Loading...
HomeMy WebLinkAboutM2.1 Mech HVAC SpecsRELEA5E0 FOR CONSTRIICTI�N Su6jec��o compliance with allregula�ions of S�a�e antl Local Codes City of Carmel r �un��\i lo•rvalM��. MECHANICAL SPECIFICATIONS 1. GENERAL PROVISIONS A. THE PROVISIONS OF THE WSTRUCiIONS TO BID�ERS, GENERAL CON�ITIONS, SUPPLEMENTARY CONDITIONS, ALTERNATES, ADDENDA'S', AND DIVISION 1 ARE A PART OF iM5 SPEQFlCATION. CONTRACi0R5 AND SUBCONTRACTORS SHALL ExAIAME SAME AS WELL AS OTHER DIVISIONS OF THE SPECIFlCATION$ WHICH AFFECT WORK UNDER TH5 DIVI90N. B. THI$ CONTRACTOR SHALL PROVIDE ALL IABOR, EQUIPMENT, $UPPLIES, SERVICES, AND SHALL PERFORM ALL WORN COMPLETE AND IN STRICT ACCORDANCE WITH THIS SPEQFlCATION AND APPLICABLE DRAWINGS. ANY DEVIATIONS SHALL BE 0.EARLY DEFWED AND REIARE� IN ACCORDANCE WITH SECTION 10.F OF THIS SPECIFlCATION. C. THI$ CONTRACTOR 5 INSTRUCTED TO READ CAREFULLY THE SPECIFlCATIONS FOR ALL PART$ OF THE WORK, WHICH INCLUDE THE ARCHRECTURAL, ELECTRICAL, MECHANICAL, PLUMBING, FIRE PROTECTION, CIVIL, STRUCTURAL AND ALL OTHER DRAWMGS AS WELL AS THE SPECIFlCATIONS FOR ALL THE DIVISIONS THAT ARE PART OF THE CONTRACT DOCUTAENTS. D. ALL REMS OF IABOR, IAATERNL, AND EQUIPMENT NOT SPEQFlCALLY IAENTIONED HEREIN OR SHOWN ON PLAN, BUT MCIDENTAL i0, OR RE�UIRED FOR THE COMPLETE INSTALLATION AND PROPER OPERATION OF iHE WORK, SHALL BE FURNISHED AS IF CALLED FOR IN DEiAIL BY THE SPECIFlCATIONS OR DRAWINGS. E AS USED IN THIS SPECIFlCATION, 'PROVIDE' MEANS "FURNISH AND INSTALL". "FURNI54f MEANS "TO PURCHASE AND DELIVER TO THE PROJECi SRE COIAPLETE WITH EVERY NECESSARY APPURTENANCE AND SUPPORT,- AND "INSTALC MEANS "TO UNLOAD Ai THE DELNERY POINT AT THE SRE AND PERFORM EVERY OPERATION NECESSARY FOR PROPER INSTALLATION PER CODES AND MANUFACTURERS REOUIREMENTS, TO ESTABLISH $ECURE IAOUNTING AN� CORRECT OPERATION AT THE PROPER LOCAiION IN THE PRQIECT: 2.PERMITS, CODES, WSPECTIONS AND TESTS A. THE HVAC CONTRACTOR SHALL SECURE AND PAY FOR ALL PERMITS AND INSPECTIONS REQUIRED FOR iHE PROSECUTION OF HVAC WORK. ALL PERMITS AND CERTIFlCATES OF INSPECTION AND APPROVAL SIGNED BY THE CONTROLLING BUILDING DEPARTMENT $HALL BECOIAE PROPERiY OF THE OWNER B. DRAWINGS INDICATE THE MINIIAUA� DESIGN RE�UIREIAENTS. NATIONAL, STAiE, AND LOCAL CODES SHALL BE FOLLOWED, COMPLY WITH THE LATEST EDITIONS OF THE STATE MECHANICAL CODE, NFPA, SIAACNA, AND ASHRAE STANDARDS. THE CONTRACTOR SHALL INCLUDE THE COST OF SATISFYING SUCH CODES AND STANDARDS IN THE BID. C. FOLLOWING COIAPLETION OF THE HVAC WORK, FURMSH TO THE OWNER, IN DUPLICATE, CERTIFlCATES OF INSPECTION AND APPROVAL BY REGULATORY AGENCIES HAVMG JURISDICTION. (1) DEMONSiRATE TO iHE OWNER$ SATISFACiION THE PROPER