HomeMy WebLinkAboutGN010.0EXISTING 2X4 FRAMING
DEMOLITION & FRAMING KEY
NO DEMO IN THIS ROOM
EXISTING 2X6 FRAMING
WALL SECTION TO BE REMOVED
NEW 2x4 FRAMING
NEW 2X6 FRAMING
BULK HEAD / LOWERED CEILING
3068
3068
30682668
26682668
2068 206870682468 2668 6068 WALL WALLWALLWALLWALLWALL
WALLWALL
19'-11 1/2"
1'-11 1/2"1'-11"1'-11"3'-10"4'-5 1/8"10'-7"9'-11" 3'-2"7'-9 1/2"
2'-5"
3'-8 1/8"
10'-7"19'-10 3/8"13'-4 1/8"12'-4"
8'-9 3/4"
1'-4"
6'-6"7'-11"2'-3"2'-1"3'-2"7'-8"4'-5 1/2"2'-11"
6'-4 5/8"
2'-11 7/8"10'-0 1/2"19'-3 1/2"1'-7 1/2"5'-6 1/2"5'-3 7/8"4'-0 1/2"3'-10 1/2"7'-11"4'-11 1/8"BASEMENT
D1D1
DEMO PLAN NOTES
SEE STRUCTURAL ENGINEER ATTACHMENT FOR SYSTEM DETAILS
MOVE LOCATION OF HVAC VENTS
ELECTRICIAN TO MOVE ALL APPROPRIATE OUTLET, SWITCH AND SCONCE LOCATIONS
D1D1
D2D2
D3D3
D1D1
D2D2
D3D3
D2D2
D3D3
EXISTING/DEMO PLAN
SCALE: 1/2" = 1'Nieman's ResidenceInterior Remodel1603 Springmill Ponds CircleCarmel, IN 46032Date:Revision:
2
SHEET OF 11
SIGNATURE / SEAL
Client Initials:
Date:
The plans, including all text, drawings, concepts and ideas,
forming a part of the plans, and the selection and arrangement
thereof Copright 2018 by Custom Living, Inc., Indianapolis IN.
ALL RIGHTS RESERVED. The plans shall remain the property of
Custom Living Inc. Any use of the plans, or their content, without
the prior written permission of Custom Living. Inc is strictly
prohibited. CUSTOM LIVING5335 Winthrop AveIndianapolis IN 462204/9/2020
DATE:
GENERAL SITE PREP & DEMO NOTES
Install plastic to seal off areas being remodeled
from rest of home as necessary.
Install floor covering for construction path from
door designated as the construction entrance to
locations of remodeling as necessary.
Install additional floor covering or wall protection
as needed over areas close to the areas of
construction activity.
Install dust control measures on HVAC cold air
returns located within the locations of
remodeling.
Custom Living can provide a HEPA Air Scrubber
to aid in airborne dust control from the start of
demolition up to priming of new drywall
depending on site conditions, Homeowner
understands that this will help to reduce airborne
dust; however, it will still not mitigate it in its
entirety.
Demolition Contractor(s) are responsible for all
labor, for the scope of work specified in the
drawings provided by Custom Living.
Homeowner understands that Custom Living has
only provided a labor and material allowance for
the scope of Demolition denoted on the
drawings, Any additional scope added or
uncovered during demolition will be a Change
Order during construction.
Homeowners understand that Decmolition work
will generate dust and noise throughout the
house, Custom Living will provide site protection
measures to reduce where possible, but
Homeowners should not expect 100%
containment.
[PRINTS TO SCALE IF PRINTED ON 24" X 36" ] DESIGNER: EMMA MAXWELLE: emma@customlivingusa.comC: 574.292.2441PLUMBING
STACK
04/29/20
Mike Sheeks