AND DINSION 1 ARE A PART OF
THIS SPEQFlCATION. CONTRACTORS AN� SUBCONTRACTORS SHALL EHAMME SAME AS
WELL AS OTHER DIVISIONS OF THE SPECIFlCATIONS WHICH AFFECT WORK UNDER THIS
oivisioN.
B. THIS CONTRACTOR SHALL PROVI�E ALL UBOR, EQUIPMENT, SUPPLIES, SERVICES, AN�
SHALL PERFORM ALL WORK COMPLETE AND IN STRICT ACCORDANCE WITH THIS
SPECIFICATION AN� APPLICABLE DRAWINGS.
G THIS CONTRACTOR IS WSTRUCTE� TO RFA� CARENLLY THE SPEQFlCATIONS FOR ALL
PARTS Of THE WORK, WHICH INCWDE THE ARCHITECTURAL, ELECTRICAL, MECHANICAL,
PWMBING, FIRE PROTECTION, CIVIL, STRUCTURAL AN� ALL OTHER �RAWINGS AS WELL AS
THE SPECIFICATIONS fOR ALL THE �IVISIONS THAT ARE PART OF THE CONTRACT
�OCUMENTS.
�. ALL ITEMS OF IABOR, MATERIAL AN� EQUIPMENT NOT SPECIFlCALLY MENTIONED HEREIN
OR SHOWN ON PLANS, BUT INQDENTAL T0, OR REQUIRED FOR THE COMPLETE
INSTALlATION AND PROPER OPERATION OF THE WORK, SHALL BE FURNISHE� AS IF
CALLED fOR IN DEfAIL BY THE SPECIFICATIONS OR �RAWINGS.
E. AS USE� IN THIS SPECIFlCATION, "PROVIDE" MEANS "FURNISH AND INSTALL". "FURNISH"
MEANS 'TO PURCHASE AND DELNER TO THE PROJECT SITE COMPLETE WITH EVERY
NECESSARY APPURTENANCE AND SUPPORT," AND "INSTALL° MEANS i0 UNLOAD AT THE
�ELNERY POINT AT THE SITE AND PERFORM EVERY OPERATION NECESSARY FOR PROPER
INSTALUTION PER CODES AND MANUFACTURERS REOUIREMENTS, TO ESTABLISH SECURE
MOUNTING AND CORRECT OPERATION AT THE PROPER LOCATION IN THE PROJECT.
2. PERMITS, CODES, INSPECTIONS, AND TESTS
A. THE FIRE PROTECTION CONTRACTOR SHALL SEWRE AND PAY FOR ALL PERMITS AND
INSPECTIONS RE�UIRED FOR THE PROSECUTION OF FIRE PROTECTION WORK. ALL
PERMITS AND CERTIFICATES OF INSPECTION AND APPROVAL SIGNED BY THE CONTROLLING
BUILDING DEPARTMENT SHALL BECOME PROPERtt OF THE OWNER.
B. THE FIRE PROTECTION SYSTEM SHALL BE INSTALLED PER THE REQUIREMENTS OF NFPA
13 AND THE LOCAL AUTHORITIES HANNG JURISDICTION.
C. �RAWINGS INDICATE THE MINIMUM �ESIGN REQUIREMENTS. NATIONAL, SiATE, AND LOCAL
CODES SHALL BE FOLLOWED. COMPLY WITH THE LATEST EDITIONS OF THE LOCAL
GOVERNING PLUMBING CODE, LOCAL GOVERNING MECHANICAL CODE, AND NFPA
STANDARDS. THE CONTRACTOR SHALL INCLUDE THE COST OF SAT6FYING SUCH CODES
AND STANDARDS IN HIS BID. FOLLOWING COMPLEfION OF THE FIRE PROTECTION WORK,
FURNISH TO THE OWNER, IN DUPLICATE, CERTIFICATES OF INSPECTION AND APPROVAL BY
REGULATORY AGENqES HAVING JURISDICTION.
(1) �EMONSTRATE TO THE OWNER'S SATISFACTION THE PROPER OPERATION OF EACH OF
THE SYSTEMS COMPRISING TMS WNTRACT BEFORE FINAL PAYMENT.
(2) IIAIAEDIATELY CORRECT ANY WORK FOON� AT VARIANCE WITH THESE SPECIFlCATIONS,
THE NAiIONAL, STATE, AN� LOCAL CO�ES, AND REQOIREMENTS OF GWERNING
REGUTATORY AGENQES.