OPERATION OF EACH OF THE SYSTEMS COMPRISING THIS CONiRACT BEFORE FINAL PAYMENT. (2) IMME�IATELY CORRECT ANY WORK FOUN� AT VARIANCE WITH THESE SPEQFICATIONS, THE NATIONAL, STATE, ANO LOCAL CODES, AND REQUIREMENTS OF GOVERNING REGUTATORY AGENCIES. (3) TEST PIPING FOR LEANS: REPAIR LEANS IN COPPER TUBING BY SWEATING OUT JOINT; THOROUGHLY CLEANING BOTH TOBE AN� RTfING, AN� RESOLDERING. CORRECT LEANS W SCREWE� JOINT BY REPLAQNG THREA� OR RTfING OR BOTH. (4) PROVIDE SERVICES OF A CERTIFlED AA.B.C. OR N.EE.B. TEST AGENCY. CONDUCi ALL TESTS IN ACCORDANCE WITH ASSOpATED AIR BALANCE COUNCIL STANDARDS. TEST AND ADJUST AIR HANDLING SY4EIA TO WITHIN 59. OF DESIGN REQUIREMENTS. J. VISIi TO THE SRE A. THE CONTRACTOR SHALL VISIT THE SRE OF THE WORK AND BECOME FAMILIAR WITH ALL CONDRIONS AFFECTING THE WORK. THE SUBIAISSION OF A PROPOSAL SHALL PRESUPPOSE KNOWLEDGE OF ALL SUCH CONDITIONS AND NO ADDITIONAL COMPENSATION SHALL BE ALLOWED WHERE EXiRA LABOR OR MATERIALS ARE REQUIRED BECAUSE OF IGNORANCE OF THESE CONDITIONS.. 4.PROTECTION A. THE HVAC CONTRACTOR $HALL PROVIDE ALL NECESSARY PROTECTION FROM DIRT AND WATER DURING CONSTRUCTION NECESSITATED 8Y HVAC WORK. PROTECTION METHODS ARE SUBJECT TO APPROVAL BY iHE ARCHRECT. 5.EQUIPMENT AND MATERIALS A. ALL EQUIPMENT AND MATERIALS SHALL BE NEW AND SHALL CONFORIA TO UNDERWRRERS' LABORATORIES STANDARDS, WHERE APPLICABLE. WHERE SPECIFICATIONS DESCRIBE, OR PLANS SHOW, MATERIALS OR EQUIPMENT OF HIGHER QUALItt THAN REOUIRED BY CODE AND LOCAL RULING, THE DRAWINGS AND SPECIFICATIONS SHALL GOVERN THE QUALItt OF THE MATERIAL OR EQUIPMENT. USED EOUIPMENT OR MATERIALS ARE PROHIBRED UNLESS NOTED OTHERWISE. B. NEW OR EXISTING TO REMAIN EQUIPMENT SHALL NOT BE OPERATED DURING CONSTRUCTION. HVAC CONTRACTOR SHALL COORDINATE WITH OTHER TRADES AND PROVIDE TEMPORARY SPACE CONDOIONING IN ORDER TO MAINTNN TEMPERATURES AND HUMI�Itt LEVELS AS REQUIRED FOR GENERAL CONSTRUCTION. C. THE CONTRACTOR SHALL SUBMIT PROOF, IF REQUESTED BY THE OWNER, THAT THE MATERIALS, APPLIANCES, EQUIPMENT OR DEVICES FURNISHED AND INSTALLED UNDER THIS CONTRACT MEEf THE RE�UIREMENTS OF THE UN�ERWRITERS' IABORATORIES, INC. IN REGARDS TO FIRE AN� CASUALN HAZARDS. THE IABEL OF OR LISTMG BY THE UNDERWRRERS' LABORATORIES, MC. WILL BE ACCEPTED AS CONFORMING TO THIS REQUIREMENT. IN LIEU OF THE LABEL OR LISTING, THE CONTRACTOR MAY SUBMIi INDEPENDENT PROOF SAT6FACTORY TO THE ARCHRECT THAT THE A�ATERIAL, APPLIANCES OR DEVICES CONFORM i0 THE PUBLISHED STANDARDS, INCLUDMG METHODS OF iESi FOR THE UNDERWRITERS' LABORATORIES MCORPORATED. UNDERWRIiERS IABORATORIES, MC. AND ITS PUBLICATIONS WILL BE REFERRED i0 HEREINARER BY iHE ABBREVIATION UL. WITH OR WIiHOUT ADDITIONAL IDENTIFYING SYMBOLS. 