Loading...
HomeMy WebLinkAboutA121 REFLECTED CEILINGERAL N 1. PROVIDE EMERGENCY LIGHTING IN TENANT SPACE AS REQUIRED PER NEMA AND BC. EMERGENCY BATTERY PACKS OR LIGHTS CONNECTED TO AN EMERGENCY POWER SOURCE ARE REQUIRED IF THE SPACE CONTAINS 50 PERSONS OR MORE. FIXTURES SHOWN ON PLAN ARE FOR REFERENCE ONLY. 2. WHERE CEILING GRID IS SHOWN, PROVIDE NEW 24" X 24" ARMSTRONG SILHOUETTE q' REVEAL 16' SUSPENDED CEILING GRID WITH ARMSTRONG GEORGIAN #ll538 TEGULAR BEVELED EDGE 24" X 24" X e". GRID TO BE AT 9'-0" AFF AS ALLOWABLE FOR HVAC EQUIPMENT AND STRUCTURAL BUILDWG ELEMENTS. 3. SUSPENDED CEILING HEIGHT IS 9'-0" UNLESS OTHERWISE NOTED AS ALLOWABLE PER HVAC EQUIPMENT AND STRUCTURAL BUILDWG ELEMENTS. 4. UNLESS OTHERWISE NOTED, ALL SWITCHES TO HAVE OCCUPANCY SENSORS WITH COMBO UNIT, BOTH ULTRASONIC AND INFRARED TECHNOLOGY WITH ONE BUTTON OVERRIDE. OCCUPANCY SENSORS ARE TO BE LOCATED SUCH THAT OCCUPANCY WITHIN ANY PORTION OF THE WCLUDED AREA IS DETECTED. PROVIDE CEILING MOUNTED OCCUPANCY SENSORS IN AREAS AS REQUIRED. 5. ALL NEW SWITCHES AND FACE PLATES TO BE WHITE. 6. PRIOR TO INSTALLATION, CONFIRM EXACT PLACEMENT OF PENDANTS WITH RELOCATION STRATEGIES. PLAN NOTES PROVIDE NEW CORRIDOR CEILING GRID: 24" X 24" USG ROl FINELINE DXF 16" SUSPENDED GRID WITH USG HACYON CIMAPLUS #98225 SL EDGE 24" X24" X 1" CEILING TILES. PROVIDE BUILDING STANDARD LIGHT FlXTURES. DESIGN INTENT IS FOR THE CEILING GRID AND LIGHTING TO MATCH LAYOUT OF EXISTING CORRIDORS. COORDINATE ALL REQUIREMENTS AND SWITCHING WITH PROPERTY MANAGEMENT. EXISTING BUILDING SKYLIGHTS TO REMAIN. PROVIDE 4" WIDE R02 DRYWALL BULKHEAD SURROUND AT EACH SKYLIGHT. BULKHEAD TO EXTEND DOWN 1" BELOW HEIGHT OF CEILING GRID AND BE PAINTED (PT7). CONTRACTOR SHALL ENSURE THAT THE SKYLIGHTS ARE STRUCTURALLY SOUND AND NO VISIBLE LEAKS ARE PRESENT. CLEAN ALL EXPOSED SURFACES AND PREPARE FOR KRYLON R03 PAINT (PT5) PER MFG. PAINT EXISTING EXPOSED CEILING DECK, EXPOSED DUCTWORK, SPRINKLER PIPWG, JUNCTION BOXES, CONDUIT, STRUCTURAL BEAMS, AND FIREPROOFING IN ACCORDANCE WITH NFPA 13 63.8. AT THIS LOCATION, PROVIDE 3-WAY LIGHTWG CONTROL R04 SYSTEM FOR: ENTRY, LOUNGE/BREAK AREA, COPY, OPEN WORK AREAS. PROVIDE MULTIPLE SWITCHES TO ACCOMMODATE MULTI-SWITCH PLATE. AT THIS LOCATION, PROVIDE 4-WAY LIGHTING CONTROL ROS SYSTEM FOR: ENTRY, LOUNGE/BREAK AREA, COPY, OPEN WORK AREAS. PROVIDE MULTIPLE SWITCHES TO ACCOMMODATE MULTI-SWITCH PLATE. 7. ALL HVAC AND MECHANICAL CONSTRUCTION R06 DELETED DRAWINGS TO FOLLOW - COMPLETED BY OTHERS. SUSPENDED CEILING SPECIFlED AS STANDARD CEILING GRID 8. ALL SWITCH MOUNTWG HEIGHTS SHOULD BE AT 48" R07 WITH ARMSTRONG WOODWORKS TEGULAR PANELS LAID IN AEE TO CENTER PER ADA. TO GRID. PROVIDE 4" AXIOM TRIM PACKAGE. REFERENCE FINISH PLAN (SHEET A131 �. 