Loading...
HomeMy WebLinkAboutA010.0SP SP 266826102868GFCI GFCI GFCI GFCI DM R R R R R R R R R R R 6'-11 3/8" 11'-9"11'-7 3/4"2"3'-0 1/8" 3'-5"2'-0" 7'-10 1/4"11'-0 1/4" 6'-3 3/8"4'-10 1/8"6'-1 1/4" 7'-6" 1'-8" 8'-4 1/2" 1'-8 1/2"2'-3 7/8" 2'-3 1/2" 7'-8 1/2"2'-10"2'-6" 6'-9 1/2" 2'-5 1/2"9'-9 3/8"2'-3" C.L.3'-6" C.L.2'-10" C.L.1'-8" C.L.3'-10"EXHAUST FAN HEAT LIGHT NIGHT LIGHT CEILING HEIGHT: 9'-1/2" MASTER BATH 1 137 SQ FT CARPET FLOORINGCEILING HEIGHT: 8'-11 3/4" MASTER BATH 2 73 SQ FT TILE FLOORING SHOWER 27 SQ FT INTERCOM SYSTEM BULKHEAD R/H DOOR R/H WALL SPEAKERS SPEAKER SWITCH WALL TYPES EXISTING WALLS EXISTING EXTERIOR SIDING WALL BULKHEAD DEMO WALLS NEW 2X4 WALLS NEW 2X6 KNEE WALL #1 of 12 Date: 03.06.20 Sheet: Revision: www.caseindy.com 99 E. Carmel Drive, Suite 100 Carmel, Indiana 46032 317.846.2600 317.846.2601(f) These drawings have been prepared by Case Design & Remodeling solely for its use and should not be reproduced or relied upon by any other parties. Dimensions shown or scaled are subject to change per actual job condition and must be verified. Materials are to be supplied as specified as equal or standard when not uniquely specified. Installed materials may vary in appearance from drawings. Reference manufacturer's product data for actual appearance and specifications.Huber ResidenceMaster Bath RemodelRichard & Monica10529 Hyde ParkCarmel, Indiana 46032Approved By: Date: EXISTING/DEMOLITION PLAN D101 FINAL Megan Nagy Designer mnagy@caseindy.com Dave Null Lead Designer dnull@caseindy.com SCALE: 1/2" = 1' #2 #3 03.11.20 03.27.20 04/13/20 Mike Sheeks