6.GUARANTEE A. iHE HVAC WNTRACTOR SHALL GUARANTEE FOR A PERIOD OF ONE YEAR iHAT ALL wORK AND EQUIPMENT WILL REMAIN FREE FROM ALL DEFECiS IN WORKMANSHIP AND AIAiERIALS, AND iHAT IT WILL C0IAPLY WITH ALL THE SPECIFIC REQUIREMENTS OF THE SPEpFICAT10N5 AND OTHER CONTRACi DOCUMENTS GOVERNING iHE WORK. B. ALL WORK FOUND BY THE ENGINEER TO BE DEFECTNE WILL BE REPLACED WITH NEW WORK MEETING ALL iHE REOUIREMENiS OF THE CONTRACi. THE HVAC CONiRACTOR WILL BEAR ALL COSiS OF SUPPLYING SUCH NEW, AND INSTALLING AND FINISHING SAME, AND WILL ASSUTAE ALL COSTS FOR REPIACING OiHER WORK DAMAGED BY iHE REMOVAL AND REPLACEMENT OF ANY OF iHE WORK. THE HVAC CONiRACTOR WILL BEAR ALL COSTS FOR FREIGHT, DRAYAGE AND DEMURRAGE, AND ALL LABOR IN CONNECTION iHEREWIiH. 7. WTfING, PAiCHING, FIRESTOPPING AND PAINTING A. iHl$ CONTRACTOR SHALL BE RESPONSIBLE FOR WTfING ALL HOLES REQUIRED FOR INSTALUTION OF HVAC WORK. HOLES SHALL BE Wi IN A NEAT IAANNER SAi15FACTORY i0 iHE ARCHITECT. B. CONTRACTOR SHALL EMPLOY AN BUILDING OWNER APPROVED ROOFING CONTRACTOR FOR ALL ROOF PENETRATIONS. ROOF SHALL BE REPAIRED 50 AS NOi i0 VOID ROOF WARRANtt. C. UNLESS NOTED OTHERW6E, ALL HOLES OR DAMAGE CAUSED BY THE REMOVAL OF E%ISTING WORK OR iHE INSTALLATION OF NEW WORK SHALL BE PROPERLY PAiCHED BY THIS CONiRACTOR. HOLES SHALL BE NEAiLY PATCHED AND PAINTED WITH SUITABLE MATERIAL TO MAiCH E%ISTING SURFACES. HOLES THROUGH FLOORS OR RRE WALLS SHALL BE SEALED WITH iHE APPROPRIATE INTUMESCENi CAULK, PUTiY, SiRIP OR SHEEi FIRE BARRIER PRODUCT. D. FlRESTOP SYSTEM (RE�UIRED FlRESTOPPING MATERIALS) SHALL BE DEfER1AINED BY iHE WALL OR FLOOR/CEILING ASSEMBLY AND PENETRATION ttPE AND SHALL BE UL LISTED AND TESiED IN ACCORDANCE WITH ASTM E814, FIRE RATING OF THE FIRESTOP SYAEM SHALL BE EQUIVALENT TO THE ASSEMBLY WHICH IS PENEfRAiED. E. ACCEPTABLE FIRE BARRIER PRODUCTS: HILTI "FS-ONE"NELSON FLAMESEAL"OR APPROVED EQUAL AS 1AANUFACTURED BY 3M. 8. CLEANING AND PAINTING A. CLEAN NEW PIPING ARER WORK IS COMPLEiE i0 REMOVE PIPE DOPE. LOOSE MILL SCALE, AND OiHER EXiRANE0U5 MAiERIALS. B. iOUCH UP AND REPAIR ANY DAMAGED FACTORY FINISHES ON EOUIPMENT AND MATERIALS FURNISHED. OTHER PAINiING WILL BE DONE UNDER THE PAINTING DINSION OF THE SPEGFICATIONS. C. ALL EXISTING NR DISTRIBUTION DEVICES THAT ARE TO BE REUSED SHALL BE CLEANED WITH MILD SOAP AND WATER SOUI�ION AN� THOROUGHLY DRIED. D. ALL EXISTING TO REMAIN HVAC SYSTEMS SHALL BE CLEANED PER CURREM NATIONAL AIR DUCT CLEANING ASSOCIATION GENERAL SPECIFlCATIONS. 