Loading...
HomeMy WebLinkAboutP2.1 Plumbing SpecsPLUMBING SPECIFICATIONS 1. GENERAL PROVISIONS A. THE PROVISIONS OF THE INSTRUCTIONS TO BIDDERS, GENERAL CONDITIONS, SUPPLEMENTARY WNDITIONS, ALTERNATES, A��EN�A'S', AN� �IVISION 1 ARE A PART OF THIS SPECIFICATION. CONTRACTORS AND SUBWNTRACTORS SHALL EXAMINE SAME AS WELL AS OTHER DIVISIONS OF THE SPECIFICATIONS WHICH AFFECT WORK UNDER 7HIS DIVISION. B. THIS CONTRACTOR SHALL PROVIDE ALL IABOR, EQUIPMENT, SUPPLIES, SERVICES, AN� SHALL PERFORM ALL WORK COMPLEfE AN� IN STRICT ACCOR�ANCE WITH THIS SPECIFICATION AND APPLICABLE �RAWINGS. AM' OEVIATIONS SHALL BE CLEARLY DEFINE� AN� ITEMIZE� IN ACCORDANCE WITH SECTION 1�.F OF THIS SPEGFICATION. C. THIS CONTRACTOR IS INSTRUCTEO TO RFAO CAREFULLY THE SPECIFICATIONS FOR ALL PARTS OF THE WORK, WHICH INCWOE THE ARCHITECTURAL, ELECTRICAL, MECHANICAL, PWMBING, FIRE PROTECTION, CIVIL, STRUCTURAL AN� ALL OTHER DRAWINGS AS WELL AS THE SPEQFICATIONS FOR ALL THE OIVISIONS THAT ARE PART OF 7HE CONTRACT �OCUMEN7S. 0. ALL ITEMS OF LABOR, MATERIAL AN� EOUIPMENT NOT SPEQFICALLY MENTIONE� HEREIN OR SHOWN ON PUNS, BUT INCIOENTAL T0, OR REQUIREO FOR THE COMPLEfE WSTALlATION AND PROPER OPERATION OF THE WORK, SHALL BE FURNISHED AS IF CALLE� FOR IN DEfAIL BY THE SPECIFICATIONS OR ORAWINGS. E AS OSE� IN THIS SPEQFlCATION. "PROVI�E" MEANS "FURNISH AN� INSTALC. "FURNISH" MEANS 'TO PURCHASE AND DELIVER i0 THE PROJECT SITE COMPLEfE WITH EVERY NECESSARY APPURTENANCE AND SUPPORT," AND "INSTALC' MEANS '70 UNLOA� AT THE �ELNERY POINT AT THE SITE AN� PERFORM EVERY OPERATION NECESSARY FOR PROPER INSTALlATION PER CODES ANO IAANUFACTURERS REQUIREMENTS, TO ESTABLISH SECURE MOUN7ING AN� CORRECT OPERATION AT THE PROPER LOCATION IN THE PROJECT. 2 PERMITS, CO�ES, INSPECTIONS, AN� TESTS A. THE PWMBING COMRACTOR SHALL SECURE AND PAY FOR ALL PERMITS AN� INSPECTIONS REQUIRED FOR THE PROSECUTION OF PWMBING WORN. ALL PERMITS AN� CERTIFICATES OF INSPECTION AN� APPROVAL SIGNE� BY THE COMROLLING BUILDING DEPARTMENT SHALL BECOIAE PROPERiY OF THE OWNER. 8. ORAWINGS INOICATE THE MINIMUM �ESIGN REQl11REMENTS. NATIONAL, STATE, AN� LOCAL CO�ES SHALL BE FOLLOWED. COMPLY WITH THE LATEST E�ITIONS OF iHE LOCAL GOVERNING PWMBING CO�E, LOCAL GOVERNING MECHANICAL WDE, AN� NFPA STANDAR�S. THE CONTRACTOR SHALL INCWDE iHE WST OF SATISFYING SUCH CO�ES ANO STANOARDS IN HIS BIO.FOLLOWING COMPLElION OF THE PWMBING WORN, FURNISH TO 7HE OWNER, IN �UPLICATE, CERTIRCATES OF INSPECiION AN� APPROVAL BY REGULATORY AGENQES HANNG JURIS�ICTION. (1) DEMONSTRATE TO THE OWNER'S SATISFACTION THE PROPER OPERATION OF EACH OF iHE SYSTEA�S COMPRISING iH15 CONTRACT BEFORE FlNAL PAYMENT. (2)IMMEDIATELY CORRECT ANY WORK FOUND AT VARIANCE WITH THESE SPECIFICATIONS, THE NATIONAL, STATE, AND LOCAL CODES, AND REOUIREMENTS OF GOVERNING REGULATORY AGENCIES. (3) TEST PIPING FOR LEAKS; REPAIR LEAKS IN COPPER TUBING BY SWEA7ING OUT JOINTS, THOROUGHLY CLEANING BOTH TUBE AN� FITfING, AN� RE-SOLDERING OR RE-BRAZING CORRECT LEAKS IN SCREWE� JOINTS BY REPIACING THREA� OR FITfING OR BOTH. a. �OMESTIC WATER SHALL BE TESTE� WITH WATER AT A PRESSURE OF 125 PSI FOR 6 HOURS. b. NATURAL GAS SHALL BE TESTE� WITH COMPRESSE� AIR AT A PRESSURE OF 1-1/2 TIMES THE PROPOSED MAXIMUM WORKING PRESSURE (BUT NOT LE55 THAN 3 PSQ FOR 24 HOURS. TESTING PROCEDURE SHALL CONFORM TO NFPA 54 °NATIONAL FUEL GAS CODE" AND ICC FUEL GAS CODE REQUIREMEN7S. c. SANITARY DRAIN AND VENT AND STORM PIPING SHALL BE TESTED WITH WATER PER GOVERNING PLUMBING CODE AND THE LOCAL AUTHORIiY. 