HomeMy WebLinkAboutL402GENERAL NOTES
1. A PRE-CONSTRUCTION MEETMG WITH THE OWNER/REPRESENTATIVE IS REQUIRED PRIOR TO LANDSCAPING ACTIVITIES.
INCWDINGREMOVALOFTREESAND/ORINSTALLATIONOFPLANTMATERIAL CONTRACTORTOCALLAMINIMUMOF14DAY5
PRIOR TO �ESIRED START DATE TO SCHEDULE PRE-CONSTRUCTION MEETMG.
2. REPORTANYANDALL�ISGREPANGIESBENJEENTHEWNSTRUGTION�RAWINGSAN�FIELDGON�ITIONSTOTHE
ENGMEERIARCHITECT IMMEDIATELY.
3. THE LOCATION OF ALL THE UTILITIES SHOWN ON THE PLAN IS APPROXIMATE. THE EXACT LOCATION SHALL BE DETERMINE� BV
THECONTRACTORONSITE ALLPLANTINGMAYBEADJUSTEDTOAVOI�CONFLICTSWITHUTILITIESANDIOREXISTINGABOVE
GROUN� ELEMENTS.
4. THE LAN�SCAPE WNTRACTOR SHALL NOTIFY IN�IANA 811, CALL 811 OR 800-382-5544, A MINIMUM OF 2 FULL BUSWESS �AYS
PRIORTO�IGGING. LAN�SCAPECONTRACTORISRESPONSBLEFORAVOI�ING�AMAGETOUTILITIESFROMPLANT
INSTALLATION.
5. BEFORECONSTRUCTIONBEGINSTHECONTRACTORISRESPONSIBLEFORLOCATINGALWNDERGROUNDUTILITIESANDSHALL
AVOID DAMAGE TO ALL UTILITIES DURING CONSTRUCTION. IF SUCH DAMAGE OCCURS THE CONTRACTOR IS RESPONSIBLE FOR
ANY NECESSARY REPAIRS AN� THEV SHOULD 6E MADE IMMEDIATELYATTHE CONTRACTORS EXPENSE WITH SUPERVISION OF
THE OWNER.
6. ALLWORKMUSTCOMPLVWITHTHEINDIANAUTILINREGULATORVCOMMISSION�1URC�.
]. THECONTRAGTORMUSTCOMPLYWITHALLSTATEANDLOCALWATERQUALITYSTANDARDS.
8. THECONTRACTORISRESPONSIBLEFOROBTAININGALLPERMITSTHATAREREQUIREDBYTHEREVIEWINGAGENCVFORTREE
REMOVAL RELOCATION, TREE PROTECTION OR INSTALLATION BEFORE BEGINNING WORK. CONTACT THE LOCALAGENCYTO
OBTAIN PERMIT INFORMATION.
9. ALLEXISTINGTREESSHALLBEPRUNEDTOANSIA300STANDARDSTOCORRECTPOTENTIALHAZARDS.
10. ALLEXISTINGTREESPROPOSEDTOREMAINARETOBESEPARATE�FROMTHELIMITSOF�ISTURBANCEOFTHECONSTRUCTION
AREA BV TREE PROTECTION FENCING AND SIGNAGE THE TREE PROTECTION FENCING SHALL BE LOCATED AT THE EDGE OF THE
TREE PROTECTION ZONE AS DEPICTED ON THE PLAN OR AT THE EDGE OF THE DRIPLINE�S) IF A TREE PROTECTION ZONE IS NOT
DESIGNATED. NO MATERIAL STORAGE OR CONSTRl1CTI0N ACCESS IS PERMITfED WITHIN THE TREE PROTECTION ZONE IF
APPLICABLE, REFER TO THE TREE DISPOSITION AND DEMO PLANS FOR ADDITIONAL NOTES AND DETAILS REQUIRED FOR TREE
REMOVAL OR RELOCATION.
11. DONOTSTOREORUSEANYMATERIALSORE�UIPMENTWITHINTHEDRIPLINEOFANVTREETHATISTOBERELOCATEDOR
PROTECTED IN PLACE UNLESS THE ACTNIN IS BEING DONE TO PROTECT THE TREES.
