Loading...
HomeMy WebLinkAboutGN010.0EXISTING 2X4 FRAMING DEMOLITION & FRAMING KEY NO DEMO IN THIS ROOM EXISTING 2X6 FRAMING WALL SECTION TO BE REMOVED NEW 2x4 FRAMING NEW 2X6 FRAMING BULK HEAD / LOWERED CEILING 3068 3068 30682668 26682668 2068 206870682468 2668 6068 WALL WALLWALLWALLWALLWALL WALLWALL 19'-11 1/2" 1'-11 1/2"1'-11"1'-11"3'-10"4'-5 1/8"10'-7"9'-11" 3'-2"7'-9 1/2" 2'-5" 3'-8 1/8" 10'-7"19'-10 3/8"13'-4 1/8"12'-4" 8'-9 3/4" 1'-4" 6'-6"7'-11"2'-3"2'-1"3'-2"7'-8"4'-5 1/2"2'-11" 6'-4 5/8" 2'-11 7/8"10'-0 1/2"19'-3 1/2"1'-7 1/2"5'-6 1/2"5'-3 7/8"4'-0 1/2"3'-10 1/2"7'-11"4'-11 1/8"BASEMENT D1D1 DEMO PLAN NOTES SEE STRUCTURAL ENGINEER ATTACHMENT FOR SYSTEM DETAILS MOVE LOCATION OF HVAC VENTS ELECTRICIAN TO MOVE ALL APPROPRIATE OUTLET, SWITCH AND SCONCE LOCATIONS D1D1 D2D2 D3D3 D1D1 D2D2 D3D3 D2D2 D3D3 EXISTING/DEMO PLAN SCALE: 1/2" = 1'Nieman's ResidenceInterior Remodel1603 Springmill Ponds CircleCarmel, IN 46032Date:Revision: 2 SHEET OF 11 SIGNATURE / SEAL Client Initials: Date: The plans, including all text, drawings, concepts and ideas, forming a part of the plans, and the selection and arrangement thereof Copright 2018 by Custom Living, Inc., Indianapolis IN. ALL RIGHTS RESERVED. The plans shall remain the property of Custom Living Inc. Any use of the plans, or their content, without the prior written permission of Custom Living. Inc is strictly prohibited. CUSTOM LIVING5335 Winthrop AveIndianapolis IN 462204/9/2020 DATE: GENERAL SITE PREP & DEMO NOTES Install plastic to seal off areas being remodeled from rest of home as necessary. Install floor covering for construction path from door designated as the construction entrance to locations of remodeling as necessary. Install additional floor covering or wall protection as needed over areas close to the areas of construction activity. Install dust control measures on HVAC cold air returns located within the locations of remodeling. Custom Living can provide a HEPA Air Scrubber to aid in airborne dust control from the start of demolition up to priming of new drywall depending on site conditions, Homeowner understands that this will help to reduce airborne dust; however, it will still not mitigate it in its entirety. Demolition Contractor(s) are responsible for all labor, for the scope of work specified in the drawings provided by Custom Living. Homeowner understands that Custom Living has only provided a labor and material allowance for the scope of Demolition denoted on the drawings, Any additional scope added or uncovered during demolition will be a Change Order during construction. Homeowners understand that Decmolition work will generate dust and noise throughout the house, Custom Living will provide site protection measures to reduce where possible, but Homeowners should not expect 100% containment. [PRINTS TO SCALE IF PRINTED ON 24" X 36" ] DESIGNER: EMMA MAXWELLE: emma@customlivingusa.comC: 574.292.2441PLUMBING STACK 04/29/20 Mike Sheeks