HomeMy WebLinkAboutDrainage Report (V2) 03-24-20STORMWATER TECHNICAL REPORT
For: CARMEL SELF STORAGE CENTER
Approximately 4.3 acres
147 & 155 West Carmel Drive
Part of SE/4, Section 36, Township 18 North, Range 3 East, Clay Township, Hamilton County, IN
Project W190582
Prepared For:
Jim Adams
Adams French Property, LLC
9000 Keystone Crossing, Suite 660
Indianapolis, IN 46240
Phone: (317) 733-640
jadams@filcoltd.com
Prepared By: Russell L. Webster II, P.E.
Checked By: Brad Schoeff
Certified By: Russell L. Webster II, P.E.
Date:
December 17, 2019
Revised:
10505 North College Avenue | Indianapolis, IN 46280 | .www.weihe.net | (317) 846-6611 | (800) 452-6408 | Fax: (317) 843-0546
Allan H. Weihe, P.E., L.S., - Founder
March 24, 2020
Prepared For:
Stormwater Technical Report
Carmel Self Storage Center
Carmel, IN
Project #W190582
TABLE OF CONTENTS
1. Project Narrative
• Existing Conditions
• Proposed Conditions
• Water Quality
• Location Maps
2. Pre-Developed Calculations
• Basin Map
3. Post-Developed Calculations
• Basin Map
• Supporting Calculations
• Drainage Model
4. Water Quality Calculations
• Location Map
• Supporting Calculations
5. Storm Sewer Sizing
• Figures
• Calculations
Section 1
Carmel Self Storage Center Drainage Report Weihe Engineers, INC.
3/24/2020
Report Prepared For:
Carmel Self Storage Center
Carmel, IN
Project #w190582
Project Narrative and Stormwater Design:
Carmel Self Storage is proposing to demolish and reconstruct their existing building on their site
on West Carmel Drive. The proposed building will be a better match for the current architectural
requirements in the area and will bring the new building closer to the right-of-way.
The stormwater design for this project is challenging. The site is 95% impervious today and has
been since approximately 1980 when the site was built-out fully. The outlet pipe for the site is
one 12” storm sewer which handles onsite flows and underdrains from onsite and offsite. Said
outlet pipe is less than 3’ deep. Because the site is fully built-out, there is minimal room to
consider detention and water quality. However, disturbing more than 0.25 acres triggers these
requirements per the UDO.
The owner is removing and replacing the north office and storage building but will not be
removing any self-storage buildings. Most of the southern part of the site containing these self-
storage buildings sheet flow to the west towards the existing outlet pipe. The owner understands
there is not adequate elevation to rip out pavement and install underground detention, nor will
they remove any of the existing storage buildings to provide detention.
However, the owner will remove asphalt to accommodate as much detention as the western edge
of the site will allow. This area will not provide enough detention to satisfy the UDO. The city
engineering staff has directed that we design the pond to at least accommodate detention storage
for the increased building area, which is about 0.30 acres.
The owner is willing to provide water quality for the entire site by using a water quality unit. The
owner has also selected a dry pond with native plantings for detention to incorporate green
infrastructure into the redevelopment.
Site Location:
Approximately 4.3 acres located at 147 & 155 West Carmel Drive
Part of SE/4, Section 36, Township 18 North, Range 3 East, Clay Township, Hamilton County, IN
Floodzone:
The site does not lie in a Special Flood Hazard Area as established by the Federal Emergency
Management Agency - National Flood Insurance Program, when plotted by scale on Flood
Insurance Rate Map #18057C0209 G, dated November 19, 2014.
Carmel Self Storage Center Drainage Report Weihe Engineers, INC.
3/24/2020
Existing Conditions:
The site is 95% buildings or hard surface. There are a series of self-storage buildings on the
southern half of the site. The site topography was generated from survey performed by Weihe
Engineers. Refer to Section 2 for the existing site map.
Allowable Release Rates:
As advised by the staff, the allowable release rates for this detention pond are based on the
acreage of the increased building area created by the larger building. This comes to 0.30 acres.
The allowable release rates for this orifice of the pond are therefore:
10-year 0.1 x 0.30 = 0.03 cfs
100-year 0.03 x 0.30 = 0.09 cfs
Proposed Conditions:
As stated above, the proposed condition will provide a dry detention pond to manage onsite
runoff. The onsite runoff is 95% hard surface and has a curve number of 98. A Tc was calculated
using the TR-55 method. Since the contributing acreage is less than 5 acres, the Modified
Rational Method was used to design the pond. Refer to Sections 3 and 4 for design information
and calculations. The outlet control structure will utilize multiple orifices to manage both the
detention and the bypass runoff rates. The portion of the site that cannot be routed to the pond
will sheet flow the way it does today, eventually entering the storm sewer downstream of the
pond.
The following is a summary of the onsite runoff, with 0.30 acres of new building being detained.
Detained Release Rate Bypass Release Rate Site Remainder
2-year 0.02 cfs 1.65 cfs 6.30 cfs
10-year 0.03 cfs 2.13 cfs 8.32 cfs
100-year 0.07 cfs 3.39 cfs 12.40 cfs
Water Quality Measures:
The proposed redevelopment will include water quality measures for the 3.86 acres contributing
to the existing outlet. The proposal includes a Hydro International First Defense High Capacity
8’ mechanical water quality unit. Refer to Section 4 of this report for calculations and figures.
The plan will also utilize a BMP Dry Pond with Native Plantings.
Storm Sewers:
To accommodate proposed drainage patterns, and address issues related to raising the finished
floor of the proposed building, a run of storm sewer shall be installed. The storm sewer will
collect water from a proposed trench drain and proposed roof drains. Said storm sewer has been
sized for the 10-year design storm for capacity and to keep the hydraulic grade line below the
crowns of the pipes. Refer to Section 5 of this report.
LOCATION MAP – NO SCALE
DENOTES PROJECT LOCATION
6
Custom Soil Resource Report
Soil Map
4423630442366044236904423720442375044237804423810442384044236304423660442369044237204423750442378044238104423840574170 574200 574230 574260 574290 574320 574350 574380 574410 574440 574470 574500
574170 574200 574230 574260 574290 574320 574350 574380 574410 574440 574470 574500
39° 57' 41'' N 86° 7' 54'' W39° 57' 41'' N86° 7' 39'' W39° 57' 33'' N
86° 7' 54'' W39° 57' 33'' N
86° 7' 39'' WN
Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 16N WGS84
0 50 100 200 300
Feet
0 20 40 80 120
Meters
Map Scale: 1:1,650 if printed on A landscape (11" x 8.5") sheet.
Soil Map may not be valid at this scale.
