Loading...
HomeMy WebLinkAboutFP0.1 Fire Protection PlansFIRE PROTECTION SPECIFICATIONS FIRE PROiECT10N SPECIFICATIONS 1. GENERAL PROVISIONS A. THE PRaVISIONS OF THE INSiRUCT10N5 TO BIDDERS GENERAL CONDITIONS SUPPLEMENTARY CON�ITIONS ALTERNATES AD�ENDA�S' AND DINSION 1 ARE A PART OF THIS SPEQFlCATION. CONTRACTORS AN� SUBCONTRACTORS SHALL EHAMME SAME AS WELL AS OTHER DIVISIONS OF THE SPECIFlCATIONS WHICH AFFECT WORK UNDER THIS oivisioN. B. THIS CONTRACTOR SHALL PROVI�E ALL UBOR, EQUIPMENT, SUPPLIES, SERVICES, AN� SHALL PERFORM ALL WORK COMPLETE AND IN STRICT ACCORDANCE WITH THIS SPECIFICATION AN� APPLICABLE DRAWINGS. G THIS CONTRACTOR IS WSTRUCTE� TO RFA� CARENLLY THE SPEQFlCATIONS FOR ALL PARTS Of THE WORK, WHICH INCWDE THE ARCHITECTURAL, ELECTRICAL, MECHANICAL, PWMBING, FIRE PROTECTION, CIVIL, STRUCTURAL AN� ALL OTHER �RAWINGS AS WELL AS THE SPECIFICATIONS fOR ALL THE �IVISIONS THAT ARE PART OF THE CONTRACT �OCUMENTS. �. ALL ITEMS OF IABOR, MATERIAL AN� EQUIPMENT NOT SPECIFlCALLY MENTIONED HEREIN OR SHOWN ON PLANS, BUT INQDENTAL T0, OR REQUIRED FOR THE COMPLETE INSTALlATION AND PROPER OPERATION OF THE WORK, SHALL BE FURNISHE� AS IF CALLED fOR IN DEfAIL BY THE SPECIFICATIONS OR �RAWINGS. E. AS USE� IN THIS SPECIFlCATION, "PROVIDE" MEANS "FURNISH AND INSTALL". "FURNISH" MEANS 'TO PURCHASE AND DELNER TO THE PROJECT SITE COMPLETE WITH EVERY NECESSARY APPURTENANCE AND SUPPORT," AND "INSTALL° MEANS i0 UNLOAD AT THE �ELNERY POINT AT THE SITE AND PERFORM EVERY OPERATION NECESSARY FOR PROPER INSTALUTION PER CODES AND MANUFACTURERS REOUIREMENTS, TO ESTABLISH SECURE MOUNTING AND CORRECT OPERATION AT THE PROPER LOCATION IN THE PROJECT. 2. PERMITS, CODES, INSPECTIONS, AND TESTS A. THE FIRE PROTECTION CONTRACTOR SHALL SEWRE AND PAY FOR ALL PERMITS AND INSPECTIONS RE�UIRED FOR THE PROSECUTION OF FIRE PROTECTION WORK. ALL PERMITS AND CERTIFICATES OF INSPECTION AND APPROVAL SIGNED BY THE CONTROLLING BUILDING DEPARTMENT SHALL BECOME PROPERtt OF THE OWNER. B. THE FIRE PROTECTION SYSTEM SHALL BE INSTALLED PER THE REQUIREMENTS OF NFPA 13 AND THE LOCAL AUTHORITIES HANNG JURISDICTION. C. �RAWINGS INDICATE THE MINIMUM �ESIGN REQUIREMENTS. NATIONAL, SiATE, AND LOCAL CODES SHALL BE FOLLOWED. COMPLY WITH THE LATEST EDITIONS OF THE LOCAL GOVERNING PLUMBING CODE, LOCAL GOVERNING MECHANICAL CODE, AND NFPA STANDARDS. THE CONTRACTOR SHALL INCLUDE THE COST OF SAT6FYING SUCH CODES AND STANDARDS IN HIS BID. FOLLOWING COMPLEfION OF THE FIRE PROTECTION WORK, FURNISH TO THE OWNER, IN DUPLICATE, CERTIFICATES OF INSPECTION AND APPROVAL BY REGULATORY AGENqES HAVING JURISDICTION. (1) �EMONSTRATE TO THE OWNER'S SATISFACTION THE PROPER OPERATION OF EACH OF THE SYSTEMS COMPRISING TMS WNTRACT BEFORE FINAL PAYMENT. (2) IIAIAEDIATELY CORRECT ANY WORK FOON� AT VARIANCE WITH THESE SPECIFlCATIONS, THE NAiIONAL, STATE, AN� LOCAL CO�ES, AND REQOIREMENTS OF GWERNING REGUTATORY AGENQES. 