Loading...
HomeMy WebLinkAboutIDC - Holder Mattress Reno Construction Notes_P��3C�R An Intllane IJmlletl Gabilily Po�po�e�lon CONSTRUCTION NOTES vrnzo RE: HOLDER MATTRESS RENOVATION INDIANA DESIGN CENTER - SUITE 119 3,220 SQUARE FEET DEMOLITION PLAN NOTES Re(er lo supplemental drowing 1IDP1 for casework to be relocated antl revised HVAC. DPi. Remove casework from Ihis loca�ioa Save for reloca�ion. Patch and repair drywall as neetletl. DP2. Revise HVAC work at demising wall as needed. DP3. Remove chandelier and save for reuse. DP4. Remove emergency light and save for reuse. DP5. Remove �enant speaker and save for reuse. CONSTRUCTION PLAN NOTES Re(er lo supplemental drewing 1ICP1 for finishes and wall locations. FPi. New tlemising wall wlih a halchatl flll to be 6" 20 gauge melal stutls � i6" O.C. wilh (1) layer of Sl8" gypsum wall board on each side and 6" sound insulation. Wall to extend fmm the floor to the beam above. FP2. Provitle Johnsonile 4" vinyl cove base along new demising wall. Color of base ro be 08 Icide. FP2A. Provitle seoarate wst for Suite k123. Pmvide Johnsonite 4" vinyl cove base along new demising wall. Cobr of base to be 08 Icicle. FP3. Walls are �o be pain�ed as no�ed. Calor lo be determined by tenan�. FP3A. Pravitle seoarete cost for Suite It123. All walls are to be paintetl. Color to be tleterminetl by �enant. FP4. Provitle bbcking for relocation o( existing cabinetry. Cabinets to be installetl by wniractor. FPS. New recessed fre ex�inguisher cabinet to be installed in the wall at this loca�ion with �op of cabinet at 54" AFF. Paint to match atljacent wall surtace. Fire extinguisher cabinet to match building s�andard, unless noted o�herwise. FP6. Align fnishetl face of tlrywall. BEFLECTED CEILING PLAN NOTES Refer to supplemental tlrawing 1IRGP� for Ilgh6ng celling flnlshes, antl HVAC. GPi CP2. Touch up ihe open ceiling wim ihe building stantlard color. All exposetl mechanical and eleclrical items are to be pain�ed to match �he ceiling. Revise HVAC work at demising wall as needed. Use duct and hard pipe conduit in open ceiling areas fi match exi.�tinn RELEA5E0 FOR CONSTRACTI�N ino0"°" 1nCode "9'd `°"°°", s°PP°". a"d SubJect to compliance wlth all reguletlons his for sulte 123 as shown and add two (2) ofStateandLocalCodes , CityofCarniel �anel. "y �,:<� ��i..�� o�v��� � oarE: 04/03/20 ELECTRICAL/DATA PLAN NOTES Refer to supplemental drawing VEP1 for electrical and data. EP1. Provide new electrical and dala outle[s as shown with "N". EP1A. Provide seoarate rost for Suite #123. Provide new electrical outlets as shown wi�h "N". EP2. Provide new junction box for lenant supplied chandelier. See note CP3 for details. EP3. Provitle conduit with pull string for tenan� speaker sys�em at 144" AFF. Wiring and ins�all by tenant. EP4. Provide seoarate cost for Suite #123. Separate floor outlet boxes belween tenant spaces. RELEA5E0 FOR CONSTRl1CTI0N Subject to compliance with all regulations of State and Local Codes City of Carniel '�vmP.�''i'�o�V�� oarE: 04/03/20