3. VISIT TO THE SITE A. THE CONTRACTOR SHALL VISIT THE SITE OF THE WORK AND BECOME FAMILIAR WITH ALL CONDITIONS AFFECTING THE WORK. THE SUBMISSION OF A PROPOSAL SHALL PRESUPPOSE KNOWLE�GE OF ALL SUCH WNDITIONS AND NO ADDITIONAL COMPENSATION SHALL BE ALLOWED WHERE EXTRA IABOR OR MATERIALS ARE REQUIRE� BECAUSE OF IGNORANCE OF THESE WNDITIONS. 4. PROTECTION A. THE PWMBING WNTRACTOR SHALL PROVI�E ALL NECESSARY PROTECTION FROM �IRT AND WATER �URING CONSTRUCTION NECESSITATE� 8Y PWMBING WORK. PROTECTION MEfHODS ARE SU&IECT TO APPROVAL BY THE ARCHITECT. 5. EQUIPMENT ANO MATERIALS A. ALL EQUIPMENT AN� MATERIALS SHALL BE NEYV AN� SHALL CONFORM TO UNDERWRITERS' LABORATORIES STAN�ARDS, WHERE APPLICABLE. WHERE SPECIFlCATIONS �ESCRIBE, OR PUNS SHOW, MAiERIALS OR EQUIPMENT OF HIGHER QUALIN THAN REQOIRE� 8Y CO�E AN� LOCAL RULING, THE DRAWINGS AN� SPECIRCATIONS SHALL GOVERN THE �UALfIY OF THE MATERIAL OR EQUIPMENT. 8. THE WMRACTOR SHALL SUBIAR PROOF, IF REQUES7E� BY THE OWNER THAT THE MATERIALS, APPLIANCES, EOUIPMENT OR �EVICES NRNISHED AN� MSTALLE� UN�ER THIS WNTRACT, MEEf THE REOUIREMEMS OF THE UNDERWRITERS' UBORATORIES, INC.. AS REGARDS FlRE AND CASUALTY HAZARDS. THE IABEL OF OR LISTING BY THE UNDERWRITERS' LABORATORIES, ING WILL BE ACCEPTED AS CONFORMING WITH THIS REQUIREMENT. IN LIEU OF THE LABEL OR LISTING, THE CONTRACTOR MAY SUBMIT INDEPENDENT PROOF SATISFACTORY TO THE ARCHITECT THAT THE MATERIALS, APPLIANCES OR DEVICES CONFORM TO THE PUBLISHED STANDARDS, INCLUDING MEfHODS OF TEST OF THE UN�ERWRITERS' IABORATORIES, INC. UNDERWRITERS' 1A80RATORIES, INC. AN� ITS PUBLICA710NS WILL BE REFERRED TO HEREINAFTER BY THE ABBREVIATION UL, WITH OR WITHOUT ADOITIONAL I�ENTIFYING SYMBOLS. 6. GUARANTEE A. THE PWMBING CONTRACTOR SHALL GUARANTEE FOR A PERIO� OF ONE YEAR THAT ALL WORK AN� EQUIPMENT WILL REMAW FREE FROM ALL DEFECTS IN WORKMANSHIP AN� MATERIALS, AN� THAT IT WILL COMPLY WITH ALL THE SPECIFIC REQUIREMEMS OF THE SPECIFICATIONS AN� OTHER WNTRACT OOCUMENTS GOVERNING THE WORK. 8. ALL WORK FOUND BY THE ENGINEER TO BE �EFECTIVE WILL BE REPLACE� WITH NEW WORK MEEIING ALL 7HE REQUIREMEMS OF THE WNTRACT. THE PWMBING WNTRACTOR WILL BEAR ALL COSTS OF SUPPLYING SUCH NEW WORK, AND INSTALLING AND FINISHING SAME, AN� WILL ASSUME ALL COSTS FOR REPLAQNG OTHER WORK OAMAGED BY THE REMOVAL AN� REPIACEMENT OF ANY OF THE WORK. THE PWMBING CONiRACTOR WILL BEAR ALL COSTS FOR FREIGHT, �RAYAGE AND OEMURRAGE, ANO ALL LABOR IN WNNEC710N THEREWITH. RELEA5E0 FOR CONSTRIICTI�N Su6jec��o compliance with allregula�ions of S�a�e antl Local Codes City of Carmel r �un��\i lo•rvalM��_ DATE: 03�27�20 7. WTfING, PAiCHING, FIRESiOPPING AND PAINTING A. THIS CONTRACTOR SHALL BE RESPONSIBLE FOR CUTTING ALL HOLES REQUIRED FOR INSiALLAT10N OF PLUMBING WORK. HOLES SHALL BE CUT IN A NEAi MANNER SATISFACTORY TO THE ARCHITECi. B. CONTRACTOR SHALL EMPLOY AN BUILDING OWNER APPROVED ROOFING CONTRACiOR FOR ALL ROOF PENEiRAilONS. ROOF SHALL BE REPAIRED SO AS NOT i0 