3. VISIT TO THE SITE
A. THE WNTRACTOR SHALL VISIT THE SITE OF THE WORK AND BECOME FAIAILIAR WITH ALL
CON�ITIONS AFFECTING THE WORK. THE SOBIAISSION OF A PROPOSAL SHALL
PREsuaaosE KNow�EocE oF n�� sucH coNoinoNs allo No nooinoNn� coMPENsanoN
SHALL BE ALLOWED WHERE EXTRA 1A80R OR MATERIALS ARE REOUIRE� BECAl15E OF
icNoenNce oF rHese coNoiTioNs.
4. PROTECTION
A. THE fIRE PROTECTION CONTRACTOR SHALL PROVIDE ALL NECESSARY PROTECTION FROM
�IRT AND WATER DURWG CONSTROCTION NECESSITATED BY FIRE PROTECTION WORN.
PROTECTION IAETHODS ARE Sl1BJECT TO APPROVAL BY THE ARCHITECT.
5. EQUIPMENT AN� MATERIALS
A. ALL EQUIPIAENT AND IAATERIALS SHALL 6E NEW AND SHALL CONFORM TO
UNDERWRRERS' LABORAiORIES STANDARDS, WHERE APPLICABLE WHERE SPEpFlCAT10N5
DESCRIBE, OR PLANS SHOW, MAiERIALS OR EQUIPMENT OF HIGHER DUALItt THAN
REQUIRED BY CODE AND LOCAL RULING, THE DRAwINGS AND SPECIFlCATIONS SHALL
GOVERN THE QUALIIY OF THE MATERIAL OR EQUIPMENT.
6. THE CONTRACTOR SHALL SUBMIT PROOF, IF REQUESTED BY THE OWNER THAT iHE
MATERIALS, APPLIANCES, EQUIPMENT OR DEVICES FURNISHED AND INSTALLED UNDER
TH6 WNTRACT, MEET THE REQUIREMENTS OF THE UN�ERWRITERS� IABORATORIES, INC.,
AS REGAROS FIRE AN� CASUALiY HAZAR�S. THE IABEL OF OR LISTING BY THE
ON�ERWRITERS' LABORATORIES, INC. WILL BE ACCEPTED AS CONFORMING WITH THIS
RE�UIREMENT. W LIEU OF 7HE LABEL OR LISTING, THE WNTRACTOR MAY SUBIAIT
IN�EPENDENT PROOF SATISFACTORY TO THE ARCHITECT THAT THE MATERIALS
APPLWNCES OR �EVICES CONFORM TO THE PUBLISHE� STANOARDS, INCLU�ING MEfH0�5
OF TESi OF iHE UNDERWRITERS' IABORATORIES, MC. UNDERWRIiERS' IABORATORIES,
INC. AND R$ PUBLICATIONS WILL BE REFERRED TO HEREINARER BY THE ABBREVIATION
UL, WRH OR WITHOUT ADDITIONAL IDENTIFYING SYMBOLS.
6. GUARANTEE
A. THE FlRE PROTECTION CONTRACTOR SHALL GUARAMEE FOR A PERIOD OF ONE YEAR
THAT ALL WORK AND EQUIPIAENT WILL REMAW FREE FROM ALL DEFECTS IN
WORKMANSHIP AND MATERIALS, AND iHAT IT WILL COMPLY WITH ALL THE SPEQFlC
REOUIREMENTS OF iHE SPECIFlCATIONS AND OTHER CONTRACi DOCUTAENTS GOVERNING
THE WORK.
B. ALL WORK FOUND BY THE ENGMEER TO BE DEFECiNE WILL BE REPLACED WITH NEW
WORK MEEiING ALL THE REQUIREIAENTS OF THE CONTRACT. THE FlRE PROTECTION
CONTRACTOR WILL BEAR ALL COSTS OF SUPPLYING SUCH NEW WORK, AND INSTALLING
AND RNISHING SAME, AND WILL ASSUME ALL COSTS FOR REPLACING OTHER WORK
DAMAGED BY THE REMOVAL AND REPUCEMENT OF ANY OF iHE WORK. iHE FlRE
PROTECTION CONTRACiOR WILL BEAR ALL COSTS FOR FREIGHT, DRAYAGE AND
DEMURRAGE, AND ALL IABOR W CONNECTION THEREWITH.
