HomeMy WebLinkAboutA121 REFLECTED CEILINGERAL N
1. PROVIDE EMERGENCY LIGHTING IN TENANT SPACE AS
REQUIRED PER NEMA AND BC. EMERGENCY BATTERY
PACKS OR LIGHTS CONNECTED TO AN EMERGENCY
POWER SOURCE ARE REQUIRED IF THE SPACE CONTAINS
50 PERSONS OR MORE. FIXTURES SHOWN ON PLAN ARE
FOR REFERENCE ONLY.
2. WHERE CEILING GRID IS SHOWN, PROVIDE NEW 24" X 24"
ARMSTRONG SILHOUETTE q' REVEAL 16' SUSPENDED
CEILING GRID WITH ARMSTRONG GEORGIAN #ll538
TEGULAR BEVELED EDGE 24" X 24" X e". GRID TO BE AT
9'-0" AFF AS ALLOWABLE FOR HVAC EQUIPMENT AND
STRUCTURAL BUILDWG ELEMENTS.
3. SUSPENDED CEILING HEIGHT IS 9'-0" UNLESS OTHERWISE
NOTED AS ALLOWABLE PER HVAC EQUIPMENT AND
STRUCTURAL BUILDWG ELEMENTS.
4. UNLESS OTHERWISE NOTED, ALL SWITCHES TO HAVE
OCCUPANCY SENSORS WITH COMBO UNIT, BOTH
ULTRASONIC AND INFRARED TECHNOLOGY WITH ONE
BUTTON OVERRIDE. OCCUPANCY SENSORS ARE TO BE
LOCATED SUCH THAT OCCUPANCY WITHIN ANY
PORTION OF THE WCLUDED AREA IS DETECTED.
PROVIDE CEILING MOUNTED OCCUPANCY SENSORS IN
AREAS AS REQUIRED.
5. ALL NEW SWITCHES AND FACE PLATES TO BE WHITE.
6. PRIOR TO INSTALLATION, CONFIRM EXACT PLACEMENT
OF PENDANTS WITH RELOCATION STRATEGIES.
PLAN NOTES
PROVIDE NEW CORRIDOR CEILING GRID: 24" X 24" USG
ROl FINELINE DXF 16" SUSPENDED GRID WITH USG HACYON
CIMAPLUS #98225 SL EDGE 24" X24" X 1" CEILING TILES.
PROVIDE BUILDING STANDARD LIGHT FlXTURES. DESIGN
INTENT IS FOR THE CEILING GRID AND LIGHTING TO MATCH
LAYOUT OF EXISTING CORRIDORS. COORDINATE ALL
REQUIREMENTS AND SWITCHING WITH PROPERTY
MANAGEMENT.
EXISTING BUILDING SKYLIGHTS TO REMAIN. PROVIDE 4" WIDE
R02 DRYWALL BULKHEAD SURROUND AT EACH SKYLIGHT.
BULKHEAD TO EXTEND DOWN 1" BELOW HEIGHT OF CEILING
GRID AND BE PAINTED (PT7). CONTRACTOR SHALL ENSURE
THAT THE SKYLIGHTS ARE STRUCTURALLY SOUND AND NO
VISIBLE LEAKS ARE PRESENT.
CLEAN ALL EXPOSED SURFACES AND PREPARE FOR KRYLON
R03 PAINT (PT5) PER MFG. PAINT EXISTING EXPOSED CEILING
DECK, EXPOSED DUCTWORK, SPRINKLER PIPWG, JUNCTION
BOXES, CONDUIT, STRUCTURAL BEAMS, AND FIREPROOFING
IN ACCORDANCE WITH NFPA 13 63.8.
AT THIS LOCATION, PROVIDE 3-WAY LIGHTWG CONTROL
R04 SYSTEM FOR: ENTRY, LOUNGE/BREAK AREA, COPY, OPEN
WORK AREAS. PROVIDE MULTIPLE SWITCHES TO
ACCOMMODATE MULTI-SWITCH PLATE.
AT THIS LOCATION, PROVIDE 4-WAY LIGHTING CONTROL
ROS SYSTEM FOR: ENTRY, LOUNGE/BREAK AREA, COPY, OPEN
WORK AREAS. PROVIDE MULTIPLE SWITCHES TO
ACCOMMODATE MULTI-SWITCH PLATE.
7. ALL HVAC AND MECHANICAL CONSTRUCTION R06 DELETED
DRAWINGS TO FOLLOW - COMPLETED BY OTHERS.
SUSPENDED CEILING SPECIFlED AS STANDARD CEILING GRID
8. ALL SWITCH MOUNTWG HEIGHTS SHOULD BE AT 48" R07 WITH ARMSTRONG WOODWORKS TEGULAR PANELS LAID IN
AEE TO CENTER PER ADA. TO GRID. PROVIDE 4" AXIOM TRIM PACKAGE. REFERENCE
FINISH PLAN (SHEET A131 �.
