Loading...
HomeMy WebLinkAboutS200.0EXISTING 2X4 FRAMING DEMOLITION & FRAMING KEY NO DEMO IN THIS ROOM EXISTING 2X6 FRAMING WALL SECTION TO BE REMOVED NEW 2x4 FRAMING NEW 2X6 FRAMING BULK HEAD / LOWERED CEILING DN DN 266826682668 6068 6068 2368 1' 12'-11 1/4" 13'-8"13'-6"4'-1"2'-1" 11'-1"2'-4" 2'-1"4'-2 3/8" 6'-9 1/8"2'-0 3/4"5'-5" 8' 2'-10 1/4" 5'-9 1/2" 6'-10 3/8"4'-2 3/8"4'-1 1/8" 8"5'-7 5/8"9'-5 1/2" 4'-4 1/2"10'-9 1/2"8'-7 3/4"4'-3 5/8" 4'-0 3/8"1'-6 7/8" 5'-1"2'-7 3/4"5'-3"7'-10" 8'-7 1/2" 4'-9 1/2" 4'-6 1/2" 9'-2" 5'-6 1/4" 7'-0 1/2" 6'-9" 5'-1 1/2" 6'-3 7/8"5'-6 5/8" 17'-10 1/2"RAILING RAILING RAILING NGRACE RESIDENCE1241 Westvale DriveLot Number 281Jackson Grant Section 2Westvale Section 2Carmel, IN 46032Date : Revision: 9 SHEET OF 25 SIGNATURE / SEAL Client Initials: Date: The plans, including all text, drawings, concepts and ideas, forming a part of the plans, and the selection and arrangement thereof Copright 2020 by Custom Living, Inc., Indianapolis IN. ALL RIGHTS RESERVED. The plans shall remain the property of Custom Living Inc. Any use of the plans, or their content, without the prior written permission of Custom Living. Inc is strictly prohibited. REV #1 10.31.19CUSTOM LIVING5335 Winthrop AveIndianapolis IN 462203/6/2020 DATE : [PRINTS TO SCALE IF PRINTED ON 24" X 36" ] DESIGNER: EMMA MAXWELLE: emma@customlivingusa.comC: 574.292.2441PROPOSED FLOOR PLAN - SECOND FLOOR SCALE: 1/4" = 1' GENERAL PROPOSED PLAN NOTES Framing contractors are responsible for all labor, for the scope of work specifed on the drawings provided by Custom Living. Owner understands that Custom Living has only provided a labor and material allowance for the scope of Rough Carpentry work specified on the drawings. Any additional work added or uncovered during this scope will be a Change Order during construction Owner understands that the Drywall Allowance is based on an estimated board count and square footage take-off. A final walk through with drywall contractor after framing and mechanical rough-ins will be necessary to finalize drywall install and finish budgets. Final drywall touchups will follow countertop installation. REV #2 REV #3 REV #4 11.5.19 1.20.20 1.23.20 REV #5 2.25.20 REV #5 3.6.20 04/06/20 David Rutti