9. COORDINATION AND CONDUCT OF WORK A. HVAC DRAWINGS ARE DIAGRAMMATIC, INDICAiING GENERAL ARRANGEMENT, APPROXIMATE SRES, GENERAL LOCATIONS OF EOUIPMENT AND PIPING. VERIFY �IMENSIONS IN FIELD; A�JUST TO MANUFACTURER'S SHOP �RAWMGS. DO NOT SCALE ORAWINGS. B. ALL REQUESTS FOR INFORMATION SUPPLEMENTAL TO THE CONSTRUCTION DOCUMEN7S SHALL BE SUBMITfE� IN WRITING TO THE ARCHITECT FOR DISTRIBUTION TO THE APPROPRIATE PARN(S). C. �RAWINGS AND SPEQFlCATIONS ARE TO BE CONSIDERE� AS SUPPLEMENTING EACH OTHER. WORK SPECIFlE� BUT NOT SHOWN, OR SHOWN BUT NOT SPEQFlED, SHALL BE PERFORME� OR Fl1RNISHED AS THOUGH MENTIONED IN BOTH SPEQFlCATIONS AN� �RAWINGS. �. ANY DISCREPANQES BEfWEEN THE �RAWINGS AN� SPECIFlCATIONS SHALL BE BROUGHT TO THE ATfENTION OF THE ARCHITECT ANO ENGMEER. E. ARCHITECTORAL AND STRUCTURAL DRAWINGS Sl1PERSE�E HVAC DRAWMGS. �EiERMWE THAT WORN OF THIS DIVISION CAN BE ACCO�AMO�ATED WOHIN SPACES PROVI�ED. NOTIFY ARCHITECT OF ANY INTERFERENCE BEFORE STARTING INSTALUTION. F. �EfERMME SIZES, LOCATIONS FOR CHASES AND OPENINGS NECESSARY FOR INSTALUTION OF HVAC WORN, COOPERATE WITH OTHER TRADES IN PROVIDING SLEEVES, INSERTS AND HANGERS. G COORDINATE THIS WORK WITH ALL TRADES. ARRANGE OPERATIONS SO AS NOT TO �ELAY COMPLEfION OF WSTALLATION OF ANY PARTS OF INTERRELATE� WORK SO THAT CONSTRUCTION IAAY PROCEEO ON SCHEDULE. H. COOPERATE WITH ALL TRA�ES IN PREPARING IMERFERENCE �RAWINGS FOR AREAS WHERE THERE IS POSSIBLE CONFLICT BEIWEEN TRA�ES EXACT LOCATION OF PIPES, DUCTS AN� EOUIPMENT SHALL BE BASE� ON RELD MEASUREMENT WITH FINAL ARRANGEMENT �EfERMWED BY INTRA-TRADE AGREEIAENTS SUBJECT TO ARCHRECT'S APPROVAL. I. ARCHRECT RESERVES THE RIGHT TO MAKE REASONABLE CHANGES IN INDICATED LOCATIONS WRHOUT EATRA COST TO THE OWNER. J. ALL WORK SHALL BE INSTALLED IN NEAT AND WORKA�ANLIKE MANNER BY FIRST-CLA55 MECHANICS. THE CONiRACTOR SHALL PROVIDE ADEQUATE AND COMPETENi $UPERVISION OF THE JOB AS REQUIRED. K. DUCPNORK, PIPING AND EQUIPMENT SHALL BE ARRANGED SUBSTANTIALLY AS INDICATED. ANY CHANGE RESULTING IN A SAVINGS IN IABOR OR MAiERIAL SHALL BE MADE ONLY IN ACCORDANCE WITH A CONTRACT CHANGE ORDER. DEVIAilONS SHALL BE MADE ONLY WHERE NECESSARY TO AVOID IMERFERENCES AND ONLY ARER DRAWINGS SHOWING THE PROPOSED DEVIAilONS HAVE BEEN SUBMITTED TO AND APPROVED BY THE ARCHRECT. L COORDINATE ALL SHUTDOWNS OF ANY HVAC SYSTEM IN ADVANCE WITH THE OWNER. 10. AS-BUILT DRAWINGS A. AS WORK PROGRESSES, RECORD ON A SET OF 'A$-BUILT' PRINiS ANY DEVIAilONS FROM DESIGN DRAWINGS. DELIVER iH15 SET TO THE OWNER BEFORE SUBMITTING REQUEST FOR FINAL PAYMENi. THE 'AS-BUILT' PRINTS SHALL BE AN ACWRATE DEPICTION OF iHE PROJECT AS COMPLEiED. 