3. VISIT TO THE SITE A. THE WNTRACTOR SHALL VISIT THE SITE OF THE WORK AND BECOME FAIAILIAR WITH ALL CON�ITIONS AFFECTING THE WORK. THE SOBIAISSION OF A PROPOSAL SHALL PREsuaaosE KNow�EocE oF n�� sucH coNoinoNs allo No nooinoNn� coMPENsanoN SHALL BE ALLOWED WHERE EXTRA 1A80R OR MATERIALS ARE REOUIRE� BECAl15E OF icNoenNce oF rHese coNoiTioNs. 4. PROTECTION A. THE fIRE PROTECTION CONTRACTOR SHALL PROVIDE ALL NECESSARY PROTECTION FROM �IRT AND WATER DURWG CONSTROCTION NECESSITATED BY FIRE PROTECTION WORN. PROTECTION IAETHODS ARE Sl1BJECT TO APPROVAL BY THE ARCHITECT. 5. EQUIPMENT AN� MATERIALS A. ALL EQUIPIAENT AND IAATERIALS SHALL 6E NEW AND SHALL CONFORM TO UNDERWRRERS' LABORAiORIES STANDARDS, WHERE APPLICABLE WHERE SPEpFlCAT10N5 DESCRIBE, OR PLANS SHOW, MAiERIALS OR EQUIPMENT OF HIGHER DUALItt THAN REQUIRED BY CODE AND LOCAL RULING, THE DRAwINGS AND SPECIFlCATIONS SHALL GOVERN THE QUALIIY OF THE MATERIAL OR EQUIPMENT. 6. THE CONTRACTOR SHALL SUBMIT PROOF, IF REQUESTED BY THE OWNER THAT iHE MATERIALS, APPLIANCES, EQUIPMENT OR DEVICES FURNISHED AND INSTALLED UNDER TH6 WNTRACT, MEET THE REQUIREMENTS OF THE UN�ERWRITERS� IABORATORIES, INC., AS REGAROS FIRE AN� CASUALiY HAZAR�S. THE IABEL OF OR LISTING BY THE ON�ERWRITERS' LABORATORIES, INC. WILL BE ACCEPTED AS CONFORMING WITH THIS RE�UIREMENT. W LIEU OF 7HE LABEL OR LISTING, THE WNTRACTOR MAY SUBIAIT IN�EPENDENT PROOF SATISFACTORY TO THE ARCHITECT THAT THE MATERIALS APPLWNCES OR �EVICES CONFORM TO THE PUBLISHE� STANOARDS, INCLU�ING MEfH0�5 OF TESi OF iHE UNDERWRITERS' IABORATORIES, MC. UNDERWRIiERS' IABORATORIES, INC. AND R$ PUBLICATIONS WILL BE REFERRED TO HEREINARER BY THE ABBREVIATION UL, WRH OR WITHOUT ADDITIONAL IDENTIFYING SYMBOLS. 6. GUARANTEE A. THE FlRE PROTECTION CONTRACTOR SHALL GUARAMEE FOR A PERIOD OF ONE YEAR THAT ALL WORK AND EQUIPIAENT WILL REMAW FREE FROM ALL DEFECTS IN WORKMANSHIP AND MATERIALS, AND iHAT IT WILL COMPLY WITH ALL THE SPEQFlC REOUIREMENTS OF iHE SPECIFlCATIONS AND OTHER CONTRACi DOCUTAENTS GOVERNING THE WORK. B. ALL WORK FOUND BY THE ENGMEER TO BE DEFECiNE WILL BE REPLACED WITH NEW WORK MEEiING ALL THE REQUIREIAENTS OF THE CONTRACT. THE FlRE PROTECTION CONTRACTOR WILL BEAR ALL COSTS OF SUPPLYING SUCH NEW WORK, AND INSTALLING AND RNISHING SAME, AND WILL ASSUME ALL COSTS FOR REPLACING OTHER WORK DAMAGED BY THE REMOVAL AND REPUCEMENT OF ANY OF iHE WORK. iHE FlRE PROTECTION CONTRACiOR WILL BEAR ALL COSTS FOR FREIGHT, DRAYAGE AND DEMURRAGE, AND ALL IABOR W CONNECTION THEREWITH. 