VOID ROOF WARRANtt. C. UNLE55 NOTED OTHERWISE, ALL HOLES OR DAMAGE CAUSED BY THE REMOVAL OF E%ISTING WORK OR THE INSTALLATION OF NEW WORK SHALL BE PROPERLY PATCHED BY iH15 CONTRACTOR. HOLES SHALL BE NEAiLY PATCHED AND PAINTED WITH SUITABLE MATERIAL TO MATCH E%IAING SURFACES. HOLES THROUGH FLOORS OR FIRE WALLS SHALL BE SEALED WITH THE APPROPRIATE INTUMESCENT CAULK, PUTiY, STRIP OR SHEET ttPE FIRE BARRIER PRODUCT. D. FIRESTOP SYS�EM (REQUIRE� FIRESTOPPING MATERIALS) SHALL BE DEIERMINE� BY THE WALL OR FLOOR/CEILING ASSEMBd AND PENEfRATION NPE AN� SHALL BE 11L LIS7E� AND TESTED IN ACCORDANCE WITH ASTIA E814. FIRE RATING Of THE FIRESTOP SYSTEM SHALL BE EOUIVALEM TO THE ASSEIABLY WHICH IS PENEfRATED. E. ACCEPTABLE FIRE BARRIER PRODUCTS, HILTI "FS-ONE", NELSON 'FlAMESEAL" OR APPROVED EQUAL AS MANUFACTURED BY 3M. & E%CAVAiING, TRENCHING, AND BACKFlLLING: A FURN6H MATERIALS, i00L5, LABOR AND SUPERV190N NECESSARY TO PROVIDE ALL E%CAVATING, TRENCHING AND BACKFlLLING REOUIRED FOR THE PROPER INSiALLAT10N OF EQUIPMENT AND PIPING. & E%ACT ROUiING OF TRENCHING SHALL BE DETERMME� BY THE CONTRACTOR AND APPROVED, IN A�VANCE, BY THE OWNER. C. ALL WORK SHALL COMPLY WITH THE REQUIREMENTS OF THE GOVERNING AUiHORITIES. D. WHERE TRENCHES ARE E%CAVATED SUCH THAi iHE BOTfOM OF THE TRENCH FORMS THE BED FOR THE PIPE, SOLID AND CONTINUOUS LOAD-BEARING SUPPORT SHALL BE PROVIDED BEiWEEN JOINTS. BELL HOLES, HUB HOLES AND COUPLED HOLES SHALL BE PROVIDED AT POINiS WHERE THE PIPE IS JOWED. SUCH PIPE SHALL NOT BE SUPPORTED ON BLOCKS TO GRADE. 9. CLEANING AND PAINTING A. CLEAN NEW PIPING ARER WORK I$ COMPLEiE TO REMOVE PIPE DOPE, LOOSE MILL SCALE AND OTHER E%TRANEOUS MATERIALS. B. TOUCH UP AND REPAIR ANY DAIAAGED FACTORY FlNISHES ON EOUIPMENT AND MATERIALS FURNISHED. OTHER PAINTING WILL BE DONE UNDER THE PAINTMG DIVISION OF THE SPEQFlCATIONS. 10.COORDINATION AND CONDUCT OF WORK A. PLUMBING CONTRACTOR SHALL COORDINATE ALL NEW (GAS, DOMESTIC WATER, SANITARY) UTILIN WNNECTIONS AN� MEfERING REQUIREMENTS WITH LOCAL U�ILIiY COMPAM'. B. PWMBING �RAWINGS ARE DIAGRAMMATIC, INDICATING GENERAL ARRANGEMENT, APPROXIMATE SIZES, GENERAL LOCATIONS OF EOUIPMEM, AND PIPING. VERIFY DIMENSION$ M FlELD; ADJUSi TO IAANUFACTURER'S SHOP DRAWINGS. DO NOT SCALE DRAWINGS. C. ALL REQUESTS FOR WFORMATION SUPPLEMENTAL TO THE CONSTRUCTION DOCUMENiS SHALL BE SUBMITTED IN WRITING TO iHE ARCHRECT FOR DISTRIBUTION TO THE APPROPRIATE PARtt(5). D. DRAWINGS AND SPECIFICATIONS ARE TO BE CONSIDERED AS SUPPLEMENTING EACH OTHER. WORK SPEqFIED BUT NOT SHOWN, OR SHOWN BUT NOT SPECIFIED, SHALL BE PERFORMED OR FURNISHED AS THOUGH MENTIONED IN BOTH SPECIFICATIONS AND DRAWINGS. E. ARCHITECTURAL AND STRUCTURAL DRAWINGS SUPERSEDE PLUMBING DRAWINGS. DEfERMINE THAT WORK OF THIS DIVISION CAN BE ACCOMMODATED WITHIN SPACES PROVIDED. NOTIFY ARCHITECT OF ANY INTERFERENCES BEFORE SiARTING INSTALLATION- F. DETERMINE SRES, LOCATIONS FOR CHASES AND OPENINGS NECESSARY FOR INSTALLATION OF PLUMBING WORK. COOPERATE WITH OTHER TRADES IN SETfING SLEEVES, INSERTS AND HANGERS. G. COORDINATE THIS WORK WITH ALL TRADES. ARRANGE OPERATIONS 50 AS NOT TO DELAY INSTALUTION OR COMPLETION OF ANY PARTS OF INTERREIATED WORK 50 THAT CONSTRUCTION MAY PROCEED ON SCHEDULE. H. COOPERATE