12. �ONOTDISCHARGEORCONTAMINATETHESOILWITHINTHEDRIPLINEOFANVOFTHETREESTOBERELOCATEDOR
PROTECTED IN PLACE. THIS INCLUDES SUBSTANCES SUCH AS PAINT, OIL, SOLVENTS, PETROLEUM PRO�UCTS, ASPHALT,
CONGRETE. MORTAR, OR ANY OTHER MATERIAL THAT MAY CAUSE DAMAGE TO THE TREE'S ROOT SYSTEM.
73. CLEARING OF VEGETATION WITHIN THE DRIP LINE OF THE TREES DESIGNATED TO BE PROTECTED IN PLACE OR RELOCATE�
SHALL BE PERFORMED CAUTIOUSLV WITH HAND TOOLS TO MINIMIZE ANY �AMAGE TO THE TREE'S ROOT SVSTEM.
14. DONOTATTACHANYTHINGTOTREESTHATARETOREMAINONTHESITEUNLESSITISSOMETHINGTHATWILLPROTECTAND
NOTDAMAGETHETREE.
15. NEEPANATURALGRADEABOVETHE�RIPLINEONANYTREETHATISTOBEPROTEGTEDINPLAGE.ANVPRESERVEDTREES
DISTURBED DURING CONSTRUCTION MUST BE RETURNED TO ITS ORIGINAL GRADE AFfER CONSTRUCTION.
i6. CAUTIONSHOUL�BEEXERCISEDWHENWORKINGNEAREXISTMGPLANTINGAN�ANYFURNISHMGSTHATISTOREMAINONSITE
TOPREVENTANYDAMAGE. ANVSIGNS,STRUCTURES,ORPLANTINGSHALLBEREPLACEDATTHECONTRACTORSEXPENSEIF
DAMAGED BEVOND USE. DAMAGED BEVOND USE WILL BE �ETERMINED BV THE OWNER.
17. ANY PUBLIC LAND CORNER WITHIN THE LIMITS OF CONSTRUCTION IS TO BE PROTECTE�. IF A CORNER MONUMENT IS IN DANGER
OF BEING �ESTROYE� AN� HAS NOT BEEN PROPERLY REFERENCE�, THE CONTRACTOR SHALL NOTIFY THE �ISTRICT LOCATION
SURVEYORIMMEDIATELY.
18. MAINTENANCEOFTRAFFICSHALLBEINACCORDANCEWITHTHEMANUALOFUNIFORMTRAFFICCONTROLDEVICESFOR
STREETS AND HIGHWAYS (U.S. DEPARTMENT OF TRANSPORTATION, F.H.W A.).
79. WHEREAPPLICABLE,THECONTRACTORSHALLINSURETHATINSTALLATIONOFALLPLANTMGINME�IANSANDRIGHTOFWAYS
CONFORMS TO CRITERIA SET FORTH IN I.N.D.O T. ROADWAY AND TRAFFIG DESIGN STANDARDS AN� IN I.N.D.O T. MAINTENANCE
RATING PROGRAM.
20. CONTRACTORISRESPONSIBLEFORCLEANINGALLWORKAREASATTHEENDOFEACHWORKINGDAV.ANYDEBRISSHALLBE
COLLECTEDANDDEPOSITE�APPROPRIATELVOFFSRE�AILY. ALLMATERIALS,PRO�UCTS,ANDEQUIPMENTSHALLBESTORED
IN AN ORGANIZED FASHION AS �IRECTED BV THE OWNER.
LANDSCAPE NOTES
1. CONCEPTUAL PLANTING PLANS ARE PoR REFERENCE ONLYAND NOT FOR CONSTRUCTION. TREE AND SHRUB PLANTING AREA LOCATIONS SHOWN
ARE RECOMMENDATIONS BASED ON �ESIGN INTENTAND COORDINATE� UTILITV LOCATIONS. CONTRACTOR TO PROVI�E FINAL LANDSCAPE PLANS
WITH COMPLETE PLANT SPECIFICATIONS, QUANTITIES AND LOCATIONS TO OWNER FOR APPROVAL. PLANTING NOTES AND DETAIL HERE IN PROVIDED
ARE FOR REFERENCE ONLY. RQAW SHALL NOT BE LIABLE FOR ANV INFORMATION CONTAINE� IN THE CONCEPTUAL PLANTING PLAN, NOTES, OR
PLANTING DETAILS. THE LANDSCAPE CONTRACTOR TO PROVI�E THEIR OWN DESIGN AND VERIFV TREE AND PLANT LOCATIONS MEET ALL MINIMUM
REQIIIREMENTS AND DO NOT CONFLICT WITH UNDERGROl1ND UTILITIES OR LWE OF SIGHT FOR VEHICULAR MOVEMENTS.