7. CUiTING, PAiCHING, FIRESTOPPING AND PAINTING A. THIS CONTRACTOR SHALL BE RESPONSIBLE FOR WTfING ALL HOLES REQUIRED FOR WSTALLATION OF FlRE PROTECTION WORK. HOLES SHALL BE CUT IN A NEAT MANNER SATISFACiORY TO THE ARCHITECT. B. UNLESS NOTED OTHERWISE, ALL HOLES OR DAMAGE CAUSED BY THE REIAOVAL OF ENISTING WORK OR iHE MSTALLATION OF NEW WORK SHALL BE PROPERLY PATCHED BY TH6 CONTRACTOR. HOLES SHALL BE NEATLY PATCHED AND PAIMED WRH SUITABLE MATERIAL TO MATCH E%ISiING SURFACES. HOLES THROUGH FLOORS OR FIRE WALLS SHALL BE SEALED WITH THE APPROPRIATE INTUMESCENT CAULN, PUT7Y, STRIP OR SHEET NPE FIRE BARRIER PRODUCT. C. FIRESTOP SYSTEM (REQUIRED FIRESTOPPING MATERIALS) SHALL BE DETERMINED BY THE WALL OR FLOOR/CEILING ASSEMBLY AN� PENEfRA710N IYPE AN� SHALL BE UL LISTEO AN� TESTED IN ACWR�ANCE WITH ASTM E814. FIRE RA71NG OF THE FIRESTOP SYSTEM SHALL BE EQUIVALENT TO THE ASSEMBLY WHICH IS PENEfRATE�. �. ACCEPTABLE FIRE BARRIER PRO�UCTS: HILTI "FS-ONE", NELSON `FLAMESEAL" OR APPROVED EOUAL AS MANUFACTURE� BY 3A�. 8. CLEANING AN� PAINTING A. CLEAN NEW PIPING AfTER WORK IS COMPLEfE TO REMOVE PIPE DOPE, LOOSE IAILL SCALE AN� OTHER EXTRANEOUS MATERIALS. B. TOl1CH UP ANO REPAIR ANY DAMAGE� FACTORY RNISHES ON EOUIPIAENT AN� MATERIALS RELEA5E0 FOR CON$TRUCTI�N °NOEa rHe aniNnNc oiwsioN oF rHE Su6ject�o compliance with allregula�ions of S�a�e antl Local Codes City of Carmel r �un��\i lo•rvalM��_ DATE: 03�27�20 9. COORDINATION AND CONDUCT OF WORK �5. FIRE PROTECiION A FIRE PROTECiION DRAWINGS ARE DIAGRAIAMATIC, INDICATING GENERAL ARRANGEMENT, q, GENERAL APPROXIMATE SRES, GENERAL LOCATIONS OF EQUIPMENT, SPRINKLER HEADS, AND PIPING. VERIFY DIMENSIONS W FIELD; ADJUST TO MANUFACTURER�S SHOP DRAWINGS. (�)FURNISH ALL IABOR, WNSTRUCTION EQUIPMENT AN� MATERIALS NECESSARY FOR DO NOT SCALE DRAWINGS. THE COMPLEfE INSTALlATION OF THE FIRE PROTECTION SYSTEM AS INDICATED. ALL WORK SHALL BE IN STRICT COMPLIANCE WITH ALL GOVERNING STATE AND LOCAL CO�E B. ALL REQUEAS FOR INFORMATION SUPPLEMENTAL TO THE WNSTRUCTION DOCUMENTS REOUIREMENTS, IN FULL CONFORMItt WITH THE BEST CURRENT TRADE PRACTICES ANO SHALL BE SUBMITfED IN WRITING TO THE ARCHITECT FOR DISTRIBUTION TO THE SUBJECT TO APPROVAL OF THE ARCHITECT OR HIS REPRESENTATNE. APPROPRIATE PARtt(S). (2) ALL WORK DEfAILS NOT COVEREO IN THESE SPEQFlCAiIONS SHALL BE GWERNEO