HomeMy WebLinkAboutC801 UTILITY PLAN DETAILS (V2)(2) "B" BORROW OR EQUIV.
GRANULAR MATERIAL
COMPACTED TO 95%
STANDARD PROCTOR DENSITY
#8 CRUSHED STONE OR
APPROVED EQUIVALENT
CLASS I BEDDING MATERIAL
HAND TAMPED OR WALKED
INTO PLACE
TYPICAL BEDDING SECTION - PVC & HDPE
ALL BEDDING & INITIAL BACKFILL SHALL
BE INSTALLED IN 6" TO 12" BALANCED
LIFTS A MIN. 9" CLEARANCE SHALL BE
PROVIDED ON EACH SIDE OF THE
INSTALLED PIPE
Bc = OUTSIDE DIAMETER
D = INSIDE DIAMETER
D = DEPTH OF BEDDING
MATERIAL BELOW PIPE
(1) REGULAR BACKFILL
GREATER THAN 5' (1)
EDGE OF PAVEMENT,
CURB, GUTTER OR
SIMILAR STRUCTURE IN
THE PUBLIC
RIGHT-OF-WAY
MIN. 6" TOPSOIL TO ENSURE
GRASS GROWTH IF NOT UNDER
PAVEMENT
12" MIN.Bc
C801UTILITY PLAN DETAILSW190582-C801 util det(NO SCALE)4"REVISIONS AND ISSUESPart of Section 36, Township 18 North, Range 3 East, Hamilton County, IndianaW19.0582PREPARED FOR:147 & 155 WEST CARMEL DRIVE, CARMEL, INDIANAPROJECT NO.
SHEET NO.CHECKED BY:DRAWN BY:SSRDESIGNED BY:DWG NAME:PROJECT NO.:W19.0582DATEBY03.30.2020SSRDATE:SSRAPPROVAL PENDINGNOT FOR CONSTRUCTIONCARMEL SELF STORAGEISSUED FOR CITY REVIEW01.13.2020BJSENGINEERS317 | 846 - 6611800 | 452 - 6408317 | 843 - 0546 faxWEIHELand Surveying | Civil EngineeringLandscape ArchitectureALLAN H. WEIHE, P.E., L.S. - FOUNDER10505 N. College AvenueIndianapolis, Indiana 46280weihe.netBuild with confidence.SMSTEVEN SCOTT RUCKER, PE No. 11300279
03/30/2020TAC REVISIONS03.30.2020BJS