2. CONTRACTORSHALLREFERTOTHELANDSCAPEPLANTINGDETAILS.PLANTLIST,GENERALNOTES,ANDANYOTHERMATERIALSFROMTHE
LAN�SCAPE ARCHITECT FOR COMPLETE LANDSCAPE PLANTMG INSTRUCTIONS.
3. INSTALLATION -ALL PLANT MATERIAL SHALL BE INSTALLED IN A SOUND WORKMANLIKE MANNER AN� AGCORDING TO G00� PLANTING PROCEDURES
WITHTHEQUALITVOFPLANTMATERIALSASHEREINAFTERDESCRIBED. ALLELEMENTSOFLANDSCAPINGSHALLBEINSTALLEDSOASTOMEETALL
APPLICABLE ORDINANCES AND CODE REQUIREMENTS.
4. THELANDSGAPEGONTRAGTORSHALLOBTAINANDPAYFORALLPERMITSANDFEESTHATMAYBEREQUIRE�FORHISPORTIONOFTHEWORK.
5. CONTRACTOR TO SUBMIT UNIT PRICES ON EVERV TVPE OF WORK TO BE PERFORMED.
6. CONTRACTORSSHALLFIELDVERIFYALLINFORMATIONPRIORTOINITIATINGPLANTINGINSTALLATION. ALLEXISTINGPLANTINGSHALLREMAIN
INTACT AND UNDISTURBED UNLE55 OTHERWISE NOTED ON THE PLANS.REPORT ANY AND ALL DISCREPANCIES BETWEEN THE CONSTRUCTION
DRAWINGS AND FlELD CONDITIONS TO THE ENGWEER/ARCHITECT IMMEDIATELV.
�. LANDSCAPECONTRACTORSHALLREPLACE(BYEQUALSIZEANDQUALITY)ANVANDALLEXISTINGPLANTMATERIALDISTURBEDORDAMAGEDBV
PLANT REMOVAL, RELOCATION OR INSTALLATION.
8. ALL PLANTWG MUST PoLLOW PLANTWG SPEQFlCATIONS AN� DETAILS SHOWN ON THE PLANS AN� SUPPORTING DOCUMENTS.
9. ALLPLANTMATERIALFURNISHEDBVTHELANDSCAPECONTRACTOR,UNLESSOTHERWISESPEqFIE�,SHALLMEETOREXCEEDAMERICAN
STANDARDS FOR NURSERY STOCK, AN51 Z6�.1-2004. ALL PLANT MATERIAL MUST BE HEALTHY, VIGOROUS MATERIALS, FREE OF PESTS AND DISEASES.
DAMAGED PLANT MATERIAL SHALL BE REJECTED AND REPLACED PRIOR TO INSTALLATION.
10. CONTRACTOR SHALL IMME�IATELV REMOVE ALL PLANTING THAT �OES NOT MEET SPECIFICATIONS AN� BE HEL� RESPONSBLE TO REPLACE IT WITH
APPROPRIATE PLANTING.
11. ALLPLANTMATERIALSMUSTBEPROTECTED�URINGTRANSPORTANDDELIVERVTOTHEJOBSREWITHSHADECLOTHOROTHERACCEPTABLE
MFANS OF WINDBURN PREVENTION.
12. PLANTSANDALLOTHERMATERIALSTOBESTOREDONSITEWILLBEPLACEDWHERETHEVWILLNOTCONFLICTWITHCONSTRUCTIONOPERATIONS
AND AS DIRECTED BV LANDSCAPE ARCHITECT.