WITH ALL TRADES IN PREPARING INTERFERENCE DRAWINGS FOR ARFAS WHERE THERE IS POSSIBLE CONFLICT BEIWEEN TRADES. EXACT LOCATION OF PIPES, AND EQUIPMENT SHALL BE BASED ON FlELD MEASUREMEMS WITH FINAL ARRANGEMENT DETERMMED BY INTRA-TRADE AGREEMENTS SU&IECT TO ARCHITECT'S APPROVAL. L ARCHITECT RESERVES 7HE RIGHT TO MAKE REASONABLE CHANGES IN IN�ICAIE� LOCA710NS WRHOUT EXTRA COST TO THE OWNER. J. ALL WORK SHALL BE INSTALLE� IN A NEAT AN� WORKMANLIKE MANNER BY FIRST-CIASS MECHANICS THE WNTRACTOR SHALL PROVI�E ADEQUATE AN� COMPEfENT SUPERVISION OF THE JOB AS RWUIRED. K. PIPING AN� EQUIPMENT SHALL BE ARRANGED SUBSTAMIALLY AS INDICATE�. ANY CHANGE RESULTING IN A SAVINGS IN LABOR OR MATERIAL SHALL BE MADE ONLY IN ACCORDANCE WITH A CONTRACT CHANGE OROER. �EVIATIONS SHALL BE MADE ONLY WHERE NECESSARY TO AV01� INTERFERENCES ANO ONLY AFfER DRAWINGS SHOWING THE PROPOSE� DEVIATIONS HAVE BEEN SUBMITIE� TO AN� APPROVE� BY THE ARCHITECT. L COOR�INATE ALL SHl7�DOWNS OF THE PWMBING SYSTEM IN A�VANCE WITH THE OWNER. 11. SUBMITfALS A. PROVI�E A MINIA�UA� OF SIX (6) SUBMITfAL DRAWMGS FOR PWMBING FlXNRES, E�UIPA�ENT, AND ALL OTHER SPEQFlED COMPONENTS FOR APPROVAL BY THE ARCHITECT AND ENGMEER. B. WHERE ONLY ONE IAAKE OF EQUIPMENT IS NAMED, IT SHALL BE PROVIDE� AS SPECIFlED. C. VERBAL REQUESTS OF APPROVALS FOR ANY SUBSiITUTION WILL NOT BE BINDING ON THE ARCHITECT AN� OWNER. �. THIS CONTRACTOR ASSUAIES ALL RESPONSIBILIN FOR ALL COSTS FOR REDESIGN CHANGES NECESSARY BY ALL TRADES TO ACCOMMODATE THE USE OF EQUIPIAENi NOT SPECIFlED ON PROJECi �OCUMENTS. E. BI�S SHALL BE BASED 11PON THE SPECIFlE� PRO�UCTS OR LISTE� ALTERNATNES DRAWINGS AND SPEQFlCATIONS ARE BASED ON THE PRODUCTS SPEQFlED BY NPE, IAODEL, AND SIZE AND THOS ESTABLISH MINIIAUM �UALITIES, WHICH SUBSTITUTES Ml1ST MEH TO QUALIFY FOR REVIEW. F. SHOULD THE WNTRACTOR PROPOSE ID FURMSH MATERIALS, EQUIPMENT, AN� �EVICES, OTHER THAN THOSE SPEQFlED AN� LISTED, THE COMRACTOR SHALL SUBMIT A WRITfEN REQUEST FOR SUBSTITUTIONS, TO THE ENGWEER, AT LEASi FOURTEEN (14) CALEN�AR �AYS PRIOR TO BID OPENING. THE REOUEST SHALL BE AN ALTERNATE TO THE ORIGINAL BID AND SHALL INCWDE AN� BE ACCOMPANIED WRH WMPLEfE SPEGFICATIONS CUT SHEEf SUBMITfAL AS OUTLINED IN SECTION 11 A OF TMS SPECIFICATION SECTION, COMPLEfE WITH �ESCRIPTNE (MANl1FACTURER, BRAN� NAME, CATALOG NUTABER, EfC.) AN� TECHNICAL �ATA FOR ALL ITEMS. INDICATE ANY AD�ITIONS OR DEDUCTIONS TO THE COMRACT PRICE WITH THE SUBSTITOTION SOBMITfAL AN� ON THE BI� FORM. FAIWRE TO PERFORM THESE ACTIONS E�UATES TO ACKNOWLEDGEMENT THAT THE PRQIECT HAS BEEN BI� WITH STRICT ACCORDANCE TO THIS SPECIFlCATION AN� APPLICABLE DRAWINGS. G ACCEPTANCE OR REJECTION OF THE PROPOSE� SUBSTITOTIONS SHALL BE SUBJECT TO APPROVAL OF THE ARCHITECT AND ENGMEER. IF REQUESTED, THE CONTRACTOR SHALL SUBMIT WSPECTION SAMPLES OF BOTH THE SPECIFlE� AN� THE PROPOSE� Sl1BSTITl1TE ITEMS. H. IF ANY SUBSTITUTIONS ARE APPROVED, AN A�DENDUM LISTING THE APPRWE� ITEM(5) WILL BE ISSUED TO ALL BIDDING CONTRACTORS PRIOR TO THE BID DAiE. I. IN ALL CASES WHERE SUBSTITUTIONS ARE PERMITfED, THE CONTRACTOR SHALL BEAR ANY E%TRA COSi OF EVALUATING iHE EOUALIiY OF THE MATERIAL AND EQUIPMENT TO BE INSTALLED. J. WHERE ONLY ONE MAKE IS NAMED IN THE SPECIFlCATIONS OR ON THE DRAWINGS, IT SHALL BE PROVIDED. K. VERBAL REQUESTS OR APPROVALS SHALL NOT BE BINDING ON THE ENGMEER OR OWNER. 