7. CUiTING, PAiCHING, FIRESTOPPING AND PAINTING
A. THIS CONTRACTOR SHALL BE RESPONSIBLE FOR WTfING ALL HOLES REQUIRED FOR
WSTALLATION OF FlRE PROTECTION WORK. HOLES SHALL BE CUT IN A NEAT MANNER
SATISFACiORY TO THE ARCHITECT.
B. UNLESS NOTED OTHERWISE, ALL HOLES OR DAMAGE CAUSED BY THE REIAOVAL OF
ENISTING WORK OR iHE MSTALLATION OF NEW WORK SHALL BE PROPERLY PATCHED BY
TH6 CONTRACTOR. HOLES SHALL BE NEATLY PATCHED AND PAIMED WRH SUITABLE
MATERIAL TO MATCH E%ISiING SURFACES. HOLES THROUGH FLOORS OR FIRE WALLS
SHALL BE SEALED WITH THE APPROPRIATE INTUMESCENT CAULN, PUT7Y, STRIP OR SHEET
NPE FIRE BARRIER PRODUCT.
C. FIRESTOP SYSTEM (REQUIRED FIRESTOPPING MATERIALS) SHALL BE DETERMINED BY THE
WALL OR FLOOR/CEILING ASSEMBLY AN� PENEfRA710N IYPE AN� SHALL BE UL LISTEO
AN� TESTED IN ACWR�ANCE WITH ASTM E814. FIRE RA71NG OF THE FIRESTOP SYSTEM
SHALL BE EQUIVALENT TO THE ASSEMBLY WHICH IS PENEfRATE�.
�. ACCEPTABLE FIRE BARRIER PRO�UCTS: HILTI "FS-ONE", NELSON `FLAMESEAL" OR
APPROVED EOUAL AS MANUFACTURE� BY 3A�.
8. CLEANING AN� PAINTING
A. CLEAN NEW PIPING AfTER WORK IS COMPLEfE TO REMOVE PIPE DOPE, LOOSE IAILL
SCALE AN� OTHER EXTRANEOUS MATERIALS.
B. TOl1CH UP ANO REPAIR ANY DAMAGE� FACTORY RNISHES ON EOUIPIAENT AN� MATERIALS
RELEA5E0 FOR CON$TRUCTI�N °NOEa rHe aniNnNc oiwsioN oF rHE
Su6ject�o compliance with allregula�ions
of S�a�e antl Local Codes
City of Carmel
r
�un��\i lo•rvalM��_
DATE: 03�27�20
9. COORDINATION AND CONDUCT OF WORK �5. FIRE PROTECiION
A FIRE PROTECiION DRAWINGS ARE DIAGRAIAMATIC, INDICATING GENERAL ARRANGEMENT, q, GENERAL
APPROXIMATE SRES, GENERAL LOCATIONS OF EQUIPMENT, SPRINKLER HEADS, AND
PIPING. VERIFY DIMENSIONS W FIELD; ADJUST TO MANUFACTURER�S SHOP DRAWINGS. (�)FURNISH ALL IABOR, WNSTRUCTION EQUIPMENT AN� MATERIALS NECESSARY FOR
DO NOT SCALE DRAWINGS. THE COMPLEfE INSTALlATION OF THE FIRE PROTECTION SYSTEM AS INDICATED. ALL
WORK SHALL BE IN STRICT COMPLIANCE WITH ALL GOVERNING STATE AND LOCAL CO�E
B. ALL REQUEAS FOR INFORMATION SUPPLEMENTAL TO THE WNSTRUCTION DOCUMENTS REOUIREMENTS, IN FULL CONFORMItt WITH THE BEST CURRENT TRADE PRACTICES ANO
SHALL BE SUBMITfED IN WRITING TO THE ARCHITECT FOR DISTRIBUTION TO THE SUBJECT TO APPROVAL OF THE ARCHITECT OR HIS REPRESENTATNE.
APPROPRIATE PARtt(S).
(2) ALL WORK DEfAILS NOT COVEREO IN THESE SPEQFlCAiIONS SHALL BE GWERNEO
C. �RAWINGS AN� SPECIFICATIONS ARE TO BE CONSI�ERED AS SUPPLEMENTING FACH 8Y THE RWUIREMEMS OF THE IAIEST EDI710N OF NFPA-13.
OTHER. WORK SPEQFIE� BUT NOT SHOWN, OR SHOWN BUT NOT SPECIFIE�, SHALL BE
PERFORMED OR FURNISHED AS THOUGH MENTIONE� IN BOTH SPEGFICATIONS AN� (3) SUPPORT ALL SPRINKLER PIPING PER NFPA iJ REOUIREMENiS.