11. INSUlATION A PROVIDE ALL INSUUTION MATERIALS QNSUUTION, JACKEfS, FITfING COVERS, ADHESIVES, CEMENTS, MASTICS, SEALERS AND FINISHES) WITH A FUME-SPREA� IN�EX OF 25 OR LESS AN� SMOKE DEVELOPE� IN�EX OF 50 OR LESS. AS TESTED UNDER PROCEDURE ASTM E-84 (NFPA 255) B. ALL MSULATION SHALL BE INSTALLED OVER 0.EAN DRY SURFACES. INSUNTION IAUST BE DRY AND W GOOD CONDRION. WET OR DAMAGED INSUNTION IS NOT ACCEPTABLE. NO INSULATION SHALL BE APPLIED PRIOR i0 PRESSURE TEST COA�PLETION OF THE RESPECTNE SYSTEM. C. ALL INSUlAT10N SHALL BE CONTINUOUS QNCLUDING VAPOR BARRIER) THROUGH WALL AND CEILING OPENINGS AND SLEEVES. OVERIAP Ai SEAMS PER MANUFACTURER�S RECOMMEN�ATIONS. �. ALL INSULATION PRODUCTS SHALL BE APPLIED IN ACCOR�ANCE WITH MANl1FACTURER'S WRITfEN RECOMMEN�ATION. THE WORKMANSHIP SHALL BE FIRST CUSS AN� ALL JOIMS SHALL BE MADE TIGHT. E. INSULATE ALL CONCEALEO SUPPLY AIR DUC1VlORK WITH T' THICK OWENS-CORNING FlBERGIASS �UCT WRAP WITH FOIL FACED ALL-SERVICE JACKEf. F. REPAIR EXISTING INSUlATION WHERE REMOVED FOR NEW CONNECTIONS OR INSUlATION DAMAGE� �URING CONSTRUCTION. INSULATION SHALL BE THE SAIAE AS SPECIREO FOR NEW SERVICE. G ALL INSUlA710N USE� AS PLENUM WRAP CWERING FOR COMBUSTIBLE MATERIALS IN A PLENUM SPACE SHALL BE 3M PLENUM PROTECTION SYSTEIA (PP-100-P), ONE IAYER OF 3M FlRE BARRIER DUCT WRAP 5A, IN ACCORDANCE WITH UL910 & UL1887. H. PROVIDE IMERNAL ACOUSTIC LINING AS FOLLOWS: (1) INTERNALLY LME THE FIRST TEN FEEf OF �UCIWORK DOWNSTREAM OF AIR HANDLING UNITS, VAV TERMINALS, AND ELSEWHERE INDICATED ON PLANS. (2) OMIT LINING IN iHE FIRST Y-0" �OWNSTREAM OF AN ELECTRIC HEA7ING COIL AND PROVI�E EX�ERNAL INSULATION IN RACE. (3) FIBROUS G1A55, COMPLYING WITH THERMAL INSULATION MANUFACTURERS ASSOCIAiION (TIMA) AHC-101. (4) ASTM C 1071, iYPE II, WITH COATEO SURFACE E%POSED TO AIRSTREAM TO PREVENT EROSION OF GIASS FIBERS 1"THICN. 1-1/2 LB. DENSIiY. COATING MATERWL SHALL BE ANTI-MICROBIAL AN� COMPLY WITH NFPA 90A AND 90B. (5) K-FACTOR EWAL TO 028 OR BETTER, AT MEAN TEMPERATURE OF 75 DEG. F. (6) FLAME SPREAD INDEX SHALL BE 25 OR LESS AND SMOKE DEVELOPED INDE% SHALL BE 50 OR LESS, AS TESTED IN ACCORDANCE WITH ASTM C 411. (7) �UCT LINING A�HESIVE SHALL COMPLY WITH ASTM C 916 SPECIFICATIONS FOR ADHE9VES FOR "DUCT THERIAAL INSUUTION". DUCT LINING FASTENERS ALL COMPLY WITH SMACNA �UCT CONSTRUCTION STANOARDS, ARTIQE 52.11 (8) ALiERNATE DUCT LINING MATERIAL - ARMACELL AP ARMAFLE% SA BLACK DUCT LINER, 3�4` THICK, MICROBAN ANTI-MICROBIAL PROTECTION. 