Loading...
HomeMy WebLinkAboutSPPPLAYGROUND12 PS5 PSGOVERNOR'S SQUARECLUBHOUSE1825 JEFFERSON DR WFFE=825.75POOL AREADUMPSTERENLOSUREJEFFERSON DR EFFE=825.79AC UNITSBENCHRAMPSTEPSSTEPSGRASSSTOOPSIGNSTEP=825.75(NO ACCESS)FFE=825.79FFE=825.78FFE=825.79NO ACCESSETFFE=825.76FFE=825.75HANDRAILBRICKCOLUMNS(TYP)82582 4 8238 2 2 825824823822823 8 2 4 822 820 8 2 1822820821822823825 824825 820823824CLEANOUTTREETREEDesigned By: CRDrawn By: JBChecked By: ACDate: 12/16/2019Project #: 20-400-038-1governor square renovation 1825 Jefferson drive west, Carmel, in 46032 construction documents#RevisionDate 1 BID SET ADDENDUM01/02/20200010'20'L000DEMOLITION PLANDEMOLITION LEGEND:DEMOLITION NOTES: 1.CLEAR AND GRUB ALL VEGETATION NECESSARY FOR CONSTRUCTION.2.IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO REMOVE ALL MUD, DIRT, GRAVEL,AND ANY OTHER MATERIALS TRACKED ONTO ANY PUBLIC OR PRIVATE STREETS ORSIDEWALKS. THE CONTRACTOR SHALL USE MEASURES TO CONTROL DUST AT ALL TIMES.3.THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING, OR VERIFYING, THAT ALLPERMITS AND APPROVALS ARE OBTAINED FROM THE RESPECTIVE CITY, COUNTY, ANDSTATE AGENCIES PRIOR TO STARTING CONSTRUCTION.4.ALL EROSION CONTROL MEASURES SHALL BE IN PLACE PRIOR TO COMMENCING DEMOLITION.5.ENSURE SAFE PASSAGE OF PERSONS AROUND AREAS OF DEMOLITION AND CONSTRUCTION. CONDUCT OPERATIONS TO PREVENT DAMAGE TO ADJACENTSTRUCTURES AND OTHER FACILITIES AND INJURY TO PERSONS.6.CONDUCT DEMOLITION AND CONSTRUCTION OPERATIONS TO ENSURE MINIMALINTERFERENCE WITH STREETS, WALKS, AND OTHER ADJACENT OCCUPIED STRUCTURES.7.ALL UTILITIES TO BE REMOVED SHALL BE DISCONNECTED AND CAPPED AT THE NEARESTCONNECTION POINT UNLESS SPECIFIED OTHERWISE.8.UTILITIES ARE SHOWN TO BE APPROXIMATE. THE CONTRACTOR SHALL COORDINATEWITH RESPECTIVE UTILITY(S) COMPANY FOR THE REMOVAL, RELOCATION, AND/ORDEMOLITION OF ALL EXISTING UTILITIES.9.ALL DEMOLISHED MATERIALS SHALL BE REMOVED AND LEGALLY DISPOSED OF OFF-SITEUNLESS NOTED OTHERWISE.10.CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING PROPER DRAINAGE INDEMOLITION AREAS.11.THE USE OF ANY TYPE OF EXPLOSIVES WILL NOT BE PERMITTED.12.PROMPTLY REPAIR DAMAGE TO ADJACENT FACILITIES CAUSED BY DEMOLITION ANDCONSTRUCTION OPERATIONS AT NO EXTRA TO THE OWNER.13.DEMOLITION ITEMS INCLUDE BUT ARE NOT LIMITED TO DEMOLITION ITEMS INDICATEDON THIS PLAN. IT IS THE CONTRACTOR'S RESPONSIBILITY TO REMOVE OR RELOCATEITEMS WHICH INTERFERE WITH NEW CONSTRUCTION.14.THE OWNER/DEVELOPER AND/OR CONTRACTOR SHALL BE RESPONSIBLE FORMAINTAINING QUALITY CONTROL AT ALL TIMES DURING THE CONSTRUCTION PROCESS.15.CONTACT OWNER IMMEDIATELY IF CONTAMINATED SOILS ARE ENCOUNTERED DURINGCONSTRUCTION. CONTAMINATED SOILS MUST BE HAULED OFF-SITE AND PROPERLYDISPOSED.2EXISTING WATER LINEEXISTING STORM SEWEREXISTING UNDERGROUND ELECTRIC LINEDEMOLITION LIMITS (CONCRETE, ASPHALT)SAWCUT AND REMOVE EXISTING CONCRETE SIDEWALK AND BASEMATERIAL.3EXISTING GAS LINEEXISTING CONCRETEDEMOLITION KEYNOTES:456SAWCUT & REMOVE ASPHALT AND BASE MATERIAL.178910SAW CUT AND REMOVE EXISTING CURB.EXISTING ROOF DRAINS TO REMAIN. PROTECT ANDMAINTAIN DURING CONSTRUCTION.PROTECT EXISTING PLAYGROUND EQUIPMENT IN PLACE.PROTECT EXISTING CURB AND SIDEWALK IN PLACE.EXISTING FIRE HYDRANT TO REMAIN. PROTECT AND MAINTAINDURING CONSTRUCTION.EXISTING UNDERGROUND COMMUNICATIONSCALL 2 WORKING DAYS BEFORE YOU DIGREMOVE EXISTING HANDRAIL. STORE SAFELY FORREFURBISHING AND REINSTALL.REMOVE EXISTING TIMBER PLAYGROUND EDGE.REMOVE EXISTING BENCH AND FOOTING