9. LIGHTWG PLACEMENT AND QUANTITIES ARE FOR REFERENCE ONLY AND ARE TO BE PROVIDED BY WHERE SUSPENDED CEILING IS TO MEET WINDOW WALL, LIGHTING CONSULTANT AND ELECTRICIAN. ELECTRICAL R08 ADD BULKHEAD FROM DECK TO 9'-0" SUSPENDED CEILING CONTRACTOR WILL BE RESPONSIBLE FOR LAY-OUT TO FINISH APPROXIMATELY 8" FROM WINDOW WALL FINISH VERIFICATION AND ENSURE TOTAL WATTAGE MEETS REMAINING -8" SPACE WITH SUSPENDED CEILWG TO ALIGN ASHRAE 90.1 STANDARDS AND LIGHT LEVELS ARE WITH TOP TRIM PORTION OF TRANSOM. VERIFY BUILD-OUT APPROPRIATE FOR THE USE OF EACH SPACE WITH BUILDWG MANAGEMENT (ATAPCO). 10. ALL EXPOSED ACOUSTICAL CEILING TILE EDGES TO BE FINISHED WITH 4" WHITE AXIOM TRIM UNLESS NOTED OTHER W ISE. 1 I. WHERE CEILING TRANSITIONS FROM OPEN DECK TO PERPENDICULAR DRYWALL, PAINT TO UNDERSIDE OF STEEL WEBBING WITH (PTS) PAINT. 12. WHERE CEILING TRANSITIONS FROM OPEN DECK TO SUSPENDED CEILING, ADD 4" BULK HEAD TO FlNISH. BULK HEAD TO RECEIVE (PTl) PAINT. LEGEND �i Lz �3 MEiALUX 2' X 2' CRUZE LED 22CZ 239-U N V-L835-C D I-U MEiA W% 2% 4' CRUZE LED 24CZ2-45-UNV-L835-CDI-U MEiALU%2' %4' CRUZE LED 24CZ2-50-UNV-L835-CDI-U LUMENWERX VIA 2 SERIES �� VIA2PD-HLO-FH-LED-80-]50-35-4 MOUNiING HEIGHT: 9'-0" AEF. is �°i% � � NL �N �N3 �N4 �NG KUZCO LIGHiING ANELLO - PD 1 D22-BK MOUNiING HEIGHT: 6'-8" A EF. EAiON HC415D010-HM4128%-41 WDW EHIi LIGHT Fl%il1RE - LED EDGE LIT MAiCH BUILDING SiANDARD EMERGENCY LIGHi FlXTURE MATCH BUILDING STANDARD NIGHi LIGHT LOCATION ueHrswircH LIGHTSWITCH: &WAY LIGHiSWITCH' 4-WAY S W ITCH : GARBAGE DISPOSAL �TO BE ABOVE COUNTERTOP� RELEA5E0 FOR CONSTRIICTI�N Su6jec� �o compliance with all regula�ions of S�a�e antl Local Codes City of Carmel �un��\i lo.va�M��_ oarE: 04/16/20 LIGHT FIXTURE TO BE INSTALLED AT 6'-8" A.F.F. CONFIRM OFINAL INSTALLATION HEIGHT WITH TENANT AND RELOCATION R09 STRATEGIES PRIOR TO COMPLETWG INSTALL. R 10 LIGHT FIXTURE (L4) TO BE SPACED b'-0" APART AT CENTER LINE. PROVIDE 4" WIDE DRYWALL BULKHEAD AT CEILING R� � TRANSITION TO DECK AND EXTEND DOWN 1"BELOW HEIGHT OF CEILWG GRID. BULKHEAD TO BE BE PAINTED (PTl). POWER AND DATA IN CEILING FOR PROJECTOR. R�2 COORDINATE REQUIREMENTS WITH AV VENDOR FOR INSTALL LOCATION IS I 1' OFF WEST WALL, AND CENTERED ABOVE TABLE PROJECTOR IS A"CHRISTIE- DWU630GS- W HITE." � CEILING GRID-SUSPENDED 2' X 2' OPtn 10 JtCK WOODWORKS TEGULAR 2' x 2' BULKHEAD LIGHiING REP: SPECIFIED LIGHTWG TRAG ASHCRAFT 317-340�9423 � / SCALE : 3/16" = 1'-0" N � � N Zo /�� — U �y = w J •� O � � � d w Q Q O � Z Q N •� �� 0 Z }i � O � — � L mQ O � � O N W Q' � 03 �/ �3 I.L � w — Y O U o � o � v � � o N N �o n � a w j�F � zw l9i"za a¢ � �k z�>azroz y�o w�a� z�p�w�� U wUi O�zw�O�pyzQ� �w� o�WO�o�owo_m��r��w rc LL � °ixO��ODUw�on,',�zO�i wazQB��z��o�o�oo�o w��>�zwayz�i�iozo �au���°o wa� u'O4m U wz O��— 5�0¢¢ i< ��� ° O a � z' x x — � � Qn O V W w � N Q N M w O J >� N �Z Z� W J � w � � J U�U > � V � � a 0 d Q � 0 � w w � ti � � N w � � W > w . � � � � � N w o O H o 0 Q N N Q W 1� N� (�I Ci ,�peumrrrrn.�� . aZdON Y f i �•,, :.' P „''s �e,.F, �'•�" C '� �". Cd�i' 36E1 :'" T3 � s1A.e cr ,-; _ �L9'..',NniwN?.•%C �: C ...� � ,"�h pt OimneG`°"V`,. ��" REFLECTED CEILING PLAN A121