PLANTING BED PREPARATION
13. FlNAL PLACEMENT OF PLANT MATERIALS, ETG SHALL BE APPROVED BY THE LANDSCAPE ARCHITECT BEFORE PLANTING OPERATIONS ARE TO
PROCEE�. ALL TREE LOCATIONS SHALL BE MARKE� WITH A W00� STANE INDICATING VARIETY AND SIZE OF TREE. ALL GROUN� COVER AN�
PLANTING 8ED LINES SHALL BE MARKED WITH HIGHLY VISIBLE PAINT LINES WITH OCCASIONAL WOOD STAKES FOR REFERENCE. ALL STAKES SHALL
BEREMOVEDFOLLOWINGPLANTINGOPERATIONS. LANDSCAPEARCHITECTRESERVESTHERIGHTTOADJIISTPLANTLOCATIONSONTHESITETHE
FINAL LOGATIONS GAN BE A�JUSTE� ON SITE TO ACGOMMO�ATE UNFORESEEN FIELD CONDITIONS. THESE GHANGES MUST GOMPLV WITH ALL
SAFETV SETBACK CRITERIA AND BE DIRECTED OR APPROVED BV THE LAN�SCAPE ARCHITECT AND THE REVIEWING AGENCY.
14. NPICALLY, SHRUB AN� GROUNDCOVER PLANTINGS ARE SHOWN AS MASS PLANTING BEDS. PLANTS SHOULD BE PLACED ON ATRIANGULAR SPAGNG
SHOWNINTHEPLANTINGDETAILS. PLANTCENTERTOCENTERDIMENSIONS�O.CJARELISTEDONTHEPLANTLIST.
15. ANAPPROVE�PRE-EMERGENTHERBICIDESHALLBEAPPLIEDINALLPLANTMGBEDSATARATESPECIFlE�BYTHEMANUFACTURERPoREACHPLANT
VARIETV, PRIOR TO PLANT INSTALLATION-
i6. NOFERTILIZERSHALLBEAPPLIEDTONEWLYPLANTEDTREES.
17. ALL LANDSCAPE MATERIAL SHALL BE THOROUGHLY WATERED AT THE TIME OF PLANTMG, NO DRY PLANTING PERMITTED.
18. ALL STAKES, WIRE GUVS ANDIOR FABRIC STRAPS SHALL BE FLAGGE� WITH FLORESCENT COLORE� TAPE.
19. ALL NEWLV LANDSCAPED AREAS SHALL BE EXCAVATED �OWN TO A �EPTH OF 12 INCHES BELOW FINAL GRADE AND 301NCHES BELOW FINAL GRA�E
AT PLANTING AREAS WHERE ERISTING PAVEMENT IS TO BE REMOVED. E%CAVATED PLANTMG AREAS SHALL BE BACK FILLED WITH CLEAN
DEBRIS-FREE SOIL EXISTING SOIL MAY BE RE-USED FOR BACKFlLLING IF DEBRIS IS REMOVE� AN� ORGANIC CONTENT IS SUFFICIENT OR SOIL IS
AUGMENTED WITH TOPSOIL CONSTRUCTION ACCESS SHALL BE RESTRICTED FROM THE LANDSCAPE AREA AFTER EXCAVATION AND BACKFILL IS
COMPLETE.
20. SCARIFYSUBSOILTOADEPTHOF3WCHES.
2t CONTRACTOR SHALL VERIFV THE PROPER DRAINAGE AND PERCOLATION OF ALL PLANTMG PITS AND LANDSCAPE AREAS PRIOR TO INSTALLATION OF
PLANT MATERIAL.
22 ALLLANDSCAPEAREASSHALLBEFlNISHGRADEDSIICHTHATTHEYAREAMINIMUMOF3.51NCHESBELOWSURROl1NDMGPAVEDSURFACESS0A5
NOT TO IMPEDE THE FLOW OF DRAINAGE INTO LANDSCAPED AREAS AND TO ALLOW FOR A 3-INCH MULGH LAVER OR S0�
23 FlNISHGRADEALLPREPAREDTOPSOILAREASTOASMOOTH,EVENSURFACEASSURINGPOSITNEDRAINAGEAWAYFROMTHESTRUCTURESAND
ELIMINATE ANV LOW AREAS WHICH MAV COLLECT WATER. REMOVE ALL ROCKS AN� OTHER OBJECTS OVER 1" IN DIAMETER.
24. GENERALGRADMGTOAPPROXIMATELYIMGHSHALLBEPROVIDEDBVTHEGONTRAGTOR.ALLFINISHEDSITEGRADINGANDFINALDECORATIVE
BERM SHAPING SHALL BE PROVIDED BY THE LANDSCAPE CONTRACTOR.