12 EQUIPMENT AND PIPING IDEN➢FlCATION A. LABEL ALL PIPING SYSTEMS WITH PIPE MARKERS INSiALLED ADJACENT TO VALVES, WHERE PIPES PASS THROUGH WALLS OR FLOORS, NEAR ALL BRANCHES AND CHANGES OF DIRECTION, AT 20 FEET INiERVALS ON STRAIGHi RUNS OF PIPE, AND AT ACCESS DOOR LOCAilONS. ALL PIPE MARKERS SHALL CONFORM i0 ANSI A1J.1 'SCHEME FOR THE IDENTIFlCATION OF PIPING SYSiEMS". B. THE CONTRACTOR SHALL FURNISH AND INSTALL A SYSTEM OF NAA�EPLAiES DESIGNED TO IDENTIFY EACH PIECE OF EQUIPMENT. (1) NAMEPLATE LEffER ANO NUMBERS SHALL MATCH EQUIPMENT DESIGNATION AS IN�ICATED ON THE DRAWINGS. (2) NAMEPIAiES SHALL BE LAMINATED PHENOLIC WRH BIACK SURFACE AN� WHRE CORE USE 1/i6° THICK IAATERIAL FOR PlATES UP i0 Y BY 4'. FOR IARGER SIZES USE 1/8" THICK. LEfTERS AND NUMBERS SHALL BE A MINIMUM OF 1/7' HIGH. (3) FASTEN NAMEPUTES TO ALL EQUIPMENT BY THE USE OF STAMLESS STEEL SHEEf MEfAL SCREWS. 13. AS-BUILT DRAWINGS A. AS WORK PROGRESSES, RECORD ON A$ET OF "AS-BUILT" PRINTS ANY DEVIATIONS FROM DESIGN DRAWINGS. DELIVER i0 THE OWNER BEFORE SUBMITfING REQUEST FOR FINAL PAYMENT. THE "AS-BUILT" PRINTS SHALL BE AN ACCURATE �EPICTION OF THE PRQIECT AS COMPLEfE�. 14. OPERATING AND MAINTENANCE MANUALS A. PROVIDE TO OWNER, AT PROJECT TORNOVER, THREE (3) HAROBOUND COPIES OF OPERATING ANO MAINTENANCE MANUALS FOR ALL EOUIPMENT ANO SYSTEMS INSTALLE�. MANUALS SHALL INCWOE ALL RELEVANT WFORMATION NEEOED FOR DAY-TO-DAY OPERATION AN� MANAGEIAENT OF EACH SYSTEM, AS WELL AS EQUIPMENT MAIMENANCE MFORMATION REQUIRE� TO SUPPORT THE MAINTENANCE PROGRAM. 15. OPERATING INSTRUCTIONS A. PROVIDE TO OWNER AFfER ALL EOl11PMENT IS IN OPERATION AND AT AN AGREEABLE TIME, INSTRUCTIONS FOR iHE PURPOSE OF TRAINING OWNER'S PERSONNEL IN ALL PHASES OF OPERAiION AND IANMENANCE OF EQUIPMENT AND SY4EIA5. SCHEDULE TRAINING WITH OWNER, PROVIDE Ai LEAST SEVEN DAYS PRIOR NOTICE. PROVIDE THIS TRAINING TO ALL PERSONNEL AND ON ALL SHIRS. i6.INSUlATION A. PROVIDE ALL INSUlATION MATERIALS QNSUUTION, JACKETS, FITfING COVERS, A�HESIVES, CEMEMS, MASTICS, SEALERS AND FINISHES) WITH A FIAME-SPREAD INDEX OF 25 OR LESS AND SMOKE �EVELOPEO INOEX OF 50 OR LESS, AS TESTED UNDER PROCEDURE ASTM E-84 (NFPA 255). B. ALL INSUlATION SHALL BE INSTALLED OVER CLEAN, DRY SURFACES. WSUlATION MUST BE DRY AN� IN GOOD CONDITION. WEi OR DAMAGED WSUlATION IS NOT ACCEPTABLE NO INSULATION SHALL BE APPLIEO PRIOR TO PRESSURE TEST WMPLETION OF THE RESPECTIVE PIPING SYSTEIA. C. ALL INSUUTION SHALL BE CONTINUOUS (INCLUDING VAPOR BARRIER) iHROUGH WALL AND CEILING OPENINGS, SLEEVES, AND PIPE HANGER LOCAiIONS. D. ALL INSUU+TION PROouCTS SHALL BE APPLIED IN ACCORDANCE WITH MANUFACTURER�S WRITfEN RECOMMENDATIONS. THE WORKMANSHIP SHALL BE FIRST CUSS AN� ALL JOINTS SHALL BE MADE TIGHT. E. INSUTATE VALVE BONNEfS AN� UNIONS ON �OMESTIC WATER PIPING WITH INSUlATION MATCHING PIPE INSUUTION. F. INSUTATE �OMESTIC WL� WATER PIPING AND FITfINGS WITH OWENS-CORNING ONE-PIECE FlBERGIASS PIPE INSUlATION WOH ALL SERVICE JACKEf, 1/7' THICNNESS FOR PIPING LESS THAN OR EOUAL TO 1.5", 1" THICKNESS FOR PIPES IARGER THAN 1.5". INSULATE �OMESTIC HOT WATER PIPING AN� FlTTINGS WITH