MAP LEGEND MAP INFORMATION
Area of Interest (AOI)
Area of Interest (AOI)
Soils
Soil Map Unit Polygons
Soil Map Unit Lines
Soil Map Unit Points
Special Point Features
Blowout
Borrow Pit
Clay Spot
Closed Depression
Gravel Pit
Gravelly Spot
Landfill
Lava Flow
Marsh or swamp
Mine or Quarry
Miscellaneous Water
Perennial Water
Rock Outcrop
Saline Spot
Sandy Spot
Severely Eroded Spot
Sinkhole
Slide or Slip
Sodic Spot
Spoil Area
Stony Spot
Very Stony Spot
Wet Spot
Other
Special Line Features
Water Features
Streams and Canals
Transportation
Rails
Interstate Highways
US Routes
Major Roads
Local Roads
Background
Aerial Photography
The soil surveys that comprise your AOI were mapped at
1:15,800.
Warning: Soil Map may not be valid at this scale.
Enlargement of maps beyond the scale of mapping can cause
misunderstanding of the detail of mapping and accuracy of soil
line placement. The maps do not show the small areas of
contrasting soils that could have been shown at a more detailed
scale.
Please rely on the bar scale on each map sheet for map
measurements.
Source of Map: Natural Resources Conservation Service
Web Soil Survey URL:
Coordinate System: Web Mercator (EPSG:3857)
Maps from the Web Soil Survey are based on the Web Mercator
projection, which preserves direction and shape but distorts
distance and area. A projection that preserves area, such as the
Albers equal-area conic projection, should be used if more
accurate calculations of distance or area are required.
This product is generated from the USDA-NRCS certified data as
of the version date(s) listed below.
Soil Survey Area: Hamilton County, Indiana
Survey Area Data: Version 20, Sep 16, 2019
Soil map units are labeled (as space allows) for map scales
1:50,000 or larger.
Date(s) aerial images were photographed: Aug 1, 2018—Sep
30, 2018
The orthophoto or other base map on which the soil lines were
compiled and digitized probably differs from the background
imagery displayed on these maps. As a result, some minor
shifting of map unit boundaries may be evident.
Custom Soil Resource Report
7
Map Unit Legend
Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI
UbaA Urban land-Brookston complex,
0 to 2 percent slopes
2.2 43.8%
UcfA Urban land-Crosby silt loam
complex, fine-loamy subsoil,
0 to 2 percent slopes
1.2 23.4%
UkbB2 Urban land-Miami silt loam
complex, 2 to 6 percent
slopes, eroded
1.4 27.7%
YbvA Brookston silty clay loam-Urban
land complex, 0 to 2 percent
slopes
0.1 2.5%
YmsB2 Miami silt loam-Urban land
complex, 2 to 6 percent
slopes, eroded
0.1 2.5%
Totals for Area of Interest 5.1 100.0%
Map Unit Descriptions
The map units delineated on the detailed soil maps in a soil survey represent the
soils or miscellaneous areas in the survey area. The map unit descriptions, along
with the maps, can be used to determine the composition and properties of a unit.
A map unit delineation on a soil map represents an area dominated by one or more
major kinds of soil or miscellaneous areas. A map unit is identified and named
according to the taxonomic classification of the dominant soils. Within a taxonomic
class there are precisely defined limits for the properties of the soils. On the
landscape, however, the soils are natural phenomena, and they have the
characteristic variability of all natural phenomena. Thus, the range of some
observed properties may extend beyond the limits defined for a taxonomic class.
Areas of soils of a single taxonomic class rarely, if ever, can be mapped without
including areas of other taxonomic classes. Consequently, every map unit is made
up of the soils or miscellaneous areas for which it is named and some minor
components that belong to taxonomic classes other than those of the major soils.
Most minor soils have properties similar to those of the dominant soil or soils in the
map unit, and thus they do not affect use and management. These are called
noncontrasting, or similar, components. They may or may not be mentioned in a
particular map unit description. Other minor components, however, have properties
and behavioral characteristics divergent enough to affect use or to require different
management. These are called contrasting, or dissimilar, components. They
generally are in small areas and could not be mapped separately because of the
scale used. Some small areas of strongly contrasting soils or miscellaneous areas
are identified by a special symbol on the maps. If included in the database for a
given area, the contrasting minor components are identified in the map unit
descriptions along with some characteristics of each. A few areas of minor
Custom Soil Resource Report
8
components may not have been observed, and consequently they are not
mentioned in the descriptions, especially where the pattern was so complex that it
was impractical to make enough observations to identify all the soils and
miscellaneous areas on the landscape.
The presence of minor components in a map unit in no way diminishes the
usefulness or accuracy of the data. The objective of mapping is not to delineate
pure taxonomic classes but rather to separate the landscape into landforms or
landform segments that have similar use and management requirements. The
delineation of such segments on the map provides sufficient information for the
development of resource plans. If intensive use of small areas is planned, however,
onsite investigation is needed to define and locate the soils and miscellaneous
areas.
An identifying symbol precedes the map unit name in the map unit descriptions.
Each description includes general facts about the unit and gives important soil
properties and qualities.
Soils that have profiles that are almost alike make up a soil series. Except for
differences in texture of the surface layer, all the soils of a series have major
horizons that are similar in composition, thickness, and arrangement.
Soils of one series can differ in texture of the surface layer, slope, stoniness,
salinity, degree of erosion, and other characteristics that affect their use. On the
basis of such differences, a soil series is divided into soil phases. Most of the areas
shown on the detailed soil maps are phases of soil series. The name of a soil phase
commonly indicates a feature that affects use or management. For example, Alpha
silt loam, 0 to 2 percent slopes, is a phase of the Alpha series.
Some map units are made up of two or more major soils or miscellaneous areas.
These map units are complexes, associations, or undifferentiated groups.
A complex consists of two or more soils or miscellaneous areas in such an intricate
pattern or in such small areas that they cannot be shown separately on the maps.
The pattern and proportion of the soils or miscellaneous areas are somewhat similar
in all areas. Alpha-Beta complex, 0 to 6 percent slopes, is an example.
An association is made up of two or more geographically associated soils or
miscellaneous areas that are shown as one unit on the maps. Because of present
or anticipated uses of the map units in the survey area, it was not considered
practical or necessary to map the soils or miscellaneous areas separately. The
pattern and relative proportion of the soils or miscellaneous areas are somewhat
similar. Alpha-Beta association, 0 to 2 percent slopes, is an example.
An undifferentiated group is made up of two or more soils or miscellaneous areas
that could be mapped individually but are mapped as one unit because similar
interpretations can be made for use and management. The pattern and proportion
of the soils or miscellaneous areas in a mapped area are not uniform. An area can
be made up of only one of the major soils or miscellaneous areas, or it can be made
up of all of them. Alpha and Beta soils, 0 to 2 percent slopes, is an example.
Some surveys include miscellaneous areas. Such areas have little or no soil
material and support little or no vegetation. Rock outcrop is an example.