C. �RAWINGS AN� SPECIFICATIONS ARE TO BE CONSI�ERED AS SUPPLEMENTING FACH 8Y THE RWUIREMEMS OF THE IAIEST EDI710N OF NFPA-13. OTHER. WORK SPEQFIE� BUT NOT SHOWN, OR SHOWN BUT NOT SPECIFIE�, SHALL BE PERFORMED OR FURNISHED AS THOUGH MENTIONE� IN BOTH SPEGFICATIONS AN� (3) SUPPORT ALL SPRINKLER PIPING PER NFPA iJ REOUIREMENiS. �RAWINGS. (4) PIPE BENDING IS NOT ACCEPTABLE. �. ARCHITECTURAL AN� STRUCTURAL DRAWINGS SUPERSE�E FIRE PROTECTION �RAWINGS. �EfERMINE THAT WORN OF THIS �IVISION CAN BE ACCOMMO�ATE� WITHM SPACES (5) ALL FlRE PROTECTION PIPING SYSTEMS MUST BE COMPLEIELY DRAINABLE. PROVI�ED. NOiIFY ARCHITECT OF ANY INTERFERENCES BEFORE STARTING INSTALlATION. 8. �ESIGN AND INSTALLATION REQUIREMENTS E. �EfERMINE SIZE$ LOCATIONS FOR CHASES AN� OPENINGS NECESSARY FOR INSTALLATION (1) PREPARE SHOP DRAWMGS AND HYDRAULIC CALWUTIONS IN ACCORDANCE WITH OF PWMBING ANO FIRE PROTECTION WORK. COOPERATE WITH OTHER TRA�ES IN NWA REQUIREIAENTS. SUBMIT �RAWINGS TO LOCAL GOVERNMENT AGENQES ANO SEffING SLEEVES, INSERTS AND HANGERS. OWNER'S INSURANCE UNDERWRITER FOR APPROVAL. AFfER THE ABOVE AND PRIOR TO F. COORDINATE THIS WORK WITH ALL TRADES. ARRANGE OPERATIONS SO AS NOT TO CONSTRUCiION, SUBMIT THE DOCUMENTS i0 THE ARCHITECT AND ENGINEER FOR �EIAY INSTAl1ATI0N OF COMPLEfION OF ANY PARTS OF INTERREIATE� WORK SO THAT REVIEW. CONSTRUCiION MAY PROCEED ON SCHE�ULE. (7)�) THE CONTRACTOR SHALL ESTABLISH ACTUAL AVAIIABILIN OF THE WATER FROM G. COOPERATE WITH ALL TRA�ES IN PREPARING INTERFERENCE DRAWINGS FOR AREAS HISTORICAL DATA OR BY PERFORMING A FLOW TEST. WHERE THERE IS POSSIBLE CONFLICT BE7WEEN TRADES. EXACT LOCATION OF PIPES, ���p� VERIFY HAZAR� OCCUPANCY CLASSIFlCATION REQUIREMENT WITH THE OWNER. AN� EQUIPMENT SHALL BE BASE� ON FIEL� MFASUREMENTS WITH FINAL ARRANGEMENT �EfER1AME� BY INTRA-TRADE AGREEMENTS SO&IECT TO ARCHITECT'S APPROVAL (p) CONiRACTOR SHALL BE LICENSED BY ALL STATE AND LOCAL AUTHORITIES. H. ARCHITECT RESERVES THE RIGHT TO IAANE REASONABLE CHANGES IN INDICATED �3�INSTALL LLL OR F.M. APPROVED SPRINKLERS AS REQUIRED FOR COVERAGE. ALL LOCATIONS WITHOUT EX�RA WST TO THE OWNER. SPRINKLERS SHALL BE NEW AND CENTERED IN CEILING TILE WHERE POSSIBLE. I. ALL WORK SHALL BE WSTALLE� IN A NEAT AND WORKA�ANLIKE MANNER BY FIRST-CVSS �q� pROVIDE SPRINKLER HEADS TO MATCH EXISTING HEA�S INSTALLED IN A�JACENT IAECHANICS. THE CONTRACTOR SHALL PROVI�E ADEQUATE AND WMPEfENT SUPERVISION AR�S. IYPE AN� MANUFACTURER SHALL BE APPROVE� BY THE OWNER. OF THE JOB AS RE�UIRED. J. PIPMG AN� EOUIPMENT SHALL BE ARRANGED SUBSTANTIALLY AS IN�ICATE�. ANY (5) COORDINATE