25. TREES GROWN IN GROW BAGS OR GROW BAG TYPE MATERIAL MUST HAVE THE GROW BAG REMOVED ENTIRELY BEFORE PLANTING.
26. BALLE�AN�BURLAPMATERIALSHALLHAVETHEBURLAPAROUNDTHEBASEOFTHETRUNNANDTOPOFTHEROOTBALLGUTAN�PULLEDBAGK. �0
NOTREMOVETHEBURLAP. WIRECAGESNEEDTOBECUTANDPULLEDBACKTOATLEASTBELOWTHETOPONETHIR�V)OFTHEROOTBALL.
STRAPS, TAGS, ETC. MUST BE Cl1T AN� REMOVED COMPLETELY BEFORE INSTALLATION.
BE 12". MULCH AREAS IN THE DOG PARK SHALL HAVE A fi" DEPTH.
IRRIGATION
32. WNTRACTORTOPROVIDEADESIGNBUIL�IRRIGATIONSVSTEMTHATPROVIDE5100°/COVERAGEPoRALLLANDSCAPEAREAS. TURFANDSHRUB
AREAS SHALL BE ON SEPARATE ZONES. IRRIGATION SYSTEM SHALL BE AUTOMATIC AND E�UIPPED WITH A ZONE TIMER AND RAIN SENSOR. IF A
POTABLE CONNECTION WILL BE USED A BACKFLOW PREVENTER WILL BE REQUIRED ATTHE POINT OF CONNECTION. IRRIGATION SVSTEM SHALL
PROVIDE FULL HEA� TO HFAD COVERAGE IN ALL AREAS. NO SPRAV HEADS SHALL OVERSPRAY ONTO WALNING PATHS, STRUCTURES, OR VEHICULAR
USEAREAS.
LAWN AREA PREPARATION AND INSTALL
33. ALLLAWNAREASWITHINLAWNLIMITLWESTORECENE6"APPROVEDTOPSOILPRIORTOSEEDINGOPERATIONS.
34. SCARIFVSUBSOILTOADEPTHOF3INCHES.REMOVEALLROGKSAN�OTHEROBJECTSOVERI"INDIAMETER.
35. LAWNS SHALL BE SEEDE� FOLLOWING SCARIFYING, FINAL GRADING, FERTILIZING, AND RAKING LAWN SHALL BE FERTILIZED WITH 8-2440 ANALVSIS
FERTILIZER AT A RATE OF 10LBS PER 100S.F. AND LIME APPLIED AS DICTATED BV SOILS TEST PRIOR TO SEEDING LAWNS TO BE SEEDED WITH
MECHANIGALSPREADERATARATEOFSLBSPERI�OOSF. APPLYSEED1/20NEDIREGTIONANDiRPERPENDICULARTOTHEFIRST. LIGHTLYRAKE.
ROLL WITH 200 LBS ROLLER AND APPLY HYDROMULCH AFTER SEEDING.
36. ALLDISTURBEDLAWNAREASSHALLBESEEDE�ASNOTE�. PERMANENTSEEDEDLAWNSSHALLBESEEDMIXASAPPROVEDBYLANDSCAPE
ARCHITECT. SEED MIX SHALL CONSIST OF 34 POUNDS WABASH OR BARON KENTUCKY B W EGRA55. 2� POUNDS PARK KENTUCKY B W EGRA55.20
POUNDS PENNLAWN FESCUE AND 26 POUNDS CERTIFlED FlNE BLADED PERENNIAL RVEGRASS.
3]. CONTRACTOR SHALL BE RESPONSIBLE TO REPLACE ALL PORTIONS OF EXISTMG LAWN AREAS DAMAGE� DURING CONSTRUCTION AN� WHILE
COMPLETMG PLANTING INSTALLATION WITH SAME GRASS SPECIES TO THE SATISFACTION OFTHE LANDSCAPE ARCHITECT. NO LANDSCAPE AREAS
ARE TO BE LEFT 11NSOD�ED OR SEEDED UNLESS SHRl18 MATERIAL IS TO BE PLANTED.