Custom Soil Resource Report
9
20
Custom Soil Resource Report
Map—Hydrologic Soil Group
4423630442366044236904423720442375044237804423810442384044236304423660442369044237204423750442378044238104423840574170 574200 574230 574260 574290 574320 574350 574380 574410 574440 574470 574500
574170 574200 574230 574260 574290 574320 574350 574380 574410 574440 574470 574500
39° 57' 41'' N 86° 7' 54'' W39° 57' 41'' N86° 7' 39'' W39° 57' 33'' N
86° 7' 54'' W39° 57' 33'' N
86° 7' 39'' WN
Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 16N WGS84
0 50 100 200 300
Feet
0 20 40 80 120
Meters
Map Scale: 1:1,650 if printed on A landscape (11" x 8.5") sheet.
Soil Map may not be valid at this scale.
MAP LEGEND MAP INFORMATION
Area of Interest (AOI)
Area of Interest (AOI)
Soils
Soil Rating Polygons
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Soil Rating Lines
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Soil Rating Points
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Water Features
Streams and Canals
Transportation
Rails
Interstate Highways
US Routes
Major Roads
Local Roads
Background
Aerial Photography
The soil surveys that comprise your AOI were mapped at
1:15,800.
Warning: Soil Map may not be valid at this scale.
Enlargement of maps beyond the scale of mapping can cause
misunderstanding of the detail of mapping and accuracy of soil
line placement. The maps do not show the small areas of
contrasting soils that could have been shown at a more detailed
scale.
Please rely on the bar scale on each map sheet for map
measurements.
Source of Map: Natural Resources Conservation Service
Web Soil Survey URL:
Coordinate System: Web Mercator (EPSG:3857)
Maps from the Web Soil Survey are based on the Web Mercator
projection, which preserves direction and shape but distorts
distance and area. A projection that preserves area, such as the
Albers equal-area conic projection, should be used if more
accurate calculations of distance or area are required.
This product is generated from the USDA-NRCS certified data as
of the version date(s) listed below.
Soil Survey Area: Hamilton County, Indiana
Survey Area Data: Version 20, Sep 16, 2019
Soil map units are labeled (as space allows) for map scales
1:50,000 or larger.
Date(s) aerial images were photographed: Aug 1, 2018—Sep
30, 2018
The orthophoto or other base map on which the soil lines were
compiled and digitized probably differs from the background
imagery displayed on these maps. As a result, some minor
shifting of map unit boundaries may be evident.
Custom Soil Resource Report
21
Table—Hydrologic Soil Group
Map unit symbol Map unit name Rating Acres in AOI Percent of AOI
UbaA Urban land-Brookston
complex, 0 to 2
percent slopes
2.2 43.8%
UcfA Urban land-Crosby silt
loam complex, fine-
loamy subsoil, 0 to 2
percent slopes
1.2 23.4%
UkbB2 Urban land-Miami silt
loam complex, 2 to 6
percent slopes, eroded
1.4 27.7%
YbvA Brookston silty clay
loam-Urban land
complex, 0 to 2
percent slopes
B/D 0.1 2.5%
YmsB2 Miami silt loam-Urban
land complex, 2 to 6
percent slopes, eroded
C 0.1 2.5%
Totals for Area of Interest 5.1 100.0%
Rating Options—Hydrologic Soil Group
Aggregation Method: Dominant Condition
Component Percent Cutoff: None Specified
Tie-break Rule: Higher
Custom Soil Resource Report
22
Section 2
Section 3
Project:
Date:
Source: 210‐VI‐TR‐55 Second Ed, June 1986 Job No:
Checked By:
Prepared By:
BASIN:
Sheet Flow (Applicable to Tc only)Segment ID
1. Surface Description ………………… Imperv.
2. Manning's roughness coeff., n ……….. 0.011
3. Flow length, L (total L < 300 ft) ……….ft 30
4. Two-yr 24-hr rainfall, P2 ……………..in 2.64
5. Land slope, s ……………………… ft/ft 0.01
6. Tt = 0.007 (nL)0.8 Compute Tt …hr 0.0112 = 0.0112
P2
0.5 s0.4
Shallow Concentrated Flow Segment ID Gutter
7. Surface Description (paved or unpaved) … Paved
8. Flow length, L ………………………. ft 900
9. Watercourse slope, s ……………….. ft/ft 0.005
10. Average velocity, V …………………. ft/s 2.03
11. Tt = L Compute Tt …hr 0.1230 = 0.1230
3600 V
Channel Flow Segment ID
12. Cross sectional flow area, a …………..ft2
13. Wetted Perimeter, pw …………………ft
14. Hydraulic radius, r = a/pw Compute r … ft
15. Channel slope, s ……………………. ft/ft
16. Manning's roughness coeff., n …………
17. V = (1.49 r2/3 s1/2) / n Compute V … ft/s
18. Flow length, L ………………………. ft
19. Tt = L Compute Tt …hr = 0.0000
3600 V
20. Watershed or subarea Tc or Tt (add Tt in steps 6, 11, and 19) ………………………hr 0.1342
min 8.05
Time of Concentration Carmel Self Storage
December 16, 2019
w190582
Tc
BS
RLW
Project:Carmel Self StorageDate:March 20, 2020Job No:w190582Checked By:SSRPrepared By:RLWC=0.60Release Summary0.9" Orifice @ 824.50 Elevations h(ft) Q(cfs) Stage(ft) Bypass(cfs) Detained Release (cfs) Total Released(cfs)2-year 825.58 1.08 0.02 2-year 825.58 1.65 0.02 1.67A=0.00442 ft2 10-year 825.88 1.38 0.03 10-year 825.88 2.13 0.03 2.16100-year 827.42 2.92 0.04 100-year 827.42 3.39 0.07 3.461" Orifice @ 825.90 Elevations h(ft) Q(cfs)2-year 825.58A=0.00545 ft2 10-year 825.88100-year 827.42 1.52 0.03Release Rate Calculations for Detentionܳൌܥܣ2݄݃
123 4
5
6
1
Watershed Model SchematicHydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2
Project: H:\2019\W190582\Engineering\design\drainage\pond modeling\w190582 proposed BYPASS INCLUDED.gpwFriday, 03 / 20 / 2020
Pond Report 10
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Friday, 03 / 20 / 2020
Pond No. 1 - Pond 1
Pond Data
Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 824.50 ft
Stage / Storage Table
Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft)
0.00 824.50 00 0 0
0.50 825.00 560 93 93
1.50 826.00 1,561 1,019 1,112
2.50 827.00 2,039 1,795 2,906
3.50 828.00 4,437 3,161 6,067
Culvert / Orifice Structures Weir Structures
[A] [B] [C] [PrfRsr] [A] [B] [C] [D]
Rise (in)= 0.90 1.00 9.00 0.00
Span (in)= 0.90 1.00 9.00 0.00
No. Barrels = 1 110
Invert El. (ft)= 824.50 825.90 824.50 0.00
Length (ft)= 1.00 1.00 5.00 0.00
Slope (%)= 1.00 1.00 1.00 n/a
N-Value = .013 .013 .013 n/a
Orifice Coeff.= 0.60 0.60 0.60 0.60
Multi-Stage = n/a NoNoNo
Crest Len (ft)= 0.00 0.00 0.00 0.00
Crest El. (ft)= 0.00 0.00 0.00 0.00
Weir Coeff.= 3.33 3.33 3.33 3.33
Weir Type = --- --- --- ---
Multi-Stage = No No No No
Exfil.(in/hr)= 0.000 (by Contour)
TW Elev. (ft)= 0.00
Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s).