THE SAME INSUU+TION, 1" THICKNE55 FOR PIPING LESS THAN OR EQUAL i0 1.5", 2" THICKNESS FOR PIPING WEGER iHAN 1.5'. G. INSUTATE HORIZONTAL STORM PIPING AND ROOF DRAIN SUMPS WITH OWENS-CORNING ONE PIECE FIBERGLA55 PIPE INSULATION WRH ALL SERVICE JACKEf, 1�2° THICKNESS. H. INSUTATE ELECTRIC WATER COOLER TRAP AND WASTE PIPING WITHIN CABINET WIiH 1/2' THICK ARMAREX AP PIPING INSULATION. L REPAIR EXISTING INSUlATION WHERE REMOVE� FOR NEW CONNECTION. INSUlATION SHALL BE THE SAME AS SPEQFIE� FOR NEW SERVICE. K. ALL INSUlATION USED AS PLENUM WRAP COVERING FOR COMBUSTIBLE MATERIALS IN A PLENUM SPACE SHALL BE 3M PLENUM PROTECTION SYSTEM (PP-1�0-P), ONE IAYER OF 31A FIRE BARRIER DOCT WRAP SA, IN ACCORDANCE WITH UL910 & UL1887. 17. MATERIALS A. PIPE AND FITfINGS (1) DOME41C wATER SHALL BE ttPE "L" COPPER. (2) �OMESTIC WATER BELOW FLOOR SHALL BE iYPE "K" SOFf COPPER. (3) STORM AN� SANITARY DRAIN AN� VENT SHALL BE SCHE�ULE 40 PVC PIASTIC PIPE (IYPE OWV). (4) STORM AND SANITARY DRAIN AND VENT PIPING LOCATED IN RETURN AIR PLENUM SHALL BE SERVICE WEIGHi NO HUB CAST IRON PIPE. ALL CASi IRON PIPE AN� FITfINGS SHALL COMPLY WITH ASTM A 888 (OR A 74) AND BE MARKED WITH THE COLLECTIVE TRADEMARK OF THE CAST IRON SOIL PIPE INSTITl1TE (CISPIJ AN� BE LISTE� BY THE NSF INTERNAiIONAL. (5) FlTTINGS FOR COPPER PIPE SHALL BE WROUGHi COPPER SOLDER JOINi ttPE. ONLY LEAD FREE SOLDER IS ACCEPTABLE. (6) FITfINGS FOR BLACK STEEL PIPE 7' AND SMALLER SHALL BE 150 PSIG SWP MALLFABLE IRON SCREWE� FITTINGS. FOR 2-1/7' AN� IARGER, FITfINGS SHALL BE FACTORY FORMED WELDING FITfINGS. (7) FITfMGS FOR STORM DRAIN, SANITARY DRAIN AN� VENT PIPING SHALL BE SCHEDULE 40 WC PIASTIC PIPE (iYPE DWV) WITH SOLVENT CEMENi PVC (DWV) FACTORY FORMED FITTINGS. (8) FITfINGS FOR STORM �RAIN, SANITARY �RAIN AND VENT PIPING LOCAIE� IN REfORN AIR PLENUM SHALL BE SERVICE WEIGHT NO HUB CAST IRON PIPE WITH STAINLESS STEEL MECHANICAL JOINT COUPLINGS. COUPLINGS SHALL COMPLY WITH "CISPI 310". THE EIASTOMERIC SEALING SLEEVE SHALL CONFORM TO "ASTM C 564" AND SHALL BE PROVI�EO WITH A CEMER STOP. MECHANICAL JOINT COUPLINGS SHALL BE INSTALLEO IN ACCORDANCE WITH THE MANUFACTURER'S MSTALUTION INSTRUCTIONS. B. �OMESTIC WATER VALVES (1) DOMESTIC WATER SHUT-0FF VALVES SHALL BE BRONZE BODY, iW0 PIECE, FULL PORT, LEVER HANDLE BALL VALVES WITH TEFLON SEATS, CHROME PIATED BRASS BALL, BRASS STEM AND SOLDER ENDS. 600 P51 WOG. ACCEPTABLE MANUFACTURERS: MILWAUKEE, HAMMOND, APOLLO, JOMAR. (2) HORIZONTAL CHECK VALVES SHALL BE BRONZE BODY, SWING IYPE �ESIGN, BRONZE �ISC, STAMLESS STEEL LEVER WITH SOLDER EN�S 200 PSI WOG. ACCEPTABLE MANUFACTURERS: MILWAUKEE, HAMMOND, APOLLO, JOMAR. (3) MANUAL BALANQNG VALVES SHALL BE BRONZE B00Y, COMBINATION VENTURI AND BALL VALVE WITH TWO PRESSURE/TEIAPERATURE TESi PORTS, MEIAORY STOP, INLET UNION CONNECiION AND THREA�ED ENDS, 400 P51 AT 250'F. ACCEPTABLE MANUFACiURERS: FLOW DESIGN MC. "FLOWSET". 