Loading...
HomeMy WebLinkAboutC902-STORMWATER POLLUTION PREVENTION DETAILS� � u n C r ' SEE�BE� PREPARATION 1. APPLV LIME TO RAISE THE pH TO THE LEVEL AS NEEOE� FOR SPEQES BEING SEEDEO. 2 APPLV 23 POUNOS OF PHOSPHOROUS FREE FERTILIZER: 12-�-12 ANALY515 (OR EQUIVALENI) PER 1000 Sp. Ff. (APPROXIMAIELY 1000 POUNDS PER ACRE) OR FERTILIZE ACCORDING TO TEST. APPLICATION OF 150 LBS. OF AMMONIUM NITRATE ON ARFAS LOW IN ORGANIC MATfER ANO FERtILIIY WILL GREAtLY ENHANCE VEGEfATIVE GRO0.TH. 3. WORK THE FERTILIZER AN� LIME IMO THE SOIL TO A �EPTH OF 2-4 INCNES WITH A HARROW, OiSN OR RAKE OPERPTEO ACRO55 THE SLOPE AS MUCM AS POSSIBLE. 4. STRAW MULCH AIUST BE APPLIED WITH ANY SEEDING. SLOPES 6:1 OR GRFATER AN� STORM WATER CONVEVANCE SWALES MUSi BE STABILIZE� WRH EROSION CONTROL BUNKEf. SELECT A SEE� MIXTURE BASED ON PROJECTE� 115E OF THE AREA (SEE PERIAANENi SEE� MIXIURE CHAR1). WMLE WNSIDERING BES1 SEE�ING DA1ES. li PERMANENI SEEDING IS NOT PERMITTE� USE TEAIPORARY SEEOING UNTIL PERMANENT SEEDING CAN BE APPLIEO. IF iOLERANCES ARE A PR06LEM, SUCH AS SALi iOLERANCE OF SEEDINGS A�JACEM TO STREEfS AN� HIGHWAYS, SEE SEE� IDLERANCE CHART. sai� w�,w n` � wa mrvoinary �� WEf NORM �RY �� 3z creEEvwc reeo reswe p � p � � ��Eo. i zo-zs iz-ie �-zi FESNG RIIBIiA KENiUCKY BLUEGRA55 2 � 2 � � 1 MEO. t 20-35 12-18 10-PO POP GROtIN515 tALL FESCUE 2 � � � � � �OW 1 Y4-35 44-36 5-14 rEstucn �. nreunoirvacea PERENNIAL RYEGRA55 ME� LOLWM PERENNE � � � - � � HIGH � �5-20 1Y-16 5-10 reeo c�overe � _ z _ _�Eo. i �-io ie s-io TRIFOLIUM PROtENSE - �nrv��; sn�r ro�anrvcc /To eoiry so � sn�Ts e svRnr) 1 G00� T IDLERANCE 2 ME�IUM Mt MEOIUM TOLERANCE - NOi TOLERANT 5 SLIGHT iOLERRNCE TEMPORARVSEEDING iVPE OF SEEO 1000 50. R. ACRE REIAARKS WHEAi OR RVE 3.5 LBS. 2 BLL COVER SEEO 1" i0 1 1/2" DEEP SPRING OAiS 2.3 LBS. 3 BLL WVER SEE� 1" �EEP ANNUNL RYEGRA55 1 LB. 40 LB. COVER SEED 1/4" DEEP " NOT NECESSARY WHERE lAIILCH IS APPLIE�. WH�,T oF JAN FEB MAR APR MAY JUN Jl1L AUG SEP OCT NOV OEC RVE OATS tA55 ANNl1AL RVEG PERMANENTSEEDING DATES JAN FEB IAAR APR MAV JON JUL AUG SEP OCT NOV DEC SEEDINC ❑IRRIGATION NEE�E� �URING THIS PERI00. TO CONTROL EROSION PT TIMES OTMER THAN IN THE SHA�EO AREAS. OSE AIULCH. " UTE SUMMER SEEDING OATES MAV BE E#EN�EO 5 OAYS IF MULCN IS APPLIE�. �• INCREASE SEE�ING APPLICATION BV SOX. TEMPORARV