�RAWINGS.
(4) PIPE BENDING IS NOT ACCEPTABLE.
�. ARCHITECTURAL AN� STRUCTURAL DRAWINGS SUPERSE�E FIRE PROTECTION �RAWINGS.
�EfERMINE THAT WORN OF THIS �IVISION CAN BE ACCOMMO�ATE� WITHM SPACES (5) ALL FlRE PROTECTION PIPING SYSTEMS MUST BE COMPLEIELY DRAINABLE.
PROVI�ED. NOiIFY ARCHITECT OF ANY INTERFERENCES BEFORE STARTING INSTALlATION. 8. �ESIGN AND INSTALLATION REQUIREMENTS
E. �EfERMINE SIZE$ LOCATIONS FOR CHASES AN� OPENINGS NECESSARY FOR INSTALLATION (1) PREPARE SHOP DRAWMGS AND HYDRAULIC CALWUTIONS IN ACCORDANCE WITH
OF PWMBING ANO FIRE PROTECTION WORK. COOPERATE WITH OTHER TRA�ES IN NWA REQUIREIAENTS. SUBMIT �RAWINGS TO LOCAL GOVERNMENT AGENQES ANO
SEffING SLEEVES, INSERTS AND HANGERS. OWNER'S INSURANCE UNDERWRITER FOR APPROVAL. AFfER THE ABOVE AND PRIOR TO
F. COORDINATE THIS WORK WITH ALL TRADES. ARRANGE OPERATIONS SO AS NOT TO CONSTRUCiION, SUBMIT THE DOCUMENTS i0 THE ARCHITECT AND ENGINEER FOR
�EIAY INSTAl1ATI0N OF COMPLEfION OF ANY PARTS OF INTERREIATE� WORK SO THAT REVIEW.
CONSTRUCiION MAY PROCEED ON SCHE�ULE. (7)�) THE CONTRACTOR SHALL ESTABLISH ACTUAL AVAIIABILIN OF THE WATER FROM
G. COOPERATE WITH ALL TRA�ES IN PREPARING INTERFERENCE DRAWINGS FOR AREAS HISTORICAL DATA OR BY PERFORMING A FLOW TEST.
WHERE THERE IS POSSIBLE CONFLICT BE7WEEN TRADES. EXACT LOCATION OF PIPES, ���p� VERIFY HAZAR� OCCUPANCY CLASSIFlCATION REQUIREMENT WITH THE OWNER.
AN� EQUIPMENT SHALL BE BASE� ON FIEL� MFASUREMENTS WITH FINAL ARRANGEMENT
�EfER1AME� BY INTRA-TRADE AGREEMENTS SO&IECT TO ARCHITECT'S APPROVAL (p) CONiRACTOR SHALL BE LICENSED BY ALL STATE AND LOCAL AUTHORITIES.
H. ARCHITECT RESERVES THE RIGHT TO IAANE REASONABLE CHANGES IN INDICATED �3�INSTALL LLL OR F.M. APPROVED SPRINKLERS AS REQUIRED FOR COVERAGE. ALL
LOCATIONS WITHOUT EX�RA WST TO THE OWNER. SPRINKLERS SHALL BE NEW AND CENTERED IN CEILING TILE WHERE POSSIBLE.
I. ALL WORK SHALL BE WSTALLE� IN A NEAT AND WORKA�ANLIKE MANNER BY FIRST-CVSS �q� pROVIDE SPRINKLER HEADS TO MATCH EXISTING HEA�S INSTALLED IN A�JACENT
IAECHANICS. THE CONTRACTOR SHALL PROVI�E ADEQUATE AND WMPEfENT SUPERVISION AR�S. IYPE AN� MANUFACTURER SHALL BE APPROVE� BY THE OWNER.
OF THE JOB AS RE�UIRED.
J. PIPMG AN� EOUIPMENT SHALL BE ARRANGED SUBSTANTIALLY AS IN�ICATE�. ANY (5) COORDINATE SHUiDOWN OF THE EXISTING SPRINKLER SYSTEM WITH iHE OWNER.
CHANGE RESULTING IN A SAVMGS IN 1A80R OR MATERIAL SHALL BE MA�E ONLY IN
ACCORDANCE WITH A CONTRACT CHANGE ORDER. DEVIATIONS SHALL BE MADE ONLY (6) FIRE PROiECTION PIPING SHALL BE iESTED WITH WATER AT A PRESSURE OF 200
WHERE NECESSARY TO AVOID INTERFERENCES AND ONLY AFfER �RAWINGS SHOWING THE P51 FOR 2 HOURS.