SHUiDOWN OF THE EXISTING SPRINKLER SYSTEM WITH iHE OWNER. CHANGE RESULTING IN A SAVMGS IN 1A80R OR MATERIAL SHALL BE MA�E ONLY IN ACCORDANCE WITH A CONTRACT CHANGE ORDER. DEVIATIONS SHALL BE MADE ONLY (6) FIRE PROiECTION PIPING SHALL BE iESTED WITH WATER AT A PRESSURE OF 200 WHERE NECESSARY TO AVOID INTERFERENCES AND ONLY AFfER �RAWINGS SHOWING THE P51 FOR 2 HOURS. PROPOSED �EVIATIONS HAVE BEEN SUBMITTE� TO AND APPRWE� BY THE ARCHITECT. C. FlRE PROTECTION EOUIPIAENT AND MATERIALS K. COORDINATE ALL SHUT�OWNS OF FIRE PROTECTION SYSTEM IN ADVANCE WITH THE (1) PIPE AND FITfINGS OWNER. 10. SUBMITfALS a. FIRE PROTECTION PIPING, SHALL BE WELDE� OR SFAMLESS BIACK STEEL AS SCHE�ULE� IN NFPA, WITH THREA�ED JOINTS. A.PROVI�E A MINIMUM OF SIX (6) SUBMITTAL �RAWINGS FOR EQUIPMENT, SPRINKLER b. FITTINGS SHALL BE MALLEABLE IRON, THREADE� ttPE, AS SCHEDULE� IN NFPA. HEA�S, FIRE PROTECTION HYDRAULIC CALCULATIONS, AN� ALL OTHER SPECIFIE� COMPONENTS FOR APPROVAL BY THE ARCHITECT AN� ENGINEER. (2) SPRMKLER HEA�S B.WHERE ONLY ONE MAKE OF EQUIPMENT IS NAMED, IT SHALL BE PROVI�E� AS SPECIFIE�. a. SPRMKLER HEA05 SHALL BE UL LISTE� AND FM APPROVE�, IAEEfING NFPA C.VERBAL REOUESTS OF APPROVALS FOR ANY SUBSTITUTION WILL NOT BE BINDING ON THE REOUIREMENTS. ARCHITECT AN� OWNER. b. TEMPERATURE RATING OF HEA�S SHALL BE 1fi5 DEGREES FAHRENHEIT. �.THIS WNTRACTOR ASSUMES ALL RESPONSIBILIIY FOR ALL COS7S FOR RE�ESIGN c. ACCEPTABLE MANUFAC7URERS: VIKING, CEMRAL, STAR, RELIABLE. CHANGES NECESS4RY BY ALL TRAOES TO ACCOMMO�ATE THE USE OF EQUIPMENT NOT SPEQFIED ON PROJECT DOCUMEMS. d. CONCEALED HEAD iYPE FlNISH/COLOR i0 MATCH ADJACENT SURFACE. E.BIOS SHALL BE BASEO 11PON THE SPECIFIED PRODUCTS OR LISTED ALTERNATNES. �RAWINGS AND SPEQFlCATIONS ARE BASED ON THE PRODUCTS SPEQFIED BY nPE, FIRE PROTECTION NOTES MO�EL, AND SRE AN� THUS ESTABIJSH MINIMUM QUALITIES, WHICH SUBSTITUTES MUST MEEf TO QUALIFY FOR REVIEW. F.SHOULD THE CONTRACTOR PROPOSE TO FURNISH MATERIALS, EQUIPMENT, AN� �EVICES, �, DRAWINGS ARE DIAGRAMMAiIC: DETERMME LOCATIONS OF $Y4EIA5 AND OTHER THAN THOSE SPEQFIED AN� LISTEO, THE WNTRACTOR SHALL SUBMIT A WRITfEN COMPONENTS M FlELD. REQUEST FOR SUBSTITUTIONS, TO THE ENGMEER, AT LEAST FOURTEEN (14) CALEN�AR DAYS PRIOR TO BID OPENMG THE REQOEST SHALL BE AN ALTERNATE TO THE ORIGINAL y. PRCH PRESSURE PIPING IN DIRECTION OF FLOW. BIO AN� SHALL MCLU�E AND BE ACWMPANIE� WITH COMPLEfE SPECIRCATIONS COT SHEEf SUBMITTAL AS OUTLMEO IN SECTION 11.A OF THIS SPEQFlCATION SECTION, 3, pRODUCT INSTALLATION SHALL ADHERE TO MANUFACTURERS' REQUIREMEMS. COIAPLETE WITH