SOIL SPECIFICATION
38. ENSURE THATALL PLANTING SOIL IS FERTILE, FRIABLE, NATURAL LOAM SURFACE SOIL, REASONABLY FREE OF SUBSOIL, CLAV LUMPS, WEEDS AN�
OTHER LITTER. AND FREE OF ROOTS,STUMPS AND STONES LARGER THAN ONE INCH IN ANY DIMENSION. AND OTHER EXTRANEOUS OR TO%IC MATTER
HARMFUL TO PLANT GROWTH. SHOUL� ANV SOIL AMENDMENT BE NECESSARY, THE CONTRACTOR SHALL BRMG THIS TO THE ATTENTION OF THE
LAN�SGAPEARCHITECT.
39. APPLYAPPROVEDHERBICIDE-ACCORDINGTOMANUFACTURERSRATEANDSPECSWITHINLIMITSOFALLAREASTOBEPLANTED.PROTECTEXISTING
PLANTS TO REMAIN FROM OVERSPRAV OR SPRAV WITHIN ROOT 20NE. CONTRACTOR TO ENSURE TOTAL WEED ERADICATION.
40. BAGKFILLFORTREEANDSHRUBPLANTINGSSHALLBEFROMEXISTINGSOILS.A5�1�-5ANALVSISSLOWRELEASEFERTILIZERSHALLBE
WCORPORATED INTO BACKFlLL AT APPROVED RATES. CONTRACTOR SHALL BE RESPONSIBLE PoR TESTING EXISTING SOILS AND PROVI�ING ANV
REQUIRE�SUPPLEMENTS. CONTRACTORSHALLSUBMITLABTESTINGRESULTSFORSOILUSE�FORBACKRLLOFPLANTSAN�TREES.
41. PEATMOSS TO BE USED ON PROJECT SHALL BE DOMESTIC OR IMPORTED MATERIAL CHOCOLATE BROWN IN COLOR AND COMPOSED OF PARTIALLY
�ECOMPOSEDVEGETABLEMATERIAL PEATMOSSTOBEMILDLYACI�ICINCHARACTERANDSHALLBEAPPROVEDBYTHELANDSCAPEARCHITECT.
42. TOPSOILSHALLNOTBEEXTREMELYACI�ICORALKALINE,NORCONTAINANVTOXICSUBSTANCEWHICHMAYBEHARMFULTOPLANTGRON4H. THE
PH SHALL BE IN THE RANGE OF fi.5-0.0.
WARRANTEE AND MAINTENANCE
43. CONTRACTORISRESPONSIBLEFORWATERINGANDMAINTAININGALLTREESANDLANDSCAPEUNTILFINALACCEPTANCEBYTHELANDSCAPE
ARGHITECT AN� REVIEWING AGENGV. CONTRACTOR IS RESPONSIBLE FOR REPLACEMENT OF PLANTS IF DEAD OR DYING PRIOR TO FINAL
ACCEPTANCE.
44. CONTRACTOR SHALL RE�UEST INSPECTION OF PROJECT IN WRITING. ONCE ALL WORK IS SATISFACTORY AND COMPLETE IN ACCORDANCE WITH
CONDITIONS OF THE CONTRACT DOCUMENTS, THEN THE REVIEWING AGENCY AND LANDSCAPE ARCHITECT SHALL DECLARE FINAL ACCEPTANCE OF
THE PROJECT.
45. ALLLAN�SCAPEPLANTINGSSHALLBEGUARANTEE�FORAPERIODOFONEYEARFOLLOWINGFINALACCEPTANCEBYLANDSCAPEARCHITECTAN�
REVIEWINGAGENCV. ATENDOFTHISPERIOD.PLANTMATERIALTERMEDDEADORUNSATISFACTORYBVLANDSCAPEARCHITECTSHALLBE
REPLACED AT NO ADDITIONAL CHARGE BY THE LANDSCAPE CONTRACTOR.
46. CONTRACTORTOREPLACEREJECTE�PLANTMATERIALWITHINONEWEEKOFNOTICE.
47. ALLLAWNSSHALLBEGUARANTEEDTOHAVEAFULLUNIFORMSTANDOFACCEPTABLEGRASSATTHEENDOFTHEONEYEARGUARANTEEPERIOD
WITH NO BARE SPOTS COMPRISING MORE THAN 2% OF ANY LAWN AREA. ANY AREA SO NOTED WILL BE SEEDED UNTIL AN ACCEPTABLE STAND OF
GRASS IS ESTABLISHED.