18. PIPING INAALLATION A. PROVIDE MACHWE CUT STEEL PIPE SLEEVE 1" IARGER THAN OUTSI�E DIAMEfER OF PIPE WHERE FLOORS ARE CORE DRILLED, STEEL SLEEVES ARE NOT REQUIRE�. SEAL OPENINGS TO MAINTAIN THE INTEGRIiY OF THE FIRE RATING. B. PROVIDE ALL WSERTS, FASTENERS AN� SUPPORTS TO PROPERd SUPPORT AN� REfAIN PIPING; TO CONTROL EXPANSION, CONTRACTION, ANCHORAGE, DRAINAGE, AND PREVENT SWAY ANO VIBRATION. PIPING SHALL BE SO SUPPORiE� AS NOT TO PLACE A S�RAIN ON VALVES, FlXNRES OR EOUIPMENT. C. THE DRAWINCS IN�ICATE THE GENERAL LOCATION AND ARRANGEMENT OF THE PIPING SYSTEMS. SO FAR AS PRACTICAL, INSTALL PIPING AS IN�ICAIE� MAKING CONNECTIONS TO ALL EQUIPMENT AN� FIXNRES. INSTALL PIPING AS DIRECT AS POSSBLE AVOIDING UNNECESSARY OFFSEfS. HOWEVER, IF OFFSEfS ARE REQUIRE� IN OR�ER TO OBTAIN MAXIMUM HEA�ROOM OR TO AV01� CONFLICT WITH OTHER WORK, THEY SHALL BE MA�E AS REQUIRE� OR AS REOUESTED BY THE ARCHITECT WITHOUT A��ITIONAL WST TO THE OWNER. THE ARCHITECT RESERVES iHE RIGHT TO MAKE MINOR CHANGES IN THE LOCATION OF PIPING AN� EQUIPMENT DURING THE ROUGHING-IN, WITHOUT A�DITIONAL COST TO THE OWNER. ALL CHANGES PROPOSE� BY OiHERS SHALL BE APPROVEO BY iHE ARCHITECT. D. INSTALL PIPING FREE OF SAGS OR BENDS E. ALL PIPING SYSTEMS MUST BE INSTALLED SO THEY CAN BE COMPLEfELY DRAME�. PROVI�E TEE FITfING, BALL VALVE WRH HOSE THREA� FITTING AN� CAP AT ALL LOW POINTS, TRAPPED SECTIONS, BASES OF RISERS, AN� ON EQUIPMENT SIDE OF SHUT OFF VALVES TO PERMIT ORAINING. PROVI�E BALL VALVES AT ALL HIGH POINTS TO ALLOW VENTING. ALL DRAIN VALVES AN� VENTS SHALL BE ACCESSIBLE F. TERMINATE PWMBING VENT PIPES AT LEAST 12 INCHES ABOVE ROOF. G. BUIL�MG DRAINS SHALL BE PITCHED A MINIMUM SLOPE OF 1/4 INCH PER FOOT FOR PIPES UP TO 2-1/2 INCH AND 1/8 INCH PER FOOT FOR PIPES GREAIER THAN 2-1/2 INCHES. H. PROVIDE WATER HAMMER ARRESTERS WHERE OUICK-CLOSING VALVES ARE U�ILRED, AND INSTALL IN ACCORDANCE WITH THE MANUFACTURER'S SPECIFlCATIONS. J. PROVIDE CHECK VALVES WHERE BACKFLOW PROTECTION IS REQUIRE�, AND INSiALL IN ACCORDANCE WITH iHE MANUFACTURER'S SPECIFlCATIONS. PROVIDE AT FI%TURES SUCH A5, BUi NOT LIAIITED T0; DISHWASHERS, COFFEE MAKERS, ICE MACHMES, BEVERAGE D6PENSERS, REFRIGERATORS. PROVIDE WATfS 007 OR EQUIVALENT. K. PROVIDE DIELECiRIC UNIONS AT WUPLING OF DISSIMILAR 1AETALS i9. oisiNFECTioN A. CHLORINATE ALL DOMESiIC WATER SYAEMS AS FOLLOWS FIR4 FLUSH 5Y4EM WITH CLEAN POTABLE WAiER UNTIL DIR7Y WATER DOES NOT APPEAR AT OUTLEfS. THEN FlLL WITH A WATER�CHLORINE SOWTION (50PPM CHLORME) AN� ALLOW TO STAN� FOR 24 HOURS FOLLOWING STANDING TIME, RUSH THE SYSTEIA WRH CLEAN POTABLE WATER UMIL CHLORWE IS PURGE� FROM THE SYSTEM. REPEAT CHLORINATION, IF NECESSARY, UNTIL NO BACTERIOLOGICAL CONTAMINATION IS PRESENT IN THE SYSTEM. PROCE�URE SHALL WNFORM TO AWWA C651 AN� BE ACCEPTEO BY THE LOCAL HEALTH DEPARTMENT. 2�. PWMBING FlXNRES AN� EQUIPMENT A. GENERAL (i) PROVIDE FI%TURES OF NPE, STYLE AND MATERIAL AS SCHEDULE� ON THE DRAWINGS. INCLUDE ALL TRIM, CARRIERS, SEATS, ETC. AS INDICATED OR RECOMMENDED BY MANUFACiURER AS REOUIRED FOR A COMPLETE INSTALLATION. (2) PROVIDE VACUUM BREAKERS AS PART OF THE FI%TURE OR EQUIPMENT TRIM WHEREVER THERE IS A POSSIBILItt OF BACK SIPHONING. (3) PROVIDE OOUBLE CHECK VALVES FOR PWMBING FIXTURE OR SPECIAL EQUIPMENT WHERE BACKFLOW PROTECTION IS REOUIRED, AND INSTALL IN ACCORDANCE WITH THE MANUFACTORER'S SPEQFlCATIONS, USE WATfS SERIES 7 BRONZE DUAL CHECK VAWE. (4) PROVIDE FIXTURES CONSTRUCTED OF VITREOUS CHINA WITH ALL VISIBLE SURFACES GIAZED. FURNISH ENAMELE� CAST IRON FI%TURES WNSTRUCTEO WITH NON-STAINING, ACID