DESCRIPTNE (MANUFACTURER, BRAND NAIAE, CAiALOG NUMBER, ETC.) AND TECHNICAL DATA FOR ALL IiEMS. INDICAiE ANY ADDITIONS OR DEDUCTIONS TO THE q. NEITHER ACCURACY NOR COMPLETION OF UTILIN LOCATIONS SHOWN ON CONTRACT PRICE WITH THE SU841TUTION SUBMITfAL AND ON THE BID FORM. DRAWINGS IS GUARAMEED. DETERIAME EXACT LOCATIONS OF ERISTING G,ACCEPTANCE OR REJECiION OF iHE PROPOSED SUBSiIiUT10N5 SHALL BE SUBJECT i0 UiILITIES M FlELD, WHETHER OR NOT SHOWN ON DRAWINGS. ExERQ$E APPROVAL OF THE ARCHRECT AND ENGWEER. IF REQUESTED, iHE CONTRACTOR SHALL CAUTION AND IDENTIFY LOCATIONS OF UNMARKED UTILItt LMES AS SUBMIT INSPECTION SAMPLES OF BOTH THE SPECIFlED AND THE PROPOSED SUBSTITUTE NECESSARY TO PERFORM WORN OF THI$ SECTION. ITEMS. 5. ALL WORK SHALL BE IN ACCORDANCE WITH ALL APPLICABLE CODES. H,IF ANY SUBSTITUTIONS ARE APPROVED, AN ADDENDUM LISTING THE APPROVED ITEM(S) 6. R SHALL BE THE RESPONSIBILItt OF iH15 CONTRACTOR TO COORDINATE HIS WILL BE ISSUE� TO ALL BID�ING CONTRACTORS PRIOR TO THE BID �ATE. WORK WITH THAT OF ALL OTHERS TRADES AND GENERAL ARCHRECTURE. I. IN ALL CASES WHERE SUBSTITUTIONS ARE PERMITfED THE CONTRACTOR SHALL BEAR ANY EXTRA COST OF EVALUATING THE EOUALI7Y OF THE MATERIAL AND EQUIPMENT TO 7. ANY IMERFERENCE SHALL BE BROUGHT TO iHE ATTENTION OF THE BE INSTALLED. CONSTRUCTION MANAGER AND SHALL BE RESOLVED PRIOR i0 THE INSTALLATION OF THE WORK INVOLVED. J. WHERE ONLY ONE MAKE IS NAMED IN THE SPECIFICATIONS OR ON THE ORAWINGS, IT SHALL BE PROVIDE�. e. VERIFY EKACT SIZES, LOCATIONS, INVERTS AND ELEVATIONS PRIOR TO FABRICAiING AND INSTALLMG ANY PIPING. K.VERBAL REQUESTS OR APPROVALS SHALL NOT BE BIN�ING ON THE ENGINEER OR OWNER. 9. ALL PIPING PENEiRATMG CEILINGS AND WALLS SHALL BE INSiALLED WITH 11.EQUIPMENT AND PIPING I�ENTIFICATION CHROME (STAINLE55 WHERE NOTED) PIATED ESCUTCHEONS AT THE PENEiRATION. PIPING PENEfRATMG RATE� PARTITIONS SHALL BE PROTECTE� A.IABEL ALL PIPING SYSTEMS WITH PIPE MARKERS MSTALLED ADJACENT TO VALVES, AS BY LOCAL CODE AUTHORIIY. WHERE PIPES PASS THROUGH WALLS OR FLOORS, NEAR ALL BRANCHES AND CHANGES OF DIRECTION, AT 20 FEEf INTERVALS ON STRAIGHT RUNS OF PIPE, AN� AT ACCESS 10. ALL SLEEVES THROUGH CONCREfE FLOORS AND ALL CORE �RILLING OF DOOR LOCATIONS. ALL PIPE MARKERS SHALL WNFORM TO ANSI A13.1 "SCHEME FOR CONCREfE FLOORS AND WALLS SHALL BE BY THIS CONTRACTOR. THE IDENTIFICATION OF PIPING SYSTEMS". 11. RUN PIPMG CONCEALED, UNLESS SPECIREO O7HERWISE, AN� CLEAR OF B.THE CONTRACTOR SHALL FURNISH AN� INS�ALL A SYSTEM OF NAMEPLATES DESIGNE� TO CEILING WSERTS. IDENTIFY EACH PIECE OF EQUIPMENT. 