Stage / Storage / Discharge Table
Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total
ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs
0.00 0 824.50 0.00 0.00 0.00 --- --- --- --- --- --- --- 0.000
0.50 93 825.00 0.01 ic 0.00 0.43 oc --- --- --- --- --- --- --- 0.447
1.50 1,112 826.00 0.03 ic 0.00 oc 2.26 ic --- --- --- --- --- --- --- 2.286
2.50 2,906 827.00 0.03 ic 0.03 ic 3.10 ic --- --- --- --- --- --- --- 3.161
3.50 6,067 828.00 0.04 ic 0.04 ic 3.76 ic --- --- --- --- --- --- --- 3.837
Hydrograph Summary Report
3
Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph
No. type flow interval Peak volume hyd(s) elevation strge used Description
(origin) (cfs) (min) (min) (cuft) (ft) (cuft)
1 Mod. Rational 0.275 1 5 1,635 ------ ------ ------ 303-N
2 Mod. Rational 0.228 1 6 1,627 ------ ------ ------ 304
3 Mod. Rational 0.132 1 6 944 ------ ------ ------ 303-O
4 Mod. Rational 1.039 1 8 8,230 ------ ------ ------ PR-SE
5 Combine 1.674 1 8 12,435 1, 2, 3,
4
------ ------ Combined Flows
6 Reservoir 1.674 1 99 12,434 5 825.58 681 Pond Outflow
H:\2019\W190582\Engineering\design\drainage\pond modeling\w190582 proposed BYPASS INCLUDED.gpwReturn Period: 2 Year Friday, 03 / 20 / 2020
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2
Hydrograph Return Period Recap
2
Hyd. Hydrograph Inflow Peak Outflow (cfs) Hydrograph
No. type hyd(s)Description
(origin) 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr
1 Mod. Rational ------ ------- 0.275 ------- ------- 0.362 ------- ------- 0.542 303-N
2 Mod. Rational ------ ------- 0.228 ------- ------- 0.299 ------- ------- 0.466 304
3 Mod. Rational ------ ------- 0.132 ------- ------- 0.174 ------- ------- 0.265 303-O
4 Mod. Rational ------ ------- 1.039 ------- ------- 1.326 ------- ------- 2.457 PR-SE
5 Combine 1, 2, 3,
4
------- 1.674 ------- ------- 2.160 ------- ------- 3.730 Combined Flows
6 Reservoir 5 ------- 1.674 ------- ------- 2.159 ------- ------- 3.460 Pond Outflow
Proj. file: H:\2019\W190582\Engineering\design\drainage\pond modeling\w190582 proposed BYPASS INCLUDED.gpwFriday, 03 / 20 / 2020
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2
Hydrograph Summary Report
11
Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph
No. type flow interval Peak volume hyd(s) elevation strge used Description
(origin) (cfs) (min) (min) (cuft) (ft) (cuft)
1 Mod. Rational 0.362 1 5 2,149 ------ ------ ------ 303-N
2 Mod. Rational 0.299 1 6 2,136 ------ ------ ------ 304
3 Mod. Rational 0.174 1 6 1,240 ------ ------ ------ 303-O
4 Mod. Rational 1.326 1 8 10,818 ------ ------ ------ PR-SE
5 Combine 2.160 1 8 16,341 1, 2, 3,
4
------ ------ Combined Flows
6 Reservoir 2.159 1 99 16,340 5 825.88 992 Pond Outflow
H:\2019\W190582\Engineering\design\drainage\pond modeling\w190582 proposed BYPASS INCLUDED.gpwReturn Period: 10 Year Friday, 03 / 20 / 2020
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2
Hydrograph Summary Report
18
Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph
No. type flow interval Peak volume hyd(s) elevation strge used Description
(origin) (cfs) (min) (min) (cuft) (ft) (cuft)
1 Mod. Rational 0.542 1 5 3,218 ------ ------ ------ 303-N
2 Mod. Rational 0.466 1 6 3,190 ------ ------ ------ 304
3 Mod. Rational 0.265 1 6 1,857 ------ ------ ------ 303-O
4 Mod. Rational 2.457 1 8 15,922 ------ ------ ------ PR-SE
5 Combine 3.730 1 8 24,187 1, 2, 3,
4
------ ------ Combined Flows
6 Reservoir 3.460 1 101 24,186 5 827.42 4,229 Pond Outflow
H:\2019\W190582\Engineering\design\drainage\pond modeling\w190582 proposed BYPASS INCLUDED.gpwReturn Period: 100 Year Friday, 03 / 20 / 2020
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2
Hydraflow Rainfall Report 25
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Friday, 03 / 20 / 2020
Return Intensity-Duration-Frequency Equation Coefficients (FHA)
Period
(Yrs) B D E (N/A)
1 0.0000 0.0000 0.0000 --------
2 241.5741 28.3001 1.1283 --------
3 0.0000 0.0000 0.0000 --------
5 287.3543 28.3001 1.1322 --------
10 337.4067 28.7001 1.1400 --------
25 0.0000 0.0000 0.0000 --------
50 0.0000 0.0000 0.0000 --------
100 463.3860 28.0001 1.1234 --------
File name: Hamilton County.IDF
Intensity = B / (Tc + D)^E
Return Intensity Values (in/hr)
Period
(Yrs)5 min1015202530354045505560
1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2 4.63 3.95 3.44 3.04 2.72 2.46 2.24 2.06 1.90 1.76 1.64 1.54
3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
5 5.43 4.63 4.03 3.56 3.19 2.88 2.62 2.41 2.22 2.06 1.92 1.80
10 6.12 5.23 4.55 4.02 3.60 3.25 2.96 2.72 2.51 2.33 2.17 2.03
25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
100 9.12 7.78 6.77 5.99 5.36 4.84 4.41 4.05 3.74 3.47 3.24 3.03
Tc = time in minutes. Values may exceed 60.
