HomeMy WebLinkAboutM100.0CEILING
WALL
FLOOR
T
COLD AIR RETURN
HVAC KEY
FLOOR SUPPLY REGISTER
WALL SUPPLY REGISTER
CEILING SUPPLY REGISTER
EXTERIOR WALL EXHAUST VENT
THERMOSTAT
DRYER BOX
G
W
GAS SHUT-OFF KEY
PLUMBING KEY
MAIN WATER SHUT-OFF
ICE MAKER BOX
LAUNDRY BOX
FROST PROOF HOSE BIB
CLEAN OUT
TILE-IN DRAIN
FLOOR DRAIN
ELECTRICAL KEY
REF. OUTLET
MICRO.OUTLET
DW POWER SUPPLY
HOOD VENT POWER SUPPLY
GB POWER SUPPLY
DIMMER SWITCH
SURFACE MOUNT LIGHT FIXTURE
6" RECESSED CAN LIGHT
4" RECESSED CAN LIGHT
6" RECESSED CAN/FAN UNIT
EXHAUST FAN ONLY
EXHAUST FAN W/ LIGHT
WALL MOUNTED SCONCE / LIGHT
CEILING FAN
LOW VOLTAGE LIGHT
SMOKE DETECTOR
MOTION SENSOR
CEILING SPEAKER
LOW VOLTAGE LIGHTING SWITCH
GARBAGE DISPOSAL SWITCH
COUNTERTOP AIR SWITCH
SINGLE POLE SWITCH
LOW VOLTAGE TRANSFORMER
220/240V OUTLET
EXTERIOR OUTLET
GFCI OUTLET
110V OUTLET
GAS COOKTOP
CLOTHS DRYER OUTLET
4-WAY SWITCH
3-WAY SWITCH
NNS
S
S
S
S
S
S
S
S
S
S
S
S
S
SSS
S WHWH WH
UP
UP
SUMP
PIT
EJECTOR
PIT
SUMP
PIT
H / ACH / AC H / AC H / ACH / AC H / AC H / AC H / AC H / AC H / ACH / AC H / AC H / AC H / AC H / AC H / ACH / ACH / AC H / AC H / AC H / AC H / AC H / AC H / AC H / AC
H / AC H / AC
H / ACH / ACH / AC H / AC H / AC H / AC
H / ACH / ACE / L
E / LE / L E / L E / L E / L E / L E / L E / L E / L E / LE / LE / L P / LP / LP / LP / L P / L P / L EP
EP
EP
EP
EP
GFI
GFI
1 5'-4 7/8"13'-7 1/4"3'-0 1/2"1'
1 9'-1 1 "
E1
E1 LINEDRAINGAME ROOM
STORAGE
UTILITY
FINISHED
EXISTING GAME
ROOMBAR McCaw Residence
Basement Ceiling Plan
Scale: 1/4" = 1'-0"
03.16.2020
E2E2
SUMP
DRAIN
AIR
RETURN
BAYS
BATH SUMP
DRAIN
P7P7UTILITY
E1E1
UTILITY
P8P8
P4P4
P1P1
P9P9
FITNESS
UP
UP
T CW CD
GFI
GFI
GFIGFI GFI
R4
POWDER BATH
CE
BEDROOM
CLOSET
VANITY
BATH
BATH
NEW DINING ROOM
HALL
STORAGE
BUTLER 'S PANTRY ELECTRICALMETERP8P8P8P8
P2P2P3P3P5P5
P4P4
P6P6
WASHER DRYER
E3E3
E4E4
E5E5 E5E5
PASSAGE
McCaw Residence
First Floor Plan
Scale: 1/4" = 1'-0"
03.25.2020
E6E6 E6E6
REV 1 REV 1
REV 1
REV 1
REV 1
PLUMBING PLAN NOTES
INSTALL TOILET
INSTALL TOILET AND CONNECT BIDET SEAT ATTACHMENT
INSTALL SHOWER DRAIN FOR 0 THRESHOLD WEDI SYSTEM
INSTALL WALL-MOUNTED SHOWER HEAD AND TEMPERATURE CONTROL
VALVE
INSTALL SHOWER WAND AND TEMPERATURE CONTROL VALVE
INSTALL WASHING MACHINE AND STEAM DRYER
CONNECT SUMP PUMP DRAINS WITH A Y CONNECTOR OUTSIDE OF
FOUNDATION WALLS
INSTALL FAUCET AND HOOK-UP SINK DRAIN AND FAUCET WATER
CONNECTIONS
INSTALL A BATTERY BACK UP FOR EACH SUMP PIT
P1P1
P2P2
P3P3
P4P4
P5P5
P6P6
P7P7
P8P8
P9P9
P1P1
P2P2
P3P3
P4P4
P5P5
P6P6
P7P7
P8P8
P9P9
McCAW RESIDENCEMaster Suite Addition11007 Crooked Stick LaneCarmel, IN 46032Date:Revision:
6
SHEET OF 14
SIGNATURE / SEAL
Client Initials:
Date:
The plans, including all text, drawings, concept, and ideas forming a part of the plans and the selection and
arrangement thereof are Copyright 2018 by Custom Living Inc. Indianapolis, Indiana. ALL RIGHTS
RESERVED. The plans shall remain the property of Custom Living Inc. Any use of the plans or their
content without the prior written permission of Custom Living Inc. is strictly prohibited.CUSTOM LIVING5335 Winthrop AveIndianapolis IN 462204/9/20
DATE:
[PRINTS TO SCALE IF PRINTED ON 24" X 36" ] DESIGNER: NIKKI SUTTONE: nikki@customlivingusa.comC: 317.370.0638GENERAL M.E.P NOTES
HVAC Contractor is responsible for engineering calculation necessary for correct
sizing of new equipment and ductwork being supplied, fabricated and installed
for the project.
HVAC ductwork being installed in unconditioned areas to be insulated and
sealed per current Building Code Standards.
HVAC contractor to start up, test and balance new equipment and ductwork to
assure proper operation of new systems.
Final plumbing materials selected may have an affect on the final Plumbing
Material and Installation Budgets.
Owners understand that if additional plumbing, electrical or ductwork is found in
walls being deleted that is not included on the plans there will be a Change
Order during construction to relocate as necessary.
Owners understand that during mechanical rough-ins there will be times when
the water service will be shut of to areas in the home.
Plumbing and Lighting fixtures supplied by Owner will not be Warrantied by
Custom Living
Plumbing and Lighting fixtures supplied by Owner must be selected and onsite
prior to start of Mechanical Rough-In's
PROPOSED BASEMENT MEP PLAN
SCALE: 1/4" = 1'
PROPOSED FIRST FLOOR MEP PLAN
SCALE: 1/4" = 1'