12 MEfAL �UCPNORK A. HVAC WNTRACTOR SHALL VERIFY ALL EXISTING CON�ITIONS PRIOR TO FABRICATION OF �UC7WORN. ANY CONFIJCTS OR M7ERFERENCES SHALL BE BROUGHT TO THE ATfENTION OF THE ENGINEER. B. GALVANIZE� DUCiWORK SHALL BE FABRICATED OF N0.1 PRIME GALVANIZE� SHEEf MEfAL OF LOCK FORIAING QUALItt. C. SEAIJNG MATERIALS SHALL BE SUITABLE FOR; USE WITH AIR OISTRIBU710N �UCPNORK. ACCEPTABLE MANUFACTURERS ARE MONOCO INDUSTRIES, 3M, OR UNITE� SHEEf MEfAL. �. PROVI�E ALL �UC7WORK AS IN�ICATE� ON THE �RAWINGS, MAKING ALL NECESSARY OFFSETS (WHHHER OR NOT SPECIFlCALLY INDICTED) AS REQUIRED TO MEEi THE VARIOUS BUILDMG CONDITIONS. DUCTWORK INSTALUTION SHALL NOT CONFLICi WRH EQUIPMENT OR PIPING. E E%POSED DUCiWORK $HALL NEATLY INSTALLED, PRIIAED, AND PAINTED. ExPOSED ROUND DUCTWORK SHALL BE SPIRAL COORDINATE WITH ARCHRECTURAL PUJJ$ FOR COLOR $ELECTION. E ALL DUCT DIIAENSIONS LISTED ON PLANS ARE ENTERIOR AND INCLUDE ANY ALLOWANCE FOR INTERNAL ACOUSTIC LINING. G ALL CHANGES IN CRO55 SECTION SHALL BE MADE WIiHOUT REDUCMG THE DESIGN AREA OF THE DUCT OR RAISING THE PRESSURE OROP PER 100 FEET OF DUCT SHOWN ON DOCUMENTS. H. NO PIPE OR OTHER OBSTRUCTION$ SHALL PA55 THROUGH NR DUCTS, UNLE55 SPECIFlCALLY SHOWN ON PlANS. I. CAP ALL OPEN ENDS TO DUCPNORN DURMG WNSTRUCiION TO PREVENi ENTRANCE OF DUST, DEBRIS, MOISTURE ETC. J. INSTALL DUCiWORK RUN ABOVE CEILING AS HIGH AS POSSIBLE 50 AS TO MAINTAIN DESIGN CEILMG HEIGHiS. EXPOSED DUCTWORK SHALL BE INSTALLED TO PROVIDE IAAXIIAUA� HEADROOM OR AT HEIGHT SPECIFlED ON PLANS. K. DUCPNORN $HALL NOT BE HUNG FROM EOUIPMENT, PIPMG, CONDUIi, ROOF DECKING OR OTHER DUCPNORK. L. ALL DUCiWORK JOINTS AND SEAMS SHALL BE AIR-TIGHT PER SIAACNA TABLE 1.1. POORLY MADE JOINiS, SPLITS, VISIBLE HOLES AT CORNERS, EiC SHALL BE REWORNED AND REPAIRED. WHERE EXCESSNE PULSATING OF DUCTWORK IS FOUND, ADDITIONAL STIFFENERS SHALL BE ADDED. ANY CRACKMG IN THE SEALANT THAT I$ APPARENT UPON MSPECTION SHALL BE SUFFlCIENT TO WARRANT REJECiION. M.IF THE INTERIOR OF SHEET IAETAL IS EXPOSED i0 VIEW THROUGH NR DISiRIBUTION DEVICES M FlNISHED AREAS OF THE BUILDING, R SHALL BE COATEO WITH PRIMER AND A FIAi BNCK FlNISH COAT. N. ALL DUCTWORK SHALL BE SUPPORTED PER $MACNA REOUIREMENTS. 0. RECTANGUUR OUCiWORK FlTiINGS. (1) BRANCH CONNECTIONS SHALL BE 45 DEGREES ENTRY. STRAIGHT iAPS ARE NOT PERMITTED. (2) CHANGES IN DIRECTION SHALL BE MA�E WITH FULL RADIUS ELBOWS WITH RA�IUS EQl1AL TO 1-1/2 TIIAES THE HORIZONTAL WIDTH OF THE Dl1CT OR WITH SQUARE ELBOWS WITH TURNING VANES. TURNING VANES SHALL BE �OUBLE THICKNESS IYPE WNSTRUCTE� OF THE SAME MATERIAL AS THE SURROUN�MG �UCIWORK, PER SMACNA REQl11REMENTS. P. ROUND �UCPNORK FlTfMGS: (1) BRANCH CONNECTIONS SHALL BE IAADE WITH 45 DEGREE ENTRY TEES. (2) CHANGE IN DIRECTION SHALL BE MADE WITH FULL RADNS ELBOWS WITH RA�WS EOUAL TO 1-1/2 TIMES THE �IAMEfER OF THE �UCT. Q. LOW PRESSURE DUCiWORK SHALL BE CONSTRUCTE� PER SMACNA "HVAC �UCT CONSTRUCTION STANDAR�S"FOR 2 INCH STATIC PRESSURE, SEAL QASS B R. HANGERS ANO SUPPORTS (1) PROVIDE GALVANRED