48. ALL LANDSCAPE PLANTINGS TO BE MAINTAWED BY WNTRACTOR FOR 60 DAYS FOLLOWING FINAL INSPECTION BY LANDSCAPE ARCHITECT. ALL
SEEDE� LAWNS SHALL BE MAINTAINED FOR 60 �AYS FOLLOWING FINAL INSPECTION BV LANDSCAPE ARCHITECT AFTER WRITTEN REQUEST FROM THE
LANDSCAPE CONTRACTOR. MAINTENANCE TO INCLUDE WATERING. WEEDING, CULTIVATING, MULCHING, MOWING, AND ALL OTHER NECESSARY
OPERATIONS REQIIIRED PoR PROPER ESTABLISHMENT OF LAWNS AND PLANTINGS
49. ALLINSTALLEDPLANTINGSSHALLBEAPPROPRIATELYWATEREDFORAMINIMUMPERIODOFONEYEARTOALLOWFORTHEIRESTABLISHMENT. ALL
TREE STAKING, GUY WIRES, STRAPS AND HOSES TO BE REMOVED ONE YEAR AFTER PLANTING.
5�. ALLLANDSCAPEMATERIALSSHALLBEMAINTAWEDTOPROVI�ECONTINUOUSCLEARZONESPoRSIGHTVISIBILITVFORPEDESTRIANSAN�
VEHICULAR TRAFFIC.
51. ANVMAINTENANCETHATINVOLVESTRAFFICACTIVITVSHALLBECOOR�INATEDWITHTHECONTRACTORANDONGOINGCONSTRUCTIONACTNITIES.
,a••. R�THE "•,�
o �' ""'"' N@ .
; P O.�G�S ifRF9G ��;
U• � � ;�P
� ; No.uneooais �, �
� `. STATE OF �'A .
�`9�0.. .!N D I A N P.".t�"�:.'
��
RELEA5E0 FOR CONSTRIlCTION
Su6jec� �o compliance with all regula�ions
of S�a�e antl Local Codes
City of Carmel
r
�un��\i lo•rvalM��.
oarE: 04/14/20
MULCHING
27. ALLLANDSCAPEAREASNOTCOVEREDBYSODORSEE�SHALLBECOVEREDBVAMINIMUM3-INCHLAYEROF CLEANMULCH.
28. AMULCHRINGWITHAMINIMUMRADWSOF241NCHE5(481NCHDIAMBER),ISREQIIIREDAROUNDALLNEWLVINSTALLEDTREES.
29. NOMULCHSHALLBEPLACE�TOUCHINGORWITHINTHREEINCHESOFTHETRUNKOFATREE.
30. MULCHSHALLBEAPPROVEDBVLANDSCAPEARCHITECTANDSHALLBEUNIFORMINTE%TUREANDCOLORANDSHALLBEOBTAINEDFROMSAWMILL
ORWMBERMGOPERATIONS. NOUTILITYMULCHORPROCESSE�TREETRIMMWGSWILLBEACCEPTED. Ml1LCHSHALLBECLEANANDFREEOFANV
WEEDS OR FUNGUS.
31. MULCH USED FOR SURFACING IN THE PLAYGROUND AND THE DOG PARK SHALL BE AN ADA CERTIFlED MULCH FOR USE ON PLAY SURFACES.
CONTRACTORTOSUBMITCUTSHEETANDCERTIFICATE FORAPPROVAL MULCHLAVERDEPTHINTHEPLAVGROUNDSHALLBESUPPLEMENTEDTO
�
S
W
�
_
U
O
0
z
O
�
U
�
S
�
V]
O
r�
�!
W
S
C
�
d
�
�
0
f
�
W
J
�
`"'!
W
�
�
�
C
�
�
f
W
�
z
C
�
3
# Revision Date
1 BIDSETADDEN�OM 01I0212020
Project #: 20-400-038-1
Designed By: CR
Drawn By: JB
Checked By:AC
Date: 12/1612019
1'-10 N
0 10' 20' /
G3RAPHC SCALE � i
LANDSCAPE NOTES
L402