RESISTANT, PORCEIAIN ENAMELE� COAT THOROUGHLY FUSE� ON THE SURFACES. FURNISH STAWLESS STEEL SINKS WITH SATW FINISH, UNLESS NOTE� OTHERWISE. (5) PROVIDE ALL STOPS, SUPPLIES, TRAPS AND ESCUTCHEONS NECESSARY FOR A COMPLEfE WSTALLATION. ALL COMPONENTS SHALL BE CHROME PIATED BRASS. (6) STOPS SHALL BE STRAIGHT OR ANGLE ttPE AS REOUIRED BY THE INSiALLAT10N, WIiH LOOSE KEY, IAETAL STEM AND WASHER CUP WITH SEi SCREW WASHER REiAWER. (7) SUPPLIES SHALL BE FLEXIBLE CHROME PIATED COPPER. (8) TRAPS SHALL BE 17 GAUGE CHROME PIATE� BRASS WITH CLEAN-Ol1T PWG. Fl1RNISH WITH SLIP NUTS, WALL BEN� AN� ESCl7�CHE0N. (9) PROVIDE CARRIERS AND SUPPORiS AS REQUIRED FOR PROPER FlXTURE WSTALLATION. iYPE SHALL PERIAIi FlELD ADJUSiMENi i0 FlT VARIATIONS IN CONSTRUCTION. UNLESS NOTED OTHERW6E, SUPPORT ALL WALL MOUNTED PLUMBING FINTURES ON CONCEALED CHAIR CARRIER$ WITH FOOT SUPPORT. (10) PROVIDE FAUCEf AERATORS AND OUTLEfS OF ttPES APPROVED BY THE LOCAL HEALTH DEPARTMENT AND LOCAL PLUMBING CODE, REFER TO IPC TABLE 604.4. (11) WSUTATE ALL EkPOSEO WATER SUPPLIES AN� TRAPS WHERE FIkTURES ARE INDICATE� TO COMPLY WITH THE REQUIREMENTS OF iHE AMERICANS WITH DISABIIJTIES ACT. WSUlATION KITS SHALL BE 3/16" THICK MOLDE� CLOSE� CELL VINYL CONSTRUCTION WITH PVC SATIN WHITE COVER. B. ACCEPTABLE MANUFACTORERS (1) PROVIDE RxTURES BY MANUFACTURERS AS SCHEDULED ON THE DRAWINGS, UNLE55 SPECIFlCALLY NOTED OTHERWISE. (2) CLEANOUTS, FLOOR DRAINS AND FLOOR SINKS a. J.R SMITH b, JOSAM c. ZURN (1) FIXNRE STOPS AN� TRAPS d. MCGUIRE MANUFACTURING e. ENGWEERE� BRASS WMPANY (i) THCRMosranc Mixmc vn�vEs a. WATiS b. LEONARD (1) ADA INSUlATION KITS a. MCGUIRE MANUFACTURING b. TRUEBRO �Inregrared 1�En�'meerinp Conaultants,lnc. 9700 ROCNSIDE RD. SUITE 290 CLEVELAND.OX 44125 PHONE:21G90L6711 FA%:216A01-6712 NELSOI� Nelm Architedure, Inc. a licensed affliate 30 West Monroe Street - Suite 200 Chicago, IL 6060&2409 Phone: (312)263-6605 (312)2]fi-4340 OWNER'S PROJECT MANAGER ]ones Lang LaSalle Leslie Soto 540 W. Madison St, Suit eIL9-540-04-55 Chicagq [L 60661 T:312.909.2139 E:lesliesoto@am.jlLmm MEPENGINEER Integrated Engineering ConsWtants,Inc (IEC) Tim Vlning 9700 Rockside Road, Suite 290 Cleveland, OH 44125 T. 216.901.67ll E: tim.vining@ieC-inCcc GENERALCONTRACTOR Mid America Contracting, Inc. Tyler Crawford 107 N. Main Street, Suite 3A Columbia, IL 62236 T: 618.589.2770 E: tic@midamericacontracting.com ARCHITECT OF RECORD Nelm Architecture, Inc. Vincent Paul Duet IN. LIC NO: AR11500046 Exp:12/31/2021 T. 215.825.662a E: vduet@nelsonww.com ConsWtant'. MERRILL� A BANK OF AM ERICA COMPANY Cllent. INW-044 BofA Indianapolis MLWM Pantry Refresh, Sth Floor 510 96th Street Indianapolis, IN 46240 Project TiHe & Nddress: PLUMBING SPECIFICATIONS SheetTiHe�. = PE118005]5 i�l • - sTnrE oF ; a- =Po''.�NoIAN?.' 2�N 'q FSSroNA�e��� ��.c �-•�/���,,��%/'� Seal: Proj. No'. 19.00OSU].000 Designer'. ERO;MBM �rawn By: ]PH Reviewed By: HHH Pmjcct Managcr. M]L qppmved By: HHH P2-1 ALL �IMENSIONS AN� LONDITIONS MOA BE CHECKED AND VERIRED ON SITE BY THE CONTPPQON PND SU6-CONTRAQORS PRIOF TO PEFFOkMMG THE WOFK. THE PRO]ECT MHNAGEk SHALL RE NOTIFIED IN WRITING �F ANY �ISCREPANCIES PRIOR TO PROCEE�ING WITH THE W�RK. c� rve�mry won�owroe, uc zozo nu a�sHTs aFseaveo