STEEL STRAPS, ALL-THREAD ROD AND HORIZONiAL ANGLE SUPPORTS SIZED PER SIAACNA RE�UIREIAENTS. (2) DUCT ATTACHMEMS SHALL BE MADE USING SHEET METAL SCREWS COMPATIBLE WITH DUCi MATERIALS. (J) BUIL�ING ATfACHMENTS SHALL BE WNCREfE INSERTS OR STRUCTURAL STEEL FASTENERS APPROPRIATE FOR THE BUILDING MATERIALS. �0 NOT USE POWER ACTIVATE CONCREfE FASTENERS. "C ttPE MALLEABLE IRON BFAM CIAMPS ARE ACCEPTABLE ONLY IF USE� WITH CARBON STEEL REfAINER STRAP. FLEXIBLE �UCiWORK A. TESTE� AND CLASSIFIE� BY UNDERWRITERS IABORATORIES, ING AS CIASS I AIR �UCT AN� LABELED IN ACCORDANCE WITH LLL 181, STAN�AR� FOR AIR DUCTS". THE FIAME SPRFA� RATING SHALL BE 25 OR LESS AN� THE SMOKE �EVELOPEO RATING SHALL BE 50 OR LESS. B. LINER SHALL BE CONSTRUCTED OF AWMINUM FOIL, FIBERGIASS AN� AWMINIZE� POLYESTER, MECHANICALLY LOCKEO WITHOUT ADHESIVES, HELIX SHALL BE GALVANIZED STEEL, FORME� AN� MECHANICALLY LOCKED TO FABRIC. C. WHERE DUC7WORK IS TO BE INSUTATE�, FLEXIBLE �UC7WORK LINER SHALL BE COVERE� BY A FACTORY WRAPPE�, 1-1/Z'THICK, 3/4 POUN� DENSIN FIBERGIASS INSl1lATI0N BLANKEf WITH A RRE REfAR�ANT REMFORCE� AWMINUM OUTER JACNEf. �.INSTALL REXIBLE DUC7WORK FULLY E%TENDE�, FREE OF SAGS AND KINKS. IAAkIIAUTA LENGTH OF FLENIBLE DUCiWORK SHALL BE 3'-0'. FASTEN FLERIBLE DUCPNORK TO RIGID DUCTWORK AND DEVICES WITH SELF-LOCKING 100 PERCENT NYLON, ADJUSTABLE DIAMETER ClAMPS. BAIANCING DAMPERS A. PROVIDE BALANCING DAMPERS FOR ALL AIR TERMINAL DEVICES (SUCH AS BUT NOT LIMIiE� T0, �IFFUSERS, REGISTERS, GRILLES, EfC.) AND BRANCH �UCPNORK REQUIRE� FOR PROPER BAIANCING OF SYS7EM. B. ROUN� DAMPERS SHALL BE SINGLE BIADE NPE CONSTRUCTION, MINIMUM 18 GAUGE GALVAN2E� STEEL PIVOT ROD SHAFf SHALL BE WMINUOUS. C. RECTANGUUR DAIAPERS SHALL BE SMGLE BIADE OR IAULTIPLE (OPPOSED BUDE) ttPE CONSiRUCT10N. MA%IMUM BIADE WIDiH 6 8 INCHES. D. ALL BAUNqNG DAMPERS SHALL BE CONSTRUCTED IN ACWRDANCE WITH SMACNA "HVAC DUCT CONSiRUCT10N STANDARDS' E. FURNISH ALL BALANCING DAIAPERS WITH YOUNG REGULAiOR COMPANY VALCALOX REGUTATORS WIiH HANDLE PERMANENiLY ATfACHED. DAMPER HANDLE POSIiION SHALL BE SEWRELY LOCKED IN PIACE BY TIGHTENING OF A LOCK NUi. WHERE DUCiWORK IS EXiERNALLY INSULATED, REGUUTOR BASE HEIGHi SHALL ACCOMMODATE INSULATION iHICKNE55. F. PROVIDE ALL MANUAL BALANpNG DAIAPERS WHERE INDICATED ON THE DRAWINGS AND WHERE NECESSARY TO PROPERLY DISiRIBUTE AND BAIANCE THE AIR. 13. 14. 