Loading...
HomeMy WebLinkAboutM100.0CEILING WALL FLOOR T COLD AIR RETURN HVAC KEY FLOOR SUPPLY REGISTER WALL SUPPLY REGISTER CEILING SUPPLY REGISTER EXTERIOR WALL EXHAUST VENT THERMOSTAT DRYER BOX G W GAS SHUT-OFF KEY PLUMBING KEY MAIN WATER SHUT-OFF ICE MAKER BOX LAUNDRY BOX FROST PROOF HOSE BIB CLEAN OUT TILE-IN DRAIN FLOOR DRAIN ELECTRICAL KEY REF. OUTLET MICRO.OUTLET DW POWER SUPPLY HOOD VENT POWER SUPPLY GB POWER SUPPLY DIMMER SWITCH SURFACE MOUNT LIGHT FIXTURE 6" RECESSED CAN LIGHT 4" RECESSED CAN LIGHT 6" RECESSED CAN/FAN UNIT EXHAUST FAN ONLY EXHAUST FAN W/ LIGHT WALL MOUNTED SCONCE / LIGHT CEILING FAN LOW VOLTAGE LIGHT SMOKE DETECTOR MOTION SENSOR CEILING SPEAKER LOW VOLTAGE LIGHTING SWITCH GARBAGE DISPOSAL SWITCH COUNTERTOP AIR SWITCH SINGLE POLE SWITCH LOW VOLTAGE TRANSFORMER 220/240V OUTLET EXTERIOR OUTLET GFCI OUTLET 110V OUTLET GAS COOKTOP CLOTHS DRYER OUTLET 4-WAY SWITCH 3-WAY SWITCH NNS S S S S S S S S S S S S S SSS S WHWH WH UP UP SUMP PIT EJECTOR PIT SUMP PIT H / ACH / AC H / AC H / ACH / AC H / AC H / AC H / AC H / AC H / ACH / AC H / AC H / AC H / AC H / AC H / ACH / ACH / AC H / AC H / AC H / AC H / AC H / AC H / AC H / AC H / AC H / AC H / ACH / ACH / AC H / AC H / AC H / AC H / ACH / ACE / L E / LE / L E / L E / L E / L E / L E / L E / L E / L E / LE / LE / L P / LP / LP / LP / L P / L P / L EP EP EP EP EP GFI GFI 1 5'-4 7/8"13'-7 1/4"3'-0 1/2"1' 1 9'-1 1 " E1 E1 LINEDRAINGAME ROOM STORAGE UTILITY FINISHED EXISTING GAME ROOMBAR McCaw Residence Basement Ceiling Plan Scale: 1/4" = 1'-0" 03.16.2020 E2E2 SUMP DRAIN AIR RETURN BAYS BATH SUMP DRAIN P7P7UTILITY E1E1 UTILITY P8P8 P4P4 P1P1 P9P9 FITNESS UP UP T CW CD GFI GFI GFIGFI GFI R4 POWDER BATH CE BEDROOM CLOSET VANITY BATH BATH NEW DINING ROOM HALL STORAGE BUTLER 'S PANTRY ELECTRICALMETERP8P8P8P8 P2P2P3P3P5P5 P4P4 P6P6 WASHER DRYER E3E3 E4E4 E5E5 E5E5 PASSAGE McCaw Residence First Floor Plan Scale: 1/4" = 1'-0" 03.25.2020 E6E6 E6E6 REV 1 REV 1 REV 1 REV 1 REV 1 PLUMBING PLAN NOTES INSTALL TOILET INSTALL TOILET AND CONNECT BIDET SEAT ATTACHMENT INSTALL SHOWER DRAIN FOR 0 THRESHOLD WEDI SYSTEM INSTALL WALL-MOUNTED SHOWER HEAD AND TEMPERATURE CONTROL VALVE INSTALL SHOWER WAND AND TEMPERATURE CONTROL VALVE INSTALL WASHING MACHINE AND STEAM DRYER CONNECT SUMP PUMP DRAINS WITH A Y CONNECTOR OUTSIDE OF FOUNDATION WALLS INSTALL FAUCET AND HOOK-UP SINK DRAIN AND FAUCET WATER CONNECTIONS INSTALL A BATTERY BACK UP FOR EACH SUMP PIT P1P1 P2P2 P3P3 P4P4 P5P5 P6P6 P7P7 P8P8 P9P9 P1P1 P2P2 P3P3 P4P4 P5P5 P6P6 P7P7 P8P8 P9P9 McCAW RESIDENCEMaster Suite Addition11007 Crooked Stick LaneCarmel, IN 46032Date:Revision: 6 SHEET OF 14 SIGNATURE / SEAL Client Initials: Date: The plans, including all text, drawings, concept, and ideas forming a part of the plans and the selection and arrangement thereof are Copyright 2018 by Custom Living Inc. Indianapolis, Indiana. ALL RIGHTS RESERVED. The plans shall remain the property of Custom Living Inc. Any use of the plans or their content without the prior written permission of Custom Living Inc. is strictly prohibited.CUSTOM LIVING5335 Winthrop AveIndianapolis IN 462204/9/20 DATE: [PRINTS TO SCALE IF PRINTED ON 24" X 36" ] DESIGNER: NIKKI SUTTONE: nikki@customlivingusa.comC: 317.370.0638GENERAL M.E.P NOTES HVAC Contractor is responsible for engineering calculation necessary for correct sizing of new equipment and ductwork being supplied, fabricated and installed for the project. HVAC ductwork being installed in unconditioned areas to be insulated and sealed per current Building Code Standards. HVAC contractor to start up, test and balance new equipment and ductwork to assure proper operation of new systems. Final plumbing materials selected may have an affect on the final Plumbing Material and Installation Budgets. Owners understand that if additional plumbing, electrical or ductwork is found in walls being deleted that is not included on the plans there will be a Change Order during construction to relocate as necessary. Owners understand that during mechanical rough-ins there will be times when the water service will be shut of to areas in the home. Plumbing and Lighting fixtures supplied by Owner will not be Warrantied by Custom Living Plumbing and Lighting fixtures supplied by Owner must be selected and onsite prior to start of Mechanical Rough-In's PROPOSED BASEMENT MEP PLAN SCALE: 1/4" = 1' PROPOSED FIRST FLOOR MEP PLAN SCALE: 1/4" = 1' REV 1 04.09.2020 04/09/20 Adam Schriner