SEEDING DATES IF SLOPE OF ENTRANCE E%CEEDS PUBLIC ROAO �s• u 1T WERIAP crvos or eurvK EROSION CONTROL BUNNEf (NORTH AMERICAN GREEN 51WBN� OR APPROVE� EOUAL) ANCHOR TOP EDGE 2 Of BIANKEt IN b�x6' TRENCH � s, 1 � GEOTEXRTILE r�ow s^xY' hnreow000 aosrs; Mirv. 3' IN l£NGTH rxs• Hnaow000 caoss BRACE; NAIL BRACES MTO EACH CORNER POST GEOTEX�ILE FABRIC aaTi P045 SHALL HAVE A MINIMUM LENGiH OF �T 36 INCHES PWS BURIAL DEPTH. POS� MATERIAL SHALL BE W00�, StEEL, OR SYNiHEfIC, AN� SHALL BE OF SOPFlCIENI SiRENGiH 10 RESISt �AMAGE ouawc irvsrn�uriory nrvo ro suaaoer aaaueo LOADS. FA9RIC SHALL BE A WOVEN GEOtE%11L£ FABRIC CONSISTING OF STRONG ROT RESISTANT, MATERIALS RESISTANT TO �ETERIORATION FROM ULTRAVIOLET AND HEAT E%POSURE. extervo Fnareic�� ' '� I to e" aE�aw � / suarncc � �� � DETAIL 906 - NON-PAVED AREA CATCH BASIN INLET PROTECTION DETAIL GRAiE CURB INLEf OR CATCH BASIN REINFORQNG 9AR5 FOR�� REMOVAL OP �EVICE �\ . STORM AN�/OR acstrenirvt �\�/ T" THICKNESSJ B" MIN. Z�M/N� GRADE FOUNDATION AND CRO yPpSN Op FOR POSITNE DRNNAGE "'N p.M NP�E t0. IN�OT COORSE AGGREGATE �1P��N W�tH N0.2- WASHED RELEASED FOR CONSTRACTION .r�� �qaR�� ra �qa����E N (ESPECIALLY IMPORTANT Su6jec��o compliance with allregula�ions wEfNE55 IS ANTICIPATED) otS�a�ea�dla�alCode: -TEMPORARYCONSTRUSTIONENTRANCE CityotCarmel (SITES 2 ACRES OR LARGER) 0 ,��� ��'io,�,�l Nor ro scn� � � onrE: 09/19/19 INSTALLATION DETAIL �: AS AN ALTERNATNE, THE CONTRACTOR MAV SUBSTITUTE A COMMERCIAL GEOTEMILE FlLTER OR AN APPROVE� EQUAL. DETAIL 905 - EROSION CONTROL INLET PROTECTION FOR CURB INLET AND CATCH BASINS i u nNCHoa roa Eocc (StAPLE OF BIpNKEf IN 6"X6� p� TRENCH PREPARE� & SEEDE� 6' MIN. TOPSOIL IAYER COMPACiE� FILL u NOTES. 1. PREPARE SOIL BEFORE INSTALLING BIANKETS, INCWOING APPLICATION OF LIME, iERTILRER AN� SEE�. 2. BEGIN Ai iHE TOP �F iHE SLOPE BY ANCHORING iHE BIANKEf IN 6" �EEP X fi" DEEP WIDE TRENCH. BACKRLL AND COMPACT THE TRENCH AFfER STAPLING. 3. ROLL iHE BUNKEfS (A) DOWN OR (B) HORRONiALLY ACRO55 iHE SLOPE. iHE E�GES OF PAFALLEL BIANNES MOSi BE STAPLEO WRH APPROX 2 ' OVERIAP. 4. WHEN BIANKETS MOST BE SLICE� DOWN THE SLOPE, PUCE BUNKEfS END OVER EN� (SHINGLE SiVLE) WIiH APPROX. 12" OVERIAP. 5. EROSION CONTROL BLANKEfS SHALL BE INSTALLEO ON ALL 3:1 SLOPED, OR SiEEPER SLOPES WITH A MIN. OF fi" OF TOPSOIL. 