Loading...
HomeMy WebLinkAboutHSM 016 - Sewer�uiu � rv. �onege Avenue Suite A Permit Type __ Project WO Project Name Project Developer Lift Station _ . __ Treatment Plant Parcel Acreage EDU in Gallons ianapolis, Indiana 46280 phone 317-844-9200 fax 317-844-9203 www.trico.eco SANITARY SEWER PERMIT 999913613 Final Subdivision Heritage at Spring Mill 2017-1320 Section Number 1& 2 Heritage at Spring Mill Section 1& 2 Lot Number 16 _ ..._--- -- ._ . _ PPV II, LLC Address Number 11186 .._..---._.----�----------•--------.�_--- 02 Meridian Corridor Station Address 2 MIX Street 0.3 City 310 Zip Code ---..... County Valeside Crescent Carmel 46032 Hamilton _ - --..._._._ . .. .. .. _ ocat Sewer Charge - District Contrlbution 0.00 guilder Pulte Group Plan Review and Inspection 0.00 - � -- - Phone Number 317-575-2350 Application Fee 150.00 . __.__ _ ------ � EDU Fee 1908.00 Owner _ . _... . _ ...__. _ - -�-�-- --------._ _ _. _ -...__. _ _ -- - - -- ---._ ..�.---_ .--- ---- �- ------ ._ Interceptor Fee 0.00 phone Number . _ . _ .--- --- - Other Fees 0.00 _. _._._ _ Fees Due 2058.00 Occupant _ _ _ _ __ . _ _ Invoice Number Phone Number .. ---_ _ ____ _-_ _ __ PLEASE NOTE: Installation of building sewer shall be per the specfications of the TriCo Regional Sewer Utility (see reverse) and any conditions noted below. All installations shall be inspected by TriCo personnel during "open trench" phase and before backfilling with stone to finrelve inches above the pipe. NO footing or foundation drains, or other sources of ground or stormwater, shall be permitted to enter TriCo's sanitary sewer system. TriCo will assume no liability for drains which are below the grade level of the nearest downstream manhole nor for laterals which are extended beneath driveways or sidewalks. The petmit holder (property owner, developer or builder) will be responsible for damages to TriCo's sewer system. This includes damages to manholes, castings, manhole lids and the like; caused by construction activity on the building site which is the subject of this permit. Inspections by TriCo are MANDATORY and shall be arranged by contacting TriCo's office at 844-9200 24 hours in advance. All new construction wi11 be placed on billing two months after connection has been made or when water is connected, whichever comes first. The building has: Main ID: HSM17-HSM16 Grease Trap Slab Foundation Grease Interceptor Crawl Space Manhole IDs USMH HSM-17 HSM-16 DSMH Grit Interceptor Basement YES Lid Elevation 846.94,✓ 847,2g J , Grinder Station First Floor Elevation 850.50 f 850.50 V � Water Service Carmel Utilities Basement Etevation 840.70 J 840.70 v -� - . . _.. _ _. _ — _j� Calcula6on is based on both Manhole Lid Elevations and the eleva6on of the First Floor 3 56 j 3.21fFt. i `_. _'....._ _ ....� .__.... __...I..__J Per Ordinance 9-13-99 and the elevations provided, the substructure shall be plumbed by: Ejector Pump Only TriCo currentiy requires that an I&I inspection is pertormed and a Certificate of Compliance is issued prior to oxupancy ! � sale of a properrty. Please review attached I/I Permit. � Manholes shall remain accessible at all times. Buried manholes will be corrected by the Developer/Owner. The proper class of cleanout must be installed every 100 feet of lateral pipe measured from sewer main to structure. Th erms ot the conditional permlt, if any, are Iisted below. Plans have been submitted. All fees have been paid. No certificate of insurance required. No additional permits required. No manhole core permit required. The facility is not classified as a FOG facility. (Notes) By signing below, I attest that I am Builder / Owner Signaturee Printed Name Appraved By � Ryan Permit is valid for specifications and agree to accept responsibility for all work done under this permit �---- � Phone Number � from the date issued. Permit valid only with TriCo se,