Rainfall Precipitation Table (in)
Precip. file name: H:\2018\W180787\Engineering\design\drainage\pond modeling\huff rainfall\Indy -1st Q-30min.pcp
Storm
Distribution 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr
SCS 24-hour 1.00 2.66 0.00 0.00 3.83 0.00 0.00 6.46
SCS 6-Hr 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Huff-1st 0.00 0.99 0.00 1.32 1.55 1.83 2.05 2.25
Huff-2nd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Huff-3rd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Huff-4th 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Huff-Indy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Custom 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Friday, 03 / 20 / 2020
Hyd. No. 1
303-N
Hydrograph type = Mod. Rational Peak discharge = 0.275 cfs
Storm frequency = 2 yrs Time to peak = 0.08 hrs
Time interval = 1 min Hyd. volume = 1,635 cuft
Drainage area = 0.300 ac Runoff coeff. = 0.9
Intensity = 1.019 in/hr Tc by User = 5.00 min
IDF Curve = Hamilton County.IDF Storm duration = 19.8 x Tc
Target Q =0.030 cfs Est. Req'd Storage =1,540 cuft
4
0.0 0.2 0.3 0.5 0.7 0.8 1.0 1.2 1.3 1.5 1.7 1.8
Q (cfs)
0.00 0.00
0.05 0.05
0.10 0.10
0.15 0.15
0.20 0.20
0.25 0.25
0.30 0.30
0.35 0.35
0.40 0.40
0.45 0.45
0.50 0.50
Q (cfs)
Time (hrs)
303-N
Hyd. No. 1 -- 2 Year
Hyd No. 1 Mod. Rational Est. Storage = 1,540 cuft
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Friday, 03 / 20 / 2020
Hyd. No. 2
304
Hydrograph type = Mod. Rational Peak discharge = 0.228 cfs
Storm frequency = 2 yrs Time to peak = 0.10 hrs
Time interval = 1 min Hyd. volume = 1,627 cuft
Drainage area = 0.310 ac Runoff coeff. = 0.85
Intensity = 0.864 in/hr Tc by User = 6.00 min
IDF Curve = Hamilton County.IDF Storm duration = 19.8 x Tc
Target Q =0.031 cfs Est. Req'd Storage =1,509 cuft
5
0.0 0.2 0.3 0.5 0.7 0.8 1.0 1.2 1.3 1.5 1.7 1.8 2.0 2.2
Q (cfs)
0.00 0.00
0.05 0.05
0.10 0.10
0.15 0.15
0.20 0.20
0.25 0.25
0.30 0.30
0.35 0.35
0.40 0.40
0.45 0.45
0.50 0.50
Q (cfs)
Time (hrs)
304
Hyd. No. 2 -- 2 Year
Hyd No. 2 Mod. Rational Est. Storage = 1,509 cuft
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Friday, 03 / 20 / 2020
Hyd. No. 3
303-O
Hydrograph type = Mod. Rational Peak discharge = 0.132 cfs
Storm frequency = 2 yrs Time to peak = 0.10 hrs
Time interval = 1 min Hyd. volume = 944 cuft
Drainage area = 0.170 ac Runoff coeff. = 0.9
Intensity = 0.864 in/hr Tc by User = 6.00 min
IDF Curve = Hamilton County.IDF Storm duration = 19.8 x Tc
Target Q =0.017 cfs Est. Req'd Storage =880 cuft
6
0.0 0.2 0.3 0.5 0.7 0.8 1.0 1.2 1.3 1.5 1.7 1.8 2.0 2.2
Q (cfs)
0.00 0.00
0.05 0.05
0.10 0.10
0.15 0.15
0.20 0.20
0.25 0.25
0.30 0.30
0.35 0.35
0.40 0.40
0.45 0.45
0.50 0.50
Q (cfs)
Time (hrs)
303-O
Hyd. No. 3 -- 2 Year
Hyd No. 3 Mod. Rational Est. Storage = 880 cuft
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Friday, 03 / 20 / 2020
Hyd. No. 4
PR-SE
Hydrograph type = Mod. Rational Peak discharge = 1.039 cfs
Storm frequency = 2 yrs Time to peak = 0.13 hrs
Time interval = 1 min Hyd. volume = 8,230 cuft
Drainage area = 1.520 ac Runoff coeff. = 0.87
Intensity = 0.786 in/hr Tc by User = 8.00 min
IDF Curve = Hamilton County.IDF Storm duration = 16.5 x Tc
Target Q =0.152 cfs Est. Req'd Storage =7,589 cuft
7
0.0 0.2 0.3 0.5 0.7 0.8 1.0 1.2 1.3 1.5 1.7 1.8 2.0 2.2 2.3
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
Q (cfs)
Time (hrs)
PR-SE
Hyd. No. 4 -- 2 Year
Hyd No. 4 Mod. Rational Est. Storage = 7,589 cuft
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Friday, 03 / 20 / 2020
Hyd. No. 5
Combined Flows
Hydrograph type = Combine Peak discharge = 1.674 cfs
Storm frequency = 2 yrs Time to peak = 0.13 hrs
Time interval = 1 min Hyd. volume = 12,435 cuft
Inflow hyds. = 1, 2, 3, 4 Contrib. drain. area = 2.300 ac
8
0.0 0.2 0.3 0.5 0.7 0.8 1.0 1.2 1.3 1.5 1.7 1.8 2.0 2.2 2.3
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
Q (cfs)
Time (hrs)
Combined Flows
Hyd. No. 5 -- 2 Year
Hyd No. 5 Hyd No. 1 Hyd No. 2 Hyd No. 3
Hyd No. 4
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Friday, 03 / 20 / 2020
Hyd. No. 6
Pond Outflow
Hydrograph type = Reservoir Peak discharge = 1.674 cfs
Storm frequency = 2 yrs Time to peak = 1.65 hrs
Time interval = 1 min Hyd. volume = 12,434 cuft
Inflow hyd. No. = 5 - Combined Flows Max. Elevation = 825.58 ft
Reservoir name = Pond 1 Max. Storage = 681 cuft
Storage Indication method used.
