SANITARY SEWER PERMIT 999913613
Final Subdivision Heritage at Spring Mill
2017-1320 Section Number 1& 2
Heritage at Spring Mill Section 1& 2 Lot Number 16
_ ..._--- -- ._ .
_ PPV II, LLC Address Number 11186
.._..---._.----�----------•--------.�_---
02 Meridian Corridor Station Address 2
MIX Street
0.3 City
310 Zip Code
---.....
County
Valeside Crescent
Carmel
46032
Hamilton
_ - --..._._._ . .. .. .. _
ocat Sewer Charge - District Contrlbution 0.00 guilder Pulte Group
Plan Review and Inspection 0.00 -
� -- - Phone Number 317-575-2350
Application Fee 150.00
.
__.__ _ ------ �
EDU Fee 1908.00 Owner
_ . _... . _ ...__. _ - -�-�-- --------._ _ _. _ -...__. _ _ -- - - -- ---._ ..�.---_ .--- ---- �- ------ ._
Interceptor Fee 0.00 phone Number
. _ . _ .--- --- -
Other Fees 0.00 _. _._._ _
Fees Due 2058.00 Occupant
_ _ _ _ __ . _ _
Invoice Number Phone Number
.. ---_ _ ____ _-_ _ __
PLEASE NOTE: Installation of building sewer shall be per the specfications of the TriCo Regional Sewer Utility (see
reverse) and any conditions noted below. All installations shall be inspected by TriCo personnel during "open trench"
phase and before backfilling with stone to finrelve inches above the pipe. NO footing or foundation drains, or other
sources of ground or stormwater, shall be permitted to enter TriCo's sanitary sewer system. TriCo will assume no
liability for drains which are below the grade level of the nearest downstream manhole nor for laterals which are
extended beneath driveways or sidewalks. The petmit holder (property owner, developer or builder) will be
responsible for damages to TriCo's sewer system. This includes damages to manholes, castings, manhole lids and
the like; caused by construction activity on the building site which is the subject of this permit.
Inspections by TriCo are MANDATORY and shall be arranged by contacting TriCo's office at 844-9200 24 hours in
advance. All new construction wi11 be placed on billing two months after connection has been made or when water is
connected, whichever comes first.
The building has: Main ID: HSM17-HSM16
Grease Trap Slab Foundation
Grease Interceptor Crawl Space Manhole IDs USMH HSM-17 HSM-16 DSMH
Grit Interceptor Basement YES Lid Elevation 846.94,✓ 847,2g J
, Grinder Station First Floor Elevation 850.50 f 850.50 V
� Water Service Carmel Utilities Basement Etevation 840.70 J 840.70 v
-� - . . _.. _
_. _ — _j�
Calcula6on is based on both Manhole Lid Elevations and the eleva6on of the First Floor 3 56 j 3.21fFt. i
`_. _'....._ _ ....� .__.... __...I..__J
Per Ordinance 9-13-99 and the elevations provided, the substructure shall be plumbed by: Ejector Pump Only
TriCo currentiy requires that an I&I inspection is pertormed and a Certificate of Compliance is issued prior to oxupancy !
� sale of a properrty. Please review attached I/I Permit.
� Manholes shall remain accessible at all times. Buried manholes will be corrected by the Developer/Owner.
The proper class of cleanout must be installed every 100 feet of lateral pipe measured from sewer main to structure.
Th erms ot the conditional permlt, if any, are Iisted below.
Plans have been submitted.
All fees have been paid.
No certificate of insurance required.
No additional permits required.
No manhole core permit required.
The facility is not classified as a FOG facility.
(Notes)
By signing below, I attest that I am
Builder / Owner Signaturee
Printed Name
Appraved By �
Ryan
Permit is valid for
specifications and agree to accept responsibility for all work done under this permit
�---- � Phone Number
�
from the date issued. Permit valid only with TriCo se,