9. LIGHTWG PLACEMENT AND QUANTITIES ARE FOR
REFERENCE ONLY AND ARE TO BE PROVIDED BY WHERE SUSPENDED CEILING IS TO MEET WINDOW WALL,
LIGHTING CONSULTANT AND ELECTRICIAN. ELECTRICAL R08 ADD BULKHEAD FROM DECK TO 9'-0" SUSPENDED CEILING
CONTRACTOR WILL BE RESPONSIBLE FOR LAY-OUT TO FINISH APPROXIMATELY 8" FROM WINDOW WALL FINISH
VERIFICATION AND ENSURE TOTAL WATTAGE MEETS REMAINING -8" SPACE WITH SUSPENDED CEILWG TO ALIGN
ASHRAE 90.1 STANDARDS AND LIGHT LEVELS ARE WITH TOP TRIM PORTION OF TRANSOM. VERIFY BUILD-OUT
APPROPRIATE FOR THE USE OF EACH SPACE WITH BUILDWG MANAGEMENT (ATAPCO).
10. ALL EXPOSED ACOUSTICAL CEILING TILE EDGES TO BE
FINISHED WITH 4" WHITE AXIOM TRIM UNLESS NOTED
OTHER W ISE.
1 I. WHERE CEILING TRANSITIONS FROM OPEN DECK TO
PERPENDICULAR DRYWALL, PAINT TO UNDERSIDE OF
STEEL WEBBING WITH (PTS) PAINT.
12. WHERE CEILING TRANSITIONS FROM OPEN DECK TO
SUSPENDED CEILING, ADD 4" BULK HEAD TO FlNISH.
BULK HEAD TO RECEIVE (PTl) PAINT.
LEGEND
�i
Lz
�3
MEiALUX 2' X 2' CRUZE LED
22CZ 239-U N V-L835-C D I-U
MEiA W% 2% 4' CRUZE LED
24CZ2-45-UNV-L835-CDI-U
MEiALU%2' %4' CRUZE LED
24CZ2-50-UNV-L835-CDI-U
LUMENWERX VIA 2 SERIES
�� VIA2PD-HLO-FH-LED-80-]50-35-4
MOUNiING HEIGHT: 9'-0" AEF.
is
�°i%
�
�
NL
�N
�N3
�N4
�NG
KUZCO LIGHiING
ANELLO - PD 1 D22-BK
MOUNiING HEIGHT: 6'-8" A EF.
EAiON
HC415D010-HM4128%-41 WDW
EHIi LIGHT Fl%il1RE - LED EDGE LIT
MAiCH BUILDING SiANDARD
EMERGENCY LIGHi FlXTURE
MATCH BUILDING STANDARD
NIGHi LIGHT LOCATION
ueHrswircH
LIGHTSWITCH: &WAY
LIGHiSWITCH' 4-WAY
S W ITCH : GARBAGE DISPOSAL
�TO BE ABOVE COUNTERTOP�
RELEA5E0 FOR CONSTRIICTI�N
Su6jec� �o compliance with all regula�ions
of S�a�e antl Local Codes
City of Carmel
�un��\i lo.va�M��_
oarE: 04/16/20
LIGHT FIXTURE TO BE INSTALLED AT 6'-8" A.F.F. CONFIRM
OFINAL INSTALLATION HEIGHT WITH TENANT AND RELOCATION
R09 STRATEGIES PRIOR TO COMPLETWG INSTALL.
R 10 LIGHT FIXTURE (L4) TO BE SPACED b'-0" APART AT
CENTER LINE.
PROVIDE 4" WIDE DRYWALL BULKHEAD AT CEILING
R� � TRANSITION TO DECK AND EXTEND DOWN 1"BELOW HEIGHT
OF CEILWG GRID. BULKHEAD TO BE BE PAINTED (PTl).
POWER AND DATA IN CEILING FOR PROJECTOR.
R�2 COORDINATE REQUIREMENTS WITH AV VENDOR FOR
INSTALL LOCATION IS I 1' OFF WEST WALL, AND CENTERED
ABOVE TABLE PROJECTOR IS A"CHRISTIE- DWU630GS-
W HITE."
�
CEILING GRID-SUSPENDED 2' X 2'
OPtn 10 JtCK
WOODWORKS TEGULAR 2' x 2'
BULKHEAD
LIGHiING REP:
SPECIFIED LIGHTWG
TRAG ASHCRAFT 317-340�9423
�
/
SCALE : 3/16" = 1'-0" N �
�
N Zo
/�� — U
�y = w
J
•� O �
� � d w
Q Q
O � Z
Q N
•� �� 0 Z
}i � O
� — �
L mQ
O � � O
N W
Q'
� 03
�/ �3
I.L �
w —
Y O
U o
� o
�
v �
� o
N N
�o n
�
a w j�F � zw
l9i"za a¢ � �k
z�>azroz y�o w�a�
z�p�w�� U wUi
O�zw�O�pyzQ� �w�
o�WO�o�owo_m��r��w
rc LL �
°ixO��ODUw�on,',�zO�i
wazQB��z��o�o�oo�o
w��>�zwayz�i�iozo
�au���°o wa� u'O4m
U wz O��—
5�0¢¢ i< ��� ° O
a � z' x
x — � � Qn
O
V
W
w � N
Q N M
w O
J >�
N �Z
Z�
W J
�
w � �
J
U�U
>
�
V
�
�
a
0
d
Q
�
0
� w w
� ti �
�
N w �
� W > w .
� � � �
�
N
w o O
H o 0
Q N N
Q W 1�
N�
(�I Ci
,�peumrrrrn.��
. aZdON Y f i �•,,
:.' P „''s �e,.F, �'•�"
C '� �".
Cd�i' 36E1 :'"
T3 � s1A.e cr ,-; _
�L9'..',NniwN?.•%C �:
C ...� �
,"�h pt OimneG`°"V`,.
��"
REFLECTED CEILING
PLAN
A121