9
0.0 0.3 0.7 1.0 1.3 1.7 2.0 2.3 2.7
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
Q (cfs)
Time (hrs)
Pond Outflow
Hyd. No. 6 -- 2 Year
Hyd No. 6 Hyd No. 5 Total storage used = 681 cuft
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Friday, 03 / 20 / 2020
Hyd. No. 1
303-N
Hydrograph type = Mod. Rational Peak discharge = 0.362 cfs
Storm frequency = 10 yrs Time to peak = 0.08 hrs
Time interval = 1 min Hyd. volume = 2,149 cuft
Drainage area = 0.300 ac Runoff coeff. = 0.9
Intensity = 1.340 in/hr Tc by User = 5.00 min
IDF Curve = Hamilton County.IDF Storm duration = 19.8 x Tc
Target Q =0.030 cfs Est. Req'd Storage =2,055 cuft
12
0.0 0.2 0.3 0.5 0.7 0.8 1.0 1.2 1.3 1.5 1.7 1.8
Q (cfs)
0.00 0.00
0.05 0.05
0.10 0.10
0.15 0.15
0.20 0.20
0.25 0.25
0.30 0.30
0.35 0.35
0.40 0.40
0.45 0.45
0.50 0.50
Q (cfs)
Time (hrs)
303-N
Hyd. No. 1 -- 10 Year
Hyd No. 1 Mod. Rational Est. Storage = 2,055 cuft
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Friday, 03 / 20 / 2020
Hyd. No. 2
304
Hydrograph type = Mod. Rational Peak discharge = 0.299 cfs
Storm frequency = 10 yrs Time to peak = 0.10 hrs
Time interval = 1 min Hyd. volume = 2,136 cuft
Drainage area = 0.310 ac Runoff coeff. = 0.85
Intensity = 1.135 in/hr Tc by User = 6.00 min
IDF Curve = Hamilton County.IDF Storm duration = 19.8 x Tc
Target Q =0.031 cfs Est. Req'd Storage =2,018 cuft
13
0.0 0.2 0.3 0.5 0.7 0.8 1.0 1.2 1.3 1.5 1.7 1.8 2.0 2.2
Q (cfs)
0.00 0.00
0.05 0.05
0.10 0.10
0.15 0.15
0.20 0.20
0.25 0.25
0.30 0.30
0.35 0.35
0.40 0.40
0.45 0.45
0.50 0.50
Q (cfs)
Time (hrs)
304
Hyd. No. 2 -- 10 Year
Hyd No. 2 Mod. Rational Est. Storage = 2,018 cuft
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Friday, 03 / 20 / 2020
Hyd. No. 3
303-O
Hydrograph type = Mod. Rational Peak discharge = 0.174 cfs
Storm frequency = 10 yrs Time to peak = 0.10 hrs
Time interval = 1 min Hyd. volume = 1,240 cuft
Drainage area = 0.170 ac Runoff coeff. = 0.9
Intensity = 1.135 in/hr Tc by User = 6.00 min
IDF Curve = Hamilton County.IDF Storm duration = 19.8 x Tc
Target Q =0.017 cfs Est. Req'd Storage =1,175 cuft
14
0.0 0.2 0.3 0.5 0.7 0.8 1.0 1.2 1.3 1.5 1.7 1.8 2.0 2.2
Q (cfs)
0.00 0.00
0.05 0.05
0.10 0.10
0.15 0.15
0.20 0.20
0.25 0.25
0.30 0.30
0.35 0.35
0.40 0.40
0.45 0.45
0.50 0.50
Q (cfs)
Time (hrs)
303-O
Hyd. No. 3 -- 10 Year
Hyd No. 3 Mod. Rational Est. Storage = 1,175 cuft
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Friday, 03 / 20 / 2020
Hyd. No. 4
PR-SE
Hydrograph type = Mod. Rational Peak discharge = 1.326 cfs
Storm frequency = 10 yrs Time to peak = 0.13 hrs
Time interval = 1 min Hyd. volume = 10,818 cuft
Drainage area = 1.520 ac Runoff coeff. = 0.87
Intensity = 1.003 in/hr Tc by User = 8.00 min
IDF Curve = Hamilton County.IDF Storm duration = 17.0 x Tc
Target Q =0.152 cfs Est. Req'd Storage =10,157 cuft
15
0.0 0.2 0.3 0.5 0.7 0.8 1.0 1.2 1.3 1.5 1.7 1.8 2.0 2.2 2.3 2.5
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
Q (cfs)
Time (hrs)
PR-SE
Hyd. No. 4 -- 10 Year
Hyd No. 4 Mod. Rational Est. Storage = 10,157 cuft
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Friday, 03 / 20 / 2020
Hyd. No. 5
Combined Flows
Hydrograph type = Combine Peak discharge = 2.160 cfs
Storm frequency = 10 yrs Time to peak = 0.13 hrs
Time interval = 1 min Hyd. volume = 16,341 cuft
Inflow hyds. = 1, 2, 3, 4 Contrib. drain. area = 2.300 ac
16
0.0 0.2 0.3 0.5 0.7 0.8 1.0 1.2 1.3 1.5 1.7 1.8 2.0 2.2 2.3 2.5
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
3.00 3.00
Q (cfs)
Time (hrs)
Combined Flows
Hyd. No. 5 -- 10 Year
Hyd No. 5 Hyd No. 1 Hyd No. 2 Hyd No. 3
Hyd No. 4
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Friday, 03 / 20 / 2020
Hyd. No. 6
Pond Outflow
Hydrograph type = Reservoir Peak discharge = 2.159 cfs
Storm frequency = 10 yrs Time to peak = 1.65 hrs
Time interval = 1 min Hyd. volume = 16,340 cuft
Inflow hyd. No. = 5 - Combined Flows Max. Elevation = 825.88 ft
Reservoir name = Pond 1 Max. Storage = 992 cuft
Storage Indication method used.
17
0.0 0.3 0.7 1.0 1.3 1.7 2.0 2.3 2.7 3.0
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
3.00 3.00
Q (cfs)
Time (hrs)
Pond Outflow
Hyd. No. 6 -- 10 Year
Hyd No. 6 Hyd No. 5 Total storage used = 992 cuft
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Friday, 03 / 20 / 2020
Hyd. No. 1
303-N
Hydrograph type = Mod. Rational Peak discharge = 0.542 cfs
Storm frequency = 100 yrs Time to peak = 0.08 hrs
Time interval = 1 min Hyd. volume = 3,218 cuft
Drainage area = 0.300 ac Runoff coeff. = 0.9
Intensity = 2.007 in/hr Tc by User = 5.00 min
IDF Curve = Hamilton County.IDF Storm duration = 19.8 x Tc
Target Q =0.090 cfs Est. Req'd Storage =2,935 cuft
19
0.0 0.2 0.3 0.5 0.7 0.8 1.0 1.2 1.3 1.5 1.7 1.8
Q (cfs)
0.00 0.00
0.10 0.10
0.20 0.20
0.30 0.30
0.40 0.40
0.50 0.50
0.60 0.60
0.70 0.70
0.80 0.80
0.90 0.90
1.00 1.00
Q (cfs)
Time (hrs)
303-N
Hyd. No. 1 -- 100 Year
Hyd No. 1 Mod. Rational Est. Storage = 2,935 cuft
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Friday, 03 / 20 / 2020
Hyd. No. 2
304
Hydrograph type = Mod. Rational Peak discharge = 0.466 cfs
Storm frequency = 100 yrs Time to peak = 0.10 hrs
Time interval = 1 min Hyd. volume = 3,190 cuft
Drainage area = 0.310 ac Runoff coeff. = 0.85
Intensity = 1.770 in/hr Tc by User = 6.00 min
IDF Curve = Hamilton County.IDF Storm duration = 19.0 x Tc
Target Q =0.093 cfs Est. Req'd Storage =2,854 cuft
20
0.0 0.2 0.3 0.5 0.7 0.8 1.0 1.2 1.3 1.5 1.7 1.8 2.0
Q (cfs)
0.00 0.00
0.05 0.05
0.10 0.10
0.15 0.15
0.20 0.20
0.25 0.25
0.30 0.30
0.35 0.35
0.40 0.40
0.45 0.45
0.50 0.50
Q (cfs)
Time (hrs)