6. SLOPE BL4NKEf5 SHALL BE WSTALLE� ON FlLL SLOPES IMME�IATELV AFfER EMBANKMENlS ARE ESiABLISHE�. AT THE EN� OF EACH WORKING DAV. NO MORE iHAN W FEEf OF SOIL SHALL BE E%POSE� WItHOIIt BIANKES ON PERMANENt 3:1 FlLL SLOPES. J. CONiRACTOR SHALL INSTALL SOPER 9LT FENCE ON 2:1 SLOPES HT 50 FEEf (MA%J WCREMENTS ALONG THE SLOPE LENGTH IN ACCOR�ANCE WITH THE EROSION AND SE�IMENTATION WMROL PLANS AND DEfAILS IMME�IAiELV AFfEft EMBANKMENiS ARE ESiABLISHED. DETAIL 907 - SLOPE BLANKET INSTALLATION �. / � \ / sEE NarE r�o. i u W2 = (WC x 3) END OF FLARED SECTION -oani�u aiaE witH 1 Fueeo er�o sectioN wc . I RIPRAP s �_ wi (wc + �a) � ENo oF naaoN � PUN GEO?E%iILE FABRI� MIN. 0 % SLOPE -r , � � - - 1" MIN. Fl� 1 FaaRic ua Nnluan�-.. OF NEEoco) GRADE L� VE ATION ...�1. OUTLEf La W1 W2 WC T H 450 4MA% RIPRAP �� Ex. 12' 10 I( 11 ft. 3 R. 12" 12 In. 18 in. 8 in. 12 In. � � �I �� � � I��� � i (THICNNE55) i I UYER OF GEOTEXTILE FABRIC SECTiON B-B BLOWN/ FlLTER I NOiES'. `� 1. COMPOST RLTER SOCK TO BE FlLTREXX SILTSOX% OR APPROVE� EOIIIVALENT. 2. SEE PLAN SHEEf FOR SIZES ANO L�CATIONS OF FlLTER SOCKS. DETAIL 904 - FILTER SOCK NOT TO SCALE SIZE rews nents DETAIL 903 - BELOW GRATE INLET PROTECTION Noi io sca�E i GrateMaster - Type A DETAIL 902 - RIP RAP APRON DETAIL NOT TO SCALE - L > ia Ma ausnc��� PLAN LINING EXtEND OVER '', 7ypE "ABOVE GRADE" TOP OF 6ALE ` �SiAKE (iYP.) MIN. 2 PER BALE p' i �e" oin. i STEEL WIRE� < srna�E oErni� BALE (ttP.) POST 3� % 8 WIiH SiRAW BALES CONCREfE WASHOUT SIGN OEfAIL (OR EQUIVALEM) StAaLES WOOD OR METAL (z aca an�E) srnucs (z acR an�c) "oTEs. COMPACTE ���. SiRAW BALE 1. ACTUAL lAYOUT DEfERMMED SOIL ��. ENTRENCHED W RELD. \ 4" INTO SOIL 2. THE CONCREfE WASHOUT SIGN - - -- - SHALL 9E INSiNLLED WIiHIN SECTION B-B 3a rr. or rHE tcrnPaanm CONCREfE WASHOUT FAQLItt. DETAIL 901- CONCRETE WASHOUT BMP NOT TO SCALE GEOTEX�ILE SPACE POSlS PER iABRIC MANUiACTURER RECOMMEN�AtI0N5 i u NOTES. 1. CLA55 OR ME�IAN SIZE OF RIPRAP AN� LENGTH, WIDTH AN� DEPTH OP APRON TO BE �ESIGNED BV THE ENGMEER AND ARE SUMMARIZED BELOW. 2. RIPRAP SHOULD EXTEND UP BOTH SIDES OF THE APRON AND AROUN� THE END OF THE PIPE OR CULVERT AT THE DISCHARGE OUTLEf AT A MAXIMUM SLOPE OF 2:1 AND A HEIGHT NOT LE55 THNN T40 THIROS THE PIPE DIAMEfER OR CULVERT HEIGHT. 