HomeMy WebLinkAboutA040.011'-7 3/4"9'-1 1/2"4'-10 3/4" 6'-9"
3/4"
6"2'-4 1/2" 5'-0" 10 1/2"3'-0" 10 1/2" 7'-4 1/2" 1'-9"7 1/2"3'-0" DOOR
5 3/4"
3'-5" 4'-2 1/4"
8" 1'-0"1'-6 3/4" 2'-1" 2"2" WALL
COVERING
WOOD CTOP
PANEL
MOLDING
BUILT IN BOOK CASES
W/ ADJUSTABLE
SHELVES; TOP SHELF
IS FIXED
SCONCES
ROOM BASE
MOLDING
3/4" BAR
BACK
PANELING
NEW 36X80"
SOLID CORE
DOOR 9'-1 1/2"11'-7 3/4"
10 1/2" 3'-0" 10 1/2"
4'-9"5'-0" 7 1/2"1'-1 9/16"2'-4 1/2"6" 3/4" 4'-2 1/4" 6'-10 3/4"2'-3" 1 1/2"ROOM CROWN TO REMAIN
WALL COVERING
BUILT IN BOOK CASES W/
ADJUSTABLE SHELVES;
TOP SHELF IS FIXED
SCONCES
PANEL MOLDING
WOOD CTOP
3/4" BAR BACK PANELING
ROOM BASE MOLDING
#1
of
12
Date:
03.06.20
Sheet:
Revision:
www.caseindy.com
99 E. Carmel Drive, Suite 100
Carmel, Indiana 46032
317.846.2600 317.846.2601(f)
These drawings have been
prepared by Case Design &
Remodeling solely for its use and
should not be reproduced or relied
upon by any other parties.
Dimensions shown or scaled are
subject to change per actual job
condition and must be verified.
Materials are to be supplied as
specified as equal or standard
when not uniquely specified.
Installed materials may vary in
appearance from drawings.
Reference manufacturer's product
data for actual appearance and
specifications.Huber ResidenceMaster Bath RemodelRichard & Monica10529 Hyde ParkCarmel, Indiana 46032Approved By:
Date:
A502
FINAL
PROPOSED INTERIOR ELEVATIONS
Megan Nagy
Designer
mnagy@caseindy.com
Dave Null
Lead Designer
dnull@caseindy.com
SCALE: 1/2" = 1'
DOOR TO SHOWER ROOM AA TUB CABINETSBB
#2
#3
03.11.20
03.27.20
04/13/20
Mike Sheeks