304
Hyd. No. 2 -- 100 Year
Hyd No. 2 Mod. Rational Est. Storage = 2,854 cuft
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Friday, 03 / 20 / 2020
Hyd. No. 3
303-O
Hydrograph type = Mod. Rational Peak discharge = 0.265 cfs
Storm frequency = 100 yrs Time to peak = 0.10 hrs
Time interval = 1 min Hyd. volume = 1,857 cuft
Drainage area = 0.170 ac Runoff coeff. = 0.9
Intensity = 1.729 in/hr Tc by User = 6.00 min
IDF Curve = Hamilton County.IDF Storm duration = 19.5 x Tc
Target Q =0.051 cfs Est. Req'd Storage =1,668 cuft
21
0.0 0.2 0.3 0.5 0.7 0.8 1.0 1.2 1.3 1.5 1.7 1.8 2.0 2.2
Q (cfs)
0.00 0.00
0.05 0.05
0.10 0.10
0.15 0.15
0.20 0.20
0.25 0.25
0.30 0.30
0.35 0.35
0.40 0.40
0.45 0.45
0.50 0.50
Q (cfs)
Time (hrs)
303-O
Hyd. No. 3 -- 100 Year
Hyd No. 3 Mod. Rational Est. Storage = 1,668 cuft
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Friday, 03 / 20 / 2020
Hyd. No. 4
PR-SE
Hydrograph type = Mod. Rational Peak discharge = 2.457 cfs
Storm frequency = 100 yrs Time to peak = 0.13 hrs
Time interval = 1 min Hyd. volume = 15,922 cuft
Drainage area = 1.520 ac Runoff coeff. = 0.87
Intensity = 1.858 in/hr Tc by User = 8.00 min
IDF Curve = Hamilton County.IDF Storm duration = 13.5 x Tc
Target Q =0.456 cfs Est. Req'd Storage =14,330 cuft
22
0.0 0.2 0.3 0.5 0.7 0.8 1.0 1.2 1.3 1.5 1.7 1.8 2.0
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
3.00 3.00
Q (cfs)
Time (hrs)
PR-SE
Hyd. No. 4 -- 100 Year
Hyd No. 4 Mod. Rational Est. Storage = 14,330 cuft
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Friday, 03 / 20 / 2020
Hyd. No. 5
Combined Flows
Hydrograph type = Combine Peak discharge = 3.730 cfs
Storm frequency = 100 yrs Time to peak = 0.13 hrs
Time interval = 1 min Hyd. volume = 24,187 cuft
Inflow hyds. = 1, 2, 3, 4 Contrib. drain. area = 2.300 ac
23
0.0 0.2 0.3 0.5 0.7 0.8 1.0 1.2 1.3 1.5 1.7 1.8 2.0 2.2
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
3.00 3.00
4.00 4.00
Q (cfs)
Time (hrs)
Combined Flows
Hyd. No. 5 -- 100 Year
Hyd No. 5 Hyd No. 1 Hyd No. 2 Hyd No. 3
Hyd No. 4
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Friday, 03 / 20 / 2020
Hyd. No. 6
Pond Outflow
Hydrograph type = Reservoir Peak discharge = 3.460 cfs
Storm frequency = 100 yrs Time to peak = 1.68 hrs
Time interval = 1 min Hyd. volume = 24,186 cuft
Inflow hyd. No. = 5 - Combined Flows Max. Elevation = 827.42 ft
Reservoir name = Pond 1 Max. Storage = 4,229 cuft
Storage Indication method used.
24
0.0 0.3 0.7 1.0 1.3 1.7 2.0 2.3 2.7
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
3.00 3.00
4.00 4.00
Q (cfs)
Time (hrs)
Pond Outflow
Hyd. No. 6 -- 100 Year
Hyd No. 6 Hyd No. 5 Total storage used = 4,229 cuft
Emergency Overflow Calculations Project:
Date:
Job No:
Checked By:
Prepared By:
Peak Inflow 12.10 cfs
Peak Inflow (125%) 15.13 cfs
Cw (Coefficient of Weir) 3.33
h (Flow depth over Weir)0.55 ft
Width of Weir 11.14 ft
L = Q/ (Cs * H ^ (3/2))Free Discharge Suppressed
December 17, 2019
Carmel Self Storage
w190582
SSR
RLW
Section 4
1 Watershed Model SchematicHydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2
Project: w190582 wq model 2019.12.06.gpw Monday, 12 / 16 / 2019
Hyd.Origin Description
Legend
1 SCS Runoff WQ-1
Hydrograph Return Period Recap
Hyd. Hydrograph Inflow Peak Outflow (cfs) Hydrograph
No. type hyd(s)Description
(origin) 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr
1 SCS Runoff ------ 4.351 ------- ------- ------- ------- ------- ------- ------- WQ-1
Proj. file: w190582 wq model 2019.12.06.gpw Monday, 12 / 16 / 2019
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2
Hydrograph Summary Report
Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph
No. type flow interval Peak volume hyd(s) elevation strge used Description
(origin) (cfs) (min) (min) (cuft) (ft) (cuft)
1 SCS Runoff 4.351 3 717 10,362 ------ ------ ------ WQ-1
w190582 wq model 2019.12.06.gpw Return Period: 1 Year Monday, 12 / 16 / 2019
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2019.2 Monday, 12 / 16 / 2019
Hyd. No. 1
WQ-1
Hydrograph type = SCS Runoff Peak discharge = 4.351 cfs
Storm frequency = 1 yrs Time to peak = 717 min
Time interval = 3 min Hyd. volume = 10,362 cuft
Drainage area = 3.850 ac Curve number = 98
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = User Time of conc. (Tc) = 8.00 min
Total precip. = 1.00 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
0 180 360 540 720 900 1080 1260 1440
Q (cfs)
0.00 0.00
1.00 1.00
2.00 2.00
3.00 3.00
4.00 4.00
5.00 5.00
Q (cfs)
Time (min)
WQ-1
Hyd. No. 1 -- 1 Year
Hyd No. 1
SECTION A-A
PARTS LIST
SIZEDESCRIPTIONITEM
I.D. PRECAST MANHOLE1
INTERNAL COMPONENTS
(PRE-INSTALLED)
2
FRAME AND COVER (ROUND)3
OUTLET PIPE(BY OTHERS)4
INLET PIPE(BY OTHERS)5
A A
ANY WARRANTY GIVEN BY HYDRO INTERNATIONAL WILL APPLY ONLY TO THOSE ITEMS SUPPLIED BY IT. ACCORDINGLY HYDRO INTERNATIONAL CANNOT ACCEPT ANY RESPONSIBILITY FOR ANY STRUCTURE, PLANT, OR EQUIPMENT, (OR THE PERFORMANCE THERE OF) DESIGNED, BUILT, MANUFACTURED, OR SUPPLIED BY ANY THIRD
PARTY. HYDRO INTERNATIONAL HAVE A POLICY OF CONTINUOUS DEVELOPMENT AND RESERVE THE RIGHT TO AMEND THE SPECIFICATION. HYDRO INTERNATIONAL CANNOT ACCEPT LIABILITY FOR PERFORMANCE OF ITS EQUIPMENT, (OR ANY PART THEREOF), IF THE EQUIPMENT IS SUBJECT TO CONDITIONS OUTSIDE ANY DESIGN
SPECIFICATION. HYDRO INTERNATIONAL OWNS THE COPYRIGHT OF THIS DRAWING, WHICH IS SUPPLIED IN CONFIDENCE. IT MUST NOT BE USED FOR ANY PURPOSE OTHER THAN THAT FOR WHICH IT IS SUPPLIED AND MUST NOT BE REPRODUCED, IN WHOLE OR IN PART, WITHOUT PRIOR PERMISSION IN WRITING FROM HYDRO
INTERNATIONAL.