12 PROVI�E CIAMPS, OFFSEf$ EXPANSION JOINTS, ANCHORS AND GUIDES AS (1) NAMEPLATE LETTER AN� NUMBERS SHALL MATCH EQUIPMENT �ESIGNATION AS NECESSARY TO PREVENT STRESS ON PIPING. iNoicnTEo oN THE oRnwiNcs. 13. SPRINKLER CONTRACTOR SHALL HYDRAULICALLY CALCUTATE NEW SYSTEA� (2) NAMEPLATES SHALL BE UTAINATED PHENOLIC WITH BLACK SURFACE AND WHRE REOUIREMENTS BASED ON THE USE GROUP, OCCUPANCY LOA�, CORE. USE 1/16" THICK MATERIAL FOR PlATES UP TO 2" BY 4". FOR IARGER CONSTRl1CTI0N IXAS9FlCATION, Efq AS INDICATED IN THE SPECIFlCATIONS. SIZES USE 1/8" THICK LEffERS AN� NUMBERS SHALL BE A MINIMUM OF 1�7' HIGH. 14. SPRMKLER CONTRACTOR SHALL OBTAIN A COPY OF THE BUILDING SYSTEA� (J)FASTEN NAMEPLATES TO ALL E�UIPMENT BY THE USE OF STAMLESS STEEL SHEEf FLOW TEST. THESE FlN�MGS SHALL BE USE� FOR THE HY�RAULIC IAEfAL SCREWS. SPRMKLER SYSTEM CALWlATIONS. 12 AS-BOILT DRAWMGS 15. SPRINKLER CONTRACTOR SHALL SCHEDOLE WALN THROUGH WITH FlRE A.AS WORK PROGRESSES, RECORD ON A SET OF "AS-BUILi" PRINTS ANY DEVIAilONS PREVENTION INSPECTOR FOR RNAL ACCEPTANCE AS RWUIRED. FROM DESIGN DRAWINGS, DELNER i0 THE OWNER BEFORE SUBIAITfING REOUEA FOR �6. REVISE SPRINKLER SYSTEM WITHIN ALL AREA OF WORN TO ACWMMODATE FINAL PAYMENT. THE "AS-BUILT" PRINTS SHALL BE AN ACCURATE DEPICTION OF THE NEW WORN. PROJECT AS COMPLEfED. 13.OPERATING AND MAINTENANCE MANUALS 17. SPRMKLER CONTRACTOR IS TO VERIFY SPRINKLER DISTRIBOTION SYSTEM & lAYOUT COMPLIES WITH ALL NFPA 13 REOUIREMENTS. A.PROVI�E TO OWNER, AT PROJECT TURNOVER, THREE (3) HAR�BOUN� COPIES OF �8. REVISE SPRINKLER DISTRIBUTION SYSTEA� WITHIN NEW TENANT SPACE TO OPERATING AND MAIMENANCE MANUALS FOR ALL EQUIPMENT AN� SYSTEMS INSTALLE�. qCCOMMODATE NEW OFFlCE lAYOUT. MANUALS SHALL INCWDE ALL RELEVAM WFORMATION NEE�EO FOR DAY-TO-�AY OPERATION AND MANAGEMENT OF EACH SYSTEM, AS WELL AS EQUIPMENT MAIMENANCE �g FlRE PROTECTION PlANS AS SHOWN ARE FOR WNDITIONAL PIAN APPROVAL INFORMATION REQUIRE� TO SUPPORT THE MAINTENANCE PROGRAM. ONLY. FIRE PROTECTION CONTRACTOR IS TO OBTAIN CURRENT HY�RANT 14.OPERATING INSTRUCTIONS TEST DATA AND PROVIDE HY�RAULIC CALCULATIONS FOR SYSTEM PIPE SIZING IN ACCORDANCE WITH NFPA 13. CONTRACTOR IS TO Sl1BMIT SHOP A.PROVI�E TO OWNER AFTER ALL EOUIPMENT IS IN OPERATION AN� AT AN AGREEABLE �RAWINGS IN�ICATING HY�RAULIC CALWLATIONS, PIPING UYOl1T & SIZING. TIME INSTRUCTIONS FOR THE PURPOSE OF TRAINING OWNER'S PERSONNEL IN ALL SHOP �RAWINGS AN� CALCl1lATI0NS ARE TO BE SIGNE� & SEALEO BY A PHASES OF OPERATION AND MAINTENANCE OF EOUIPIAENT AND Sl'STEMS. SCHEDULE CERTIFlE� FlRE PROTECTION SYSTEM �ESIGNER. ALL WORK IS TO BE DONE TRAINING WITH OWNER, PROVIDE AT LEAST SEVEN DAYS PRIOR NOTICE PROVIDE THIS IN ACCORDANCE WITH ALL GOVERNMENT, STATE, & LOCAL, CODES. iRAINING TO ALL PERSONNEL AND ON ALL SHIRS. 