PROPOSED �EVIATIONS HAVE BEEN SUBMITTE� TO AND APPRWE� BY THE ARCHITECT. C. FlRE PROTECTION EOUIPIAENT AND MATERIALS
K. COORDINATE ALL SHUT�OWNS OF FIRE PROTECTION SYSTEM IN ADVANCE WITH THE (1) PIPE AND FITfINGS
OWNER.
10. SUBMITfALS a. FIRE PROTECTION PIPING, SHALL BE WELDE� OR SFAMLESS BIACK STEEL AS
SCHE�ULE� IN NFPA, WITH THREA�ED JOINTS.
A.PROVI�E A MINIMUM OF SIX (6) SUBMITTAL �RAWINGS FOR EQUIPMENT, SPRINKLER b. FITTINGS SHALL BE MALLEABLE IRON, THREADE� ttPE, AS SCHEDULE� IN NFPA.
HEA�S, FIRE PROTECTION HYDRAULIC CALCULATIONS, AN� ALL OTHER SPECIFIE�
COMPONENTS FOR APPROVAL BY THE ARCHITECT AN� ENGINEER. (2) SPRMKLER HEA�S
B.WHERE ONLY ONE MAKE OF EQUIPMENT IS NAMED, IT SHALL BE PROVI�E� AS SPECIFIE�. a. SPRMKLER HEA05 SHALL BE UL LISTE� AND FM APPROVE�, IAEEfING NFPA
C.VERBAL REOUESTS OF APPROVALS FOR ANY SUBSTITUTION WILL NOT BE BINDING ON THE REOUIREMENTS.
ARCHITECT AN� OWNER. b. TEMPERATURE RATING OF HEA�S SHALL BE 1fi5 DEGREES FAHRENHEIT.
�.THIS WNTRACTOR ASSUMES ALL RESPONSIBILIIY FOR ALL COS7S FOR RE�ESIGN c. ACCEPTABLE MANUFAC7URERS: VIKING, CEMRAL, STAR, RELIABLE.
CHANGES NECESS4RY BY ALL TRAOES TO ACCOMMO�ATE THE USE OF EQUIPMENT NOT
SPEQFIED ON PROJECT DOCUMEMS. d. CONCEALED HEAD iYPE FlNISH/COLOR i0 MATCH ADJACENT SURFACE.
E.BIOS SHALL BE BASEO 11PON THE SPECIFIED PRODUCTS OR LISTED ALTERNATNES.
�RAWINGS AND SPEQFlCATIONS ARE BASED ON THE PRODUCTS SPEQFIED BY nPE, FIRE PROTECTION NOTES
MO�EL, AND SRE AN� THUS ESTABIJSH MINIMUM QUALITIES, WHICH SUBSTITUTES MUST
MEEf TO QUALIFY FOR REVIEW.
F.SHOULD THE CONTRACTOR PROPOSE TO FURNISH MATERIALS, EQUIPMENT, AN� �EVICES, �, DRAWINGS ARE DIAGRAMMAiIC: DETERMME LOCATIONS OF $Y4EIA5 AND
OTHER THAN THOSE SPEQFIED AN� LISTEO, THE WNTRACTOR SHALL SUBMIT A WRITfEN COMPONENTS M FlELD.
REQUEST FOR SUBSTITUTIONS, TO THE ENGMEER, AT LEAST FOURTEEN (14) CALEN�AR
DAYS PRIOR TO BID OPENMG THE REQOEST SHALL BE AN ALTERNATE TO THE ORIGINAL y. PRCH PRESSURE PIPING IN DIRECTION OF FLOW.
BIO AN� SHALL MCLU�E AND BE ACWMPANIE� WITH COMPLEfE SPECIRCATIONS COT
SHEEf SUBMITTAL AS OUTLMEO IN SECTION 11.A OF THIS SPEQFlCATION SECTION, 3, pRODUCT INSTALLATION SHALL ADHERE TO MANUFACTURERS' REQUIREMEMS.
COIAPLETE WITH DESCRIPTNE (MANUFACTURER, BRAND NAIAE, CAiALOG NUMBER, ETC.)