WEIGHT:
N/A
SHEET SIZE:
B
SHEET:
1 OF 1
DRAWING NO.:
REFERENCE NUMBER:
hydro-int.com
HYDRO INTERNATIONAL
Rev:
-
DRAWN BY:
ER
Title
CHECKED BY: APPROVED BY
DATE:SCALE:
NTS
COMMENTS:
PROJECTION
MATERIAL:
IF IN DOUBT ASK
REVISION HISTORY
REV BY DESCRIPTION DATE
-FIRST RELEASE
1. MANHOLE WALL AND SLAB
THICKNESSES ARE NOT TO
SCALE.
2. CONTACT HYDRO
INTERNATIONAL FOR A
BOTTOM OF STRUCTURE
ELEVATION PRIOR TO
SETTING DOWNSTREAM
DEFENDER MANHOLE.
PRODUCT SPECIFICATION:
1.PEAK HYDRAULIC FLOW:
2.MIN SEDIMENT STORAGE CAPACITY:
3.OIL STORAGE CAPACITY:
4.MAXIMUM INLET/OUTLET PIPE DIAMETERS: 48 in. (1200 mm)
5.THE TREATMENT SYSTEM SHALL USE AN INDUCED VORTEX TO
SEPARATE POLLUTANTS FROM STORMWATER RUNOFF.
GENERAL NOTES :
1.General Arrangement drawings only. Contact Hydro International for site
specific drawings.
2.Inlet/outlet pipe angle can vary to align with drainage network (refer to
project plans)
3.Peak flow rate and minimum height limited by available cover and pipe
diameter.
1
1
3
22
Pipe DetailsPIPE MATERIAL LENGTH INV IN INV OUT SLOPEOUTLETft%INLET 1 ft %INLET 2 ft %INLET 3 ft %INLET 4 ft %
The Water Quality Unit (WQU) shown on the plans has been designed
specifically for this project. WQU substitutions will not be allowed unless
written approval by the Engineer of Record prior to the Bid. The WQU
must be housed in a Precast Concrete Structure, and must meet (at a
minimum) the Treated Flow Rate and Bypass Flow Rate shown on this
detail.
Flow Rates per City of Knoxville Land Development Manual (January
2018):
o SPAP Flow: 1.88 cfs
o First Flush Flow: 0.94 cfs
The Water Quality Unit (WQU) shown on the plans has been designed
specifically for this project. WQU substitutions will not be allowed unless
written approval by the Engineer of Record prior to the Bid. The WQU must be
housed in a Precast Concrete Structure, and must meet (at a minimum) the
Treated Flow Rate and Bypass Flow Rate shown on this detail.
Flow Rates per Knox County Approved Proprietary BMP Devices (February
2018):
o Treatment Flow: 4FDHC - 1.50 cfs
HYDRO FRAME AND
COVER (INCLUDED)
GRADE RINGS BY OTHERS
AS REQUIRED
WEIR: CONTACT HYDRO
5
4
NOTE: ADDITIONAL HEIGHT MAY BE
REQUIRED DEPENDING ON PIPE SIZE
NOTE:
NOT FOR CONSTRUCTION. CONTACT
HYDRO FOR SITE SPECIFIC DETAIL.
MAX PIPE SIZE MAY NOT BE POSSIBLE IN
OFFLINE CONFIGURATION.
DIVERSION
STRUCTURE
BY OTHERS
DIVERSION
STRUCTURE
BY OTHERS
Site:
Structure No:
8.49 cfs 2.8 yd31120 gal
RIM: 829.2 FT
OUTLET 824.06 FT
SUMP: 816.66 FT
88.8"
30
12
12 20_12_0914
3/12/2020websterr@weihe.net
(in)
96
150.48"
8 FT FIRST DEFENSE®
HIGH CAPACITY
Carmel Self Storage
1000
City of Indianapolis Stormwater Quality Unit (SQU)
Selection Guide
Pg. 2 10/01/2019
Version 14.0
Manufactured
SQU SQU System Model
Max
Treatment
Flow
(cfs)
Max 10-yr
On-Line
Flow Rate
(cfs)
Cleanout
Depth
(Inches)
4-ft 1.12 2.95 9
6-ft 2.52 6.63 12
8-ft 4.49 11.81 15
10-ft 7.00 18.40 18
Hydro
International
Downstream
Defender1
12 ft 10.08 26.51 21
3-ft 0.85 1.84 9
4-ft 1.5 3.24 9
5-ft 2.35 5.08 9
6-ft 3.38 7.30 9
7-ft 4.60 9.94 9
Hydro
International
First Defense
High Capacity1
8-ft 6.00 12.96 9
HS-3 0.50 1.00 6
HS-4 0.88 1.76 6
HS-5 1.37 2.74 6
HS-6 1.98 3.96 6
HS-7 2.69 5.38 6
HS-8 3.52 7.04 6
HS-9 4.45 8.9 6
HS-10 5.49 10.98 6
HS-11 6.65 13.3 6
HydroStorm by
Hydroworks,
LLC1
HS-12 7.91 15.82 6
XC-2 0.57 1.16 6
XC-3 1.13 2.30 6
XC-4 1.86 3.79 6
XC-5 2.30 4.68 6
XC-6 3.31 6.74 6
XC-7 4.50 9.16 6
XC-8 5.88 11.97 6
XC-9 7.44 15.14 6
XC-10 9.19 18.70 6
XC-11 11.12 22.63 6
XC-12 13.23 26.92 6
AquaShield
Aqua-Swirl
Xcelerator1
XC-13 15.53 31.60 6
1 Installed in the configuration as reviewed by NJCAT only