20. STATE CERTIFlED RRE PROTECTION SYSTEM �ESIGNER SHALL SUBMIT FlNAL PIANS FOR PERIAITfING AN� CONSTRUCTION. E%ISTING SPRINKLER MAIN / / / / / FIRE PROTECTION PLAN l�q.. = 1._Q�� FIRE PROTECTION PLAN CODED NOTES � PROVIDE A MODIFIED HYDRAULICALLY CALWLATED AUTOMATIC SPRINKLER SYSTEM FOR THE AREA INDICATED. SPRINKLERS SHALL BE DESIGNED FOR LIGHT HAZARD OCCUPANCY, DELNERING A �ENSIN OF 0.10 GPM/SQ.FT OVER THE HY�RAULICALLY MOST REA�OTE I,5�0 SQ. R. (165 DEGREE F RATED CONCEALED PENDANT HEAD M FlNISHED CEILINGS) REMOVE E%ISTING SPRWKLER HFA� AND WSTALL NEW 1" OFFSEf � NEw sPRiNK�ER H�no wiTH cEiuNc PurE. FlNISH/COLOR TO IAATCH ADJACENi SURFACE. NEW SUSPENDED CEILING. NEW PENDANT SPRINKLER DETAIL SCALE:NONE � Inregrared Lf�En�'meerinp r.o���ta�is,l,��. 9700 ROCNSIDE RD. SUITE 290 CLEVEIAND.OX 44125 PHONE:716901�6711 FA%:216901-6712 � � j PROJEC�LOCATfON Key Plan: � 2 4�8 � � � Scale: _" NELSOI� Nelco Architedure, Inc. a licensed affliate 30 West Monroe Street - Suite 200 Chicago, IL 6060&2409 Phone: (312)263-6605 (312)2]fi-4340 OWNER'S PROJECT MANAGER Jones Lang LaSalle Leslie Soto 540 W. Madison St, Suit eIL9-540-04-55 Chicagq [L 60661 T:312.909.2139 E:lesliesoto@am.jlLmm MEPENGINEER Integrated Engineering ConsWtants,Inc (IEC) Tim Vlning 9700 Rockside Road, Suite 290 Cleveland, OH 44125 T. 216.901.67ll E: tim.vining@ieC-inCcc GENERALCONTRACTOR Mid America Contracting, Inc. Tyler Crawford 107 N. Main Street, Suite 3A Columbia, IL 62236 T: 618.589.2770 E: tic@midamericacontracting.com ARCHITECT OF RECORD Nelm Architecture, Inc. Vincent Paul Duet IN. LIC NO: AR11500046 Exp: 12/31/2021 T: 215.825.6620 E: vduet@nelsonww.com ConsWtant'. MERRILL� A BANK OF AM ERICA COMPANY Cllent. INW-044 BofA Indianapolis MLWM Pantry Refresh, Sth Floor 510 96th Street Indianapolis, IN 46240 Project TiHe & Nddress: FIRE PROTECTION PLAN AND SPECIFICATIONS SheetTiHe�. � PE118005]5 i�l • - STAtE oF ; Q- �:Po''.�NoIAN?.' 2�� ''. FssroNn�e��� ��.c �-��/���,,��%/'� Seal: Proj. No'. 19.00OSU].000 Designer'. ERO;MBM �rawn By: ]PH Reviewed By. HHH Pmjcct Managcr. M]L qppmved By: HHH FPO-1 ALL �IMENSIONS AN� LONDITIONS MOA BE CHECKED AND VERIRED ary s�rE ar TnE mrvrRncroR nrvo sue-mvTancrons an�oR ro PEFFOkMMG THE WOFK. THE PRO]ECT MHNAGEk SHALL RE NOTIFIED IN WRITING �F ANY �ISCREPANCIES PRIOR TO PROCEE�ING WITH THE W�RK. ;o rveisary wan�ow�oe, ac zozo nu a�sHTs n�aveo