AND TECHNICAL DATA FOR ALL IiEMS. INDICAiE ANY ADDITIONS OR DEDUCTIONS TO THE q. NEITHER ACCURACY NOR COMPLETION OF UTILIN LOCATIONS SHOWN ON
CONTRACT PRICE WITH THE SU841TUTION SUBMITfAL AND ON THE BID FORM. DRAWINGS IS GUARAMEED. DETERIAME EXACT LOCATIONS OF ERISTING
G,ACCEPTANCE OR REJECiION OF iHE PROPOSED SUBSiIiUT10N5 SHALL BE SUBJECT i0 UiILITIES M FlELD, WHETHER OR NOT SHOWN ON DRAWINGS. ExERQ$E
APPROVAL OF THE ARCHRECT AND ENGWEER. IF REQUESTED, iHE CONTRACTOR SHALL CAUTION AND IDENTIFY LOCATIONS OF UNMARKED UTILItt LMES AS
SUBMIT INSPECTION SAMPLES OF BOTH THE SPECIFlED AND THE PROPOSED SUBSTITUTE NECESSARY TO PERFORM WORN OF THI$ SECTION.
ITEMS. 5. ALL WORK SHALL BE IN ACCORDANCE WITH ALL APPLICABLE CODES.
H,IF ANY SUBSTITUTIONS ARE APPROVED, AN ADDENDUM LISTING THE APPROVED ITEM(S) 6. R SHALL BE THE RESPONSIBILItt OF iH15 CONTRACTOR TO COORDINATE HIS
WILL BE ISSUE� TO ALL BID�ING CONTRACTORS PRIOR TO THE BID �ATE. WORK WITH THAT OF ALL OTHERS TRADES AND GENERAL ARCHRECTURE.
I. IN ALL CASES WHERE SUBSTITUTIONS ARE PERMITfED THE CONTRACTOR SHALL BEAR
ANY EXTRA COST OF EVALUATING THE EOUALI7Y OF THE MATERIAL AND EQUIPMENT TO 7. ANY IMERFERENCE SHALL BE BROUGHT TO iHE ATTENTION OF THE
BE INSTALLED. CONSTRUCTION MANAGER AND SHALL BE RESOLVED PRIOR i0 THE
INSTALLATION OF THE WORK INVOLVED.
J. WHERE ONLY ONE MAKE IS NAMED IN THE SPECIFICATIONS OR ON THE ORAWINGS, IT
SHALL BE PROVIDE�. e. VERIFY EKACT SIZES, LOCATIONS, INVERTS AND ELEVATIONS PRIOR TO
FABRICAiING AND INSTALLMG ANY PIPING.
K.VERBAL REQUESTS OR APPROVALS SHALL NOT BE BIN�ING ON THE ENGINEER OR
OWNER. 9. ALL PIPING PENEiRATMG CEILINGS AND WALLS SHALL BE INSiALLED WITH
11.EQUIPMENT AND PIPING I�ENTIFICATION CHROME (STAINLE55 WHERE NOTED) PIATED ESCUTCHEONS AT THE
PENEiRATION. PIPING PENEfRATMG RATE� PARTITIONS SHALL BE PROTECTE�
A.IABEL ALL PIPING SYSTEMS WITH PIPE MARKERS MSTALLED ADJACENT TO VALVES, AS BY LOCAL CODE AUTHORIIY.
WHERE PIPES PASS THROUGH WALLS OR FLOORS, NEAR ALL BRANCHES AND CHANGES
OF DIRECTION, AT 20 FEEf INTERVALS ON STRAIGHT RUNS OF PIPE, AN� AT ACCESS 10. ALL SLEEVES THROUGH CONCREfE FLOORS AND ALL CORE �RILLING OF
DOOR LOCATIONS. ALL PIPE MARKERS SHALL WNFORM TO ANSI A13.1 "SCHEME FOR CONCREfE FLOORS AND WALLS SHALL BE BY THIS CONTRACTOR.
THE IDENTIFICATION OF PIPING SYSTEMS".
11. RUN PIPMG CONCEALED, UNLESS SPECIREO O7HERWISE, AN� CLEAR OF
B.THE CONTRACTOR SHALL FURNISH AN� INS�ALL A SYSTEM OF NAMEPLATES DESIGNE� TO CEILING WSERTS.
IDENTIFY EACH PIECE OF EQUIPMENT.