15. REGISTERS, GRILLES AN� OIFFUSERS A. PROVI�E REGISTERS, GRILLS AN� DIFNSERS WHERE SHOWN ON THE �RAWINGS, OF SIZE ttPE, AN� MATERIAL AS INDICATED AN� AS REQUIRE� FOR A COMPLEIE INSTALLATION. B. BOROER NPES SHALL BE COMPATIBLE WRH THE CEILINGS WHERE THE GRILLES AND �IFFUSERS ARE TO BE INSTALLEO. C. ALL GRILLES AN� �IFNSERS SHALL BE FINISHED WRH A FACTORY APPLIE� OFF-WHITE FINISH UNLESS NOTE� OTHERWISE. �. REFER TO ARCHRECTURAL REFLECTEO CEILING PLANS FOR EXACT LOCA710N OF GRILLES AND DIFFUSERS. TESTING, A�JUSTING AND BALANCING A. THIS COMRACTOR SHALL SECURE SERVICES OF AN IN�EPEN�ENT AABC OR NEEB CERTIFlED TAB WMPANY. TAB COMPANY SHALL BAIANCE ALL COMPONENTS TO NO MORE THAN 5% ABOVE AND 5% BELOW OESIGN REQUIREMENTS. BAIANCE� POSRIONS ON �AMPERS, VALVES, EfC. SHALL BE PERIAANEMLY MARKE�. B. THE FOLLOWING DEVICES ANO EOUIPMENT SHALL BE MEASUREO AN� DOCUMEMED IN THE BALANCE REPORT: AIR DISTRIBUTION (GRILLES, DIFFUSERS, REGISTERS). PROJECT C0IAPLETION A. UPON C0IAPLEf10N OF PROJECT THIS CONTRACTOR SHALL PROVIDE NEW FILTERS WITHIN ALL EXISTING AND FAN POWERED EOUIPMENT. B. ALL E%ISTING AND NEW FAN POWERED EQUIPMENT SHALL HAVE iHEIR E%TERIOR CLEANED WITH A 1AILD SOAP AND WATER SOLUTION AND THOROUGHLY DRIED. C. PROVIDE 3 COPIES OF FINAL TEST AND BAIANCE REPORT i0 OWNER/ARCHIIECT. 16. 17. ���,���-h,�.,��-�� 1�Fnnineerinp Consvltants,lnc. 9700 ROCNSIDE RD. SURE 290 CLEVELAND.OX 44125 PHONE:21G90L6711 FA%:236-901-6712 NELSOI� Nelm Architecture, Inc. a licensed affiliate 30 West Monroe Street - Suite 200 Chicago, IL 6060&2409 Phone: (312)263-6605 (312)2]fi-4340 OWNER'S PROJECT MANAGER Jones Lang LaSalle Leslie Soto 540 W. Madison St, Suit eIL9-540-04-55 Chicagq [L 60661 T:312.909.2139 E:lesliesoto@am.jlLmm MEPENGINEER Integrated Engineering ConsWtants, Inc (IEC) Tim Vlning 9700 Rockside Road, Suite 290 Cleveland, OH 44125 T. 216.901.6711 E: [im.vining@ieC-inc.cc GENERALCONTRACTOR Mid America Contracting, Inc. Tyler Crawford 107 N. Main Street, Suite 3A Columbia, IL 62236 T: 618.589.2770 E: tic@midamericacontracting.com ARCHITECT OF RECORD Nelm Architecture, Inc. Vincent Paul Duet IN. LIC N0: AR11500046 Exp:12/31/2021 T. 215.825.6620 E: vduet@nelsonww.com ConsWtant'. M ERRI LL � A BANK OF AM ERICA COMPANY ❑ient. INW-044 BofA Indianapolis MLWM Pantry Refresh, Sth Floor 510 96th Street Indianapolis, IN 46240 Projcct TiHc & Address: MECHANICALHVAC SPECIFICATION SheetTiHe�. `:O��U, �V�STFh�FPy9; ;V;P O.O _� � PE1�8005]5 i�l - • sTnrE oF ;'�= '"-p� �'. �NDIPN?,�' 20� � "''.�'sroNn� ea �. � �,-•��, ;,,��c � Seal: Proj. No'. 19.00OSU].000 Designer'. ERO;MBM �rawn By: ]PH Reviewed By: HHH Pmject Manager'. M]L qppmved By: HHH M2-1 na mwems�orvs nmo mmo�r�oms wusr oe cHecKeo nrvo vea�F�eo ON 9TE BY THE CONTRAQOP AND 50B-CONTRAQORS PRIOR TO PEFFOkMMG THE WOFK. THE PRO]ECT MHNAGEk SHALL RE NOTIFIED IN wei rme oi nrvr oisexevnrvaes vxioe io vwoeeeoirve wi in ine wovx. � rve�sory won�owroe, uczozo nu a�sHTs aeseaveo DATE: 03�27�20