3. iHERE SHALL BE NO OVERFLOW FROM iHE END OF iHE APRON i0 iHE SURFACE OF iHE RECEIVING CHANNEL. iHE AREA i0 9E PAVE� OR RIPRAPPED SHALL BE UN�ERCUi 50 iHAi ?HE INVERI OF 1HE APRON SHALL BE A1 iHE SAME GRADE (FWSH) WI1H iHE SURFACE OF ?HE RECEIVING CHANNEL THE APRON SHALL HAVE A CUWFF OR TOE WALL AT THE �OWNSTREAM EN�. 4. THE WIDTH OF THE ENO OF THE APRON SHALL BE EQUAL TO THE BOTTOM WI�TH OF THE RECEIVING CHANNEL MAX. TAPER TO RECEIVING CHANNEL 5:1. 5. ALL SUBGRADE FOR STRUCTURE TO BE COMPACTED TO 95% OR GREATER. 6. THE PUCING OF FlLL, EITHER LOOSE OR COMPACTED IN THE RECEIVING CHANNEL SHALL NOT BE ALLOWED. J. NO 9END5 OR CURVES IN iHE HORIZONIAL ALIGNMENI OF iHE naRON wi�� eE aERMittEo. 9. FlLTER FABRIC SHALL BE INSTALLE� ON COMPACTE� SUBGRA�E PRIOR TO PLACEMENT OF RIPRAP. 9. ANV DISTIIRBED AREA FROM EN� OF APRON TO RECENING CHANNEL MUST BE STABILIZED. � I GEOTEXTILE FABRIC °T I_I I_ WOOD POSi JOINT WRAP DEiAIL �TE POStS SHALL HAVE A MINIMOM LENGiH OF b6 INCHES PWS BURIAL �EP?H. POSt MAtERIAL SHALL BE W00�, STEEL, OR SYNTNEiIC, AND SHALL BE OG SUFFlQENT STRENGTH TO RESIST DAMAGE DORING INSTALLATION AND TO SOPPORT APPLIED LOA�S. FABRIC SHALL BE A WWEN GEOTEXTILE GABRIC CONSISTING OF STRONG, ROT RESISTANT, MATERIALS RESISTANT TO OEfERIORAiION FROM ULTRAVIOLET AN� HEAT E%POSURE. DETAIL 900 - SILT FENCE NOT W SCALE i J ZP Investments, LLC Office North Illinois St Carmel, IN 46032 Owner ZP Investments, LLC 11460 N Mendian Street Carmel,IN 46032 317-705-5050 Architect/ Landscape Architect RATIO ......... ......... ......... ......... 101 South PennsyNania Street Indianapolis, Indiana 46204 317-633-4040 Structural Engineer CE Solutions 10 ShoShone Dr. Carmel, IN 46032 317324-6024 Mechamcal / Eledncal Engineer Heapy Engineering 3850 Priority Way 5. Dr #204 Indianapolis, IN 46240 317-571-8795 Civil Engineer Civil and Environmental Consultants, Inc. 530 E Ohio Street G Indianapolis, IN 46204 317-655-7777 �� KEY PLAN SEAL � DATE 07/12/19 ILL 9���ONC���°o4 z �, �: ��sTFR�G � o . P:�,E eo .�� w : Q: No ¢ � * • PN0300058 •7 * Q , STATEOF : i 0•'� d T Z U'_ %90,�' :'�'OfAN?.' ��'c , U) I� f'y� NG ,� Q ,'��I//I 111� ��,,, (�onmCHw,i 07�IG�< SHEETISSUE 1 �EMOLITION & MA55 GRAOING PLANS 07'72119 2 DEM08MASSGRADINGRESUBMITTAL 07116119 PROJECT NO. 02000.00( SHEET TITLE STORMWATER POLLUTION PREVENTION DETAILS SHEETNUMBER C902 ' 1- PREFERRE� Y- WILL TOLERAff