12 PROVI�E CIAMPS, OFFSEf$ EXPANSION JOINTS, ANCHORS AND GUIDES AS
(1) NAMEPLATE LETTER AN� NUMBERS SHALL MATCH EQUIPMENT �ESIGNATION AS NECESSARY TO PREVENT STRESS ON PIPING.
iNoicnTEo oN THE oRnwiNcs.
13. SPRINKLER CONTRACTOR SHALL HYDRAULICALLY CALCUTATE NEW SYSTEA�
(2) NAMEPLATES SHALL BE UTAINATED PHENOLIC WITH BLACK SURFACE AND WHRE REOUIREMENTS BASED ON THE USE GROUP, OCCUPANCY LOA�,
CORE. USE 1/16" THICK MATERIAL FOR PlATES UP TO 2" BY 4". FOR IARGER CONSTRl1CTI0N IXAS9FlCATION, Efq AS INDICATED IN THE SPECIFlCATIONS.
SIZES USE 1/8" THICK LEffERS AN� NUMBERS SHALL BE A MINIMUM OF 1�7' HIGH.
14. SPRMKLER CONTRACTOR SHALL OBTAIN A COPY OF THE BUILDING SYSTEA�
(J)FASTEN NAMEPLATES TO ALL E�UIPMENT BY THE USE OF STAMLESS STEEL SHEEf FLOW TEST. THESE FlN�MGS SHALL BE USE� FOR THE HY�RAULIC
IAEfAL SCREWS. SPRMKLER SYSTEM CALWlATIONS.
12 AS-BOILT DRAWMGS 15. SPRINKLER CONTRACTOR SHALL SCHEDOLE WALN THROUGH WITH FlRE
A.AS WORK PROGRESSES, RECORD ON A SET OF "AS-BUILi" PRINTS ANY DEVIAilONS PREVENTION INSPECTOR FOR RNAL ACCEPTANCE AS RWUIRED.
FROM DESIGN DRAWINGS, DELNER i0 THE OWNER BEFORE SUBIAITfING REOUEA FOR �6. REVISE SPRINKLER SYSTEM WITHIN ALL AREA OF WORN TO ACWMMODATE
FINAL PAYMENT. THE "AS-BUILT" PRINTS SHALL BE AN ACCURATE DEPICTION OF THE NEW WORN.
PROJECT AS COMPLEfED.
13.OPERATING AND MAINTENANCE MANUALS 17. SPRMKLER CONTRACTOR IS TO VERIFY SPRINKLER DISTRIBOTION SYSTEM &
lAYOUT COMPLIES WITH ALL NFPA 13 REOUIREMENTS.
A.PROVI�E TO OWNER, AT PROJECT TURNOVER, THREE (3) HAR�BOUN� COPIES OF �8. REVISE SPRINKLER DISTRIBUTION SYSTEA� WITHIN NEW TENANT SPACE TO
OPERATING AND MAIMENANCE MANUALS FOR ALL EQUIPMENT AN� SYSTEMS INSTALLE�. qCCOMMODATE NEW OFFlCE lAYOUT.
MANUALS SHALL INCWDE ALL RELEVAM WFORMATION NEE�EO FOR DAY-TO-�AY
OPERATION AND MANAGEMENT OF EACH SYSTEM, AS WELL AS EQUIPMENT MAIMENANCE �g FlRE PROTECTION PlANS AS SHOWN ARE FOR WNDITIONAL PIAN APPROVAL
INFORMATION REQUIRE� TO SUPPORT THE MAINTENANCE PROGRAM. ONLY. FIRE PROTECTION CONTRACTOR IS TO OBTAIN CURRENT HY�RANT
14.OPERATING INSTRUCTIONS TEST DATA AND PROVIDE HY�RAULIC CALCULATIONS FOR SYSTEM PIPE
SIZING IN ACCORDANCE WITH NFPA 13. CONTRACTOR IS TO Sl1BMIT SHOP
A.PROVI�E TO OWNER AFTER ALL EOUIPMENT IS IN OPERATION AN� AT AN AGREEABLE �RAWINGS IN�ICATING HY�RAULIC CALWLATIONS, PIPING UYOl1T & SIZING.
TIME INSTRUCTIONS FOR THE PURPOSE OF TRAINING OWNER'S PERSONNEL IN ALL SHOP �RAWINGS AN� CALCl1lATI0NS ARE TO BE SIGNE� & SEALEO BY A
PHASES OF OPERATION AND MAINTENANCE OF EOUIPIAENT AND Sl'STEMS. SCHEDULE CERTIFlE� FlRE PROTECTION SYSTEM �ESIGNER. ALL WORK IS TO BE DONE
TRAINING WITH OWNER, PROVIDE AT LEAST SEVEN DAYS PRIOR NOTICE PROVIDE THIS IN ACCORDANCE WITH ALL GOVERNMENT, STATE, & LOCAL, CODES.
iRAINING TO ALL PERSONNEL AND ON ALL SHIRS.
