HomeMy WebLinkAboutA013 - 14GGFIN. MAIN LEVEL
FINISHED BASEMENT LEVEL
T.O. PLATE (MAIN)
T.O. FOUNDATION
T.O. PLATE (GARAGE)
LAP SIDING PER SPECS
1X8 TRIM BOARD, W/ METAL DRIP EDGE
STUCCO TEXTURED HARDIE PANEL
5/4X6 TRIM BOARDW/ METAL DRIP EDGE
10" SQUARE BOX COLUMNS
BRICK PER SPECS
1X6 CORNER BOARD, TYP.
LAP SIDING PER SPECS
9"
12"
1X6 RAKE FRIEZE BOARD TYP.
METAL CHIMNEY CAP
1X6 TRIM BOARD
1X6 TRIM BOARD W/ METAL DRIP EDGE
SLOPED BRICK ROWLOCK SILL
TO BOTTOM OF HEADER8' - 0"TO BOTTOM OF HEADER8' - 10"FIN. UPPER LEVEL
T.O. PLATE (UPPER) 9" / 12"A3
5
1X6 RAKE BOARD, TYP
5/4X6 TRIM BOARDW/ METAL DRIP EDGE
TOP OF GUTTER BOARD9' - 6"9"
12" 9" / 12"9" / 12"4"
12"2'-0" MIN.2' - 7 1/2"3' - 0"1' - 2" 1' - 4 1/2"5 1/2"2" 1' - 4 1/2" 5 1/2"
6x6 CEDAR
4x6 CEDAR
6x6 CEDAR
SLOPED TOP
BLOCK AT RAKE
2' - 0"CUSTOMER:PROJECT NAME:LOCATION:DRAWING TITLE: DRAWN BY:WedgewoodBuilding Co., LLC317.669.630032 First Street NECarmel, IN 46032www.wedgewoodbc.comCopyright c 2019 Wedgewood Building Co. LLC. 3/18/2020
3:52:51 PM
A3Wedgewood Building Co.Lot #14 - Grannan Grove3733 Aldrew Place, Carmel, INEXTERIOR ELEVATIONS WBC 1/4" = 1'-0"1 RIGHT ELEVATION
2 EXTERIOR 3D VIEW (LEFT 1)3 EXTERIOR 3D VIEW (LEFT 2)
1/2" = 1'-0"5 BRACKET DETAIL
ELEVATION NOTES:
1. REFER TO COVER PAGE FOR SPANISH TRANSLATIONS = REFERIRSE A LA PORTADA DE LAS TRADUCCIONES AL ESPAÑOL.Rev.No. Date DescriptionBy Andrew Lund at 3:56 pm, Mar 18, 2020
04/03/20
Adam Schriner