20. STATE CERTIFlED RRE PROTECTION SYSTEM �ESIGNER SHALL SUBMIT FlNAL
PIANS FOR PERIAITfING AN� CONSTRUCTION.
E%ISTING SPRINKLER MAIN
/
/
/
/
/
FIRE PROTECTION PLAN
l�q.. = 1._Q��
FIRE PROTECTION PLAN CODED NOTES
� PROVIDE A MODIFIED HYDRAULICALLY CALWLATED AUTOMATIC
SPRINKLER SYSTEM FOR THE AREA INDICATED. SPRINKLERS
SHALL BE DESIGNED FOR LIGHT HAZARD OCCUPANCY, DELNERING
A �ENSIN OF 0.10 GPM/SQ.FT OVER THE HY�RAULICALLY MOST
REA�OTE I,5�0 SQ. R. (165 DEGREE F RATED CONCEALED
PENDANT HEAD M FlNISHED CEILINGS)
REMOVE E%ISTING SPRWKLER HFA� AND
WSTALL NEW 1" OFFSEf
�
NEw sPRiNK�ER H�no wiTH cEiuNc PurE.
FlNISH/COLOR TO IAATCH ADJACENi SURFACE.
NEW SUSPENDED CEILING.
NEW PENDANT SPRINKLER DETAIL
SCALE:NONE
� Inregrared
Lf�En�'meerinp
r.o���ta�is,l,��.
9700 ROCNSIDE RD. SUITE 290
CLEVEIAND.OX 44125
PHONE:716901�6711
FA%:216901-6712
�
�
j
PROJEC�LOCATfON
Key Plan:
� 2 4�8 �
� �
Scale: _"
NELSOI�
Nelco Architedure, Inc.
a licensed affliate
30 West Monroe Street - Suite 200
Chicago, IL 6060&2409
Phone: (312)263-6605
(312)2]fi-4340
OWNER'S PROJECT MANAGER
Jones Lang LaSalle
Leslie Soto
540 W. Madison St, Suit eIL9-540-04-55
Chicagq [L 60661
T:312.909.2139 E:lesliesoto@am.jlLmm
MEPENGINEER
Integrated Engineering ConsWtants,Inc (IEC)
Tim Vlning
9700 Rockside Road, Suite 290
Cleveland, OH 44125
T. 216.901.67ll E: tim.vining@ieC-inCcc
GENERALCONTRACTOR
Mid America Contracting, Inc.
Tyler Crawford
107 N. Main Street, Suite 3A
Columbia, IL 62236
T: 618.589.2770 E: tic@midamericacontracting.com
ARCHITECT OF RECORD
Nelm Architecture, Inc.
Vincent Paul Duet
IN. LIC NO: AR11500046
Exp: 12/31/2021
T: 215.825.6620 E: vduet@nelsonww.com
ConsWtant'.
MERRILL�
A BANK OF AM ERICA COMPANY
Cllent.
INW-044 BofA Indianapolis MLWM
Pantry Refresh, Sth Floor
510 96th Street
Indianapolis, IN 46240
Project TiHe & Nddress:
FIRE PROTECTION PLAN
AND SPECIFICATIONS
SheetTiHe�.
� PE118005]5
i�l •
- STAtE oF ; Q-
�:Po''.�NoIAN?.' 2��
''. FssroNn�e���
��.c �-��/���,,��%/'�
Seal:
Proj. No'. 19.00OSU].000 Designer'. ERO;MBM
�rawn By: ]PH Reviewed By. HHH
Pmjcct Managcr. M]L qppmved By: HHH
FPO-1
ALL �IMENSIONS AN� LONDITIONS MOA BE CHECKED AND VERIRED
ary s�rE ar TnE mrvrRncroR nrvo sue-mvTancrons an�oR ro
PEFFOkMMG THE WOFK. THE PRO]ECT MHNAGEk SHALL RE NOTIFIED IN
WRITING �F ANY �ISCREPANCIES PRIOR TO PROCEE�ING WITH THE W�RK.
;o rveisary wan�ow�oe, ac zozo nu a�sHTs n�aveo