HomeMy WebLinkAbout42290040 - GRT 67 - Energy CertificateIndiana 2�2� Perfarman�e �ompliance
Praperty
688 LAGERFIELD DRIVE
CARMEL, IN 4fifl32
Madel: TH 9i97 5L6 MID 9PL RR
Community: GRAMERCY
909aAVIN GRAMERCY 688
LAGERFIELD DRIVE-TH 9797 SLB
11D5
11 D2.4.12
11 D2.5
11 D2.5
Inspe�tion 5tatus
Results are projected
This report is hased on a projected rating (fram plansj and requires field confirmatian.
Annual Energy Cost
Design
Heating
Cooling
Water Heating
Mechanical Ventilatian
5ubTotal - Used to determine �omplian�e
Lights & Appliances wlout Ventilation
�nsite generation
Total
Performance-based compliance passes by 9.7°�6
Air Leakage Testing
Area-weighted average fenestration SHGC
Area-weighted a�erage fenestration Ll-Factor
Requirements
�
�
�
�
�
�
�
�
❑rganixatian
TopBuild Home 5ervi�es, I
Eric Bjerre
6uilder
QAVIQ 1NEEKLEY
HDMES
11D4.1 Lighting Equipment Efficiency
f�landatory Checklist �'�andatory code requirements that are not
checked by Ekotrope must be met.
11D3.6 Mechanical Ventilation Rate
1103.6.1 hlechanical Ventilation Efficacy
Indiana 2020 Performance
$520
$�7
$183
$19
$798
$48fi
$0
$1,284
a Build
Home 5enrices
ENVIRCIN�IhENTSFOR J,�, f�
As aesigned
$443
$72
$183
$22
$721
$486
$0
$1,2�7
Air sealing is 3.00 AGH at 50 Pa. It must not exceed 5.0� ACH at 5a Pa.
Design ex�eeds requirements fvr Indiana 202� Perfvrman�e compliance hy 9.7°Io.
As a 3rd party extension of the code jurisdi�tion utilizing these reports, I certify that this energy code complian�e document has been created in accordan�e with the requirements of
Chapter 4 of the adopted Intemational Energy Conservation Code based on Climate Zone 5. If rating is Projected, I certiTy that the building design des�ribed herein is consistent with
the building plans, specifications, and other �al�ulations submitted �tiith the permit application. If rating is Confirmed, I �ertiTy that the address referenced abo�e has been
inspected.+tested and that the mandatory pro�isions of the IECC have 6een installed to meet or ex�eed the intent of the IECC or will be verified as such by another party.
Name
Organizatian
Eric 8jerre
TapBuild Home 5eruices. In�
Signature: ��'�'G ����
❑igitally sig��ed: 4110!2D at 4:44 PI�1
Ekotrope RATER - Vers�on 3.2.3.24�8
Indiana 202� Perforinance compliance results calculated using Ekotrope RATER's energ}� and code compliance algorithm, including appropriate amendments.
Ekotrope RATER is a RESNET Accredited HERS Rating Tool. All results are 6ased on data entered 6y Ekotrope users.
Ekotrope disclaims all lia6ility for the information shown on this report.
�S8 LACERFIELD DRIVE
Ceiling Attic, R-38
Abawe Grade Walls R-22
Foundation Walls N!A
Framed Floor R-3�
Slab R-1�.0 Perirneter, R-10.0
Under
Ilnfiltration 3 ACH50
Window U-Value: fl.34, SHGC: 0.31
Building Features
Duct 5upply R-6.0, Return R-G.0
Duct Leakage ta Outside 3 CFM251 10� ft2
Tatal auct Leakage 4 CFM251 100 ft2 (Past-Canstructiony
Heating Furnace • IVatural Gas • 93 AFUE
Cooling Air Conditianer • Electri� • 13 SEER
Water Heating Water Heater • Natural Gas •�.96 Energy Factar
As a 3ro party ext�r7sion of tne code junsd�ci�on ut�lizir7g these reports, I cert�fy that ihis energy code can7pliar7ce documeryt has been created in accoraance �;rith the req�ire��erts of
Chapter 4 of the adopted International Energy Conservation Code based on Climate Zone 5. If rating is Projected, I certify that the building design described herein is consiste�t �;:ith :�e
building plans. specifications, and other calculations submitted with the permit application. If rating is Confrmed: I certiTy that the address referenced above has been inspected.+tested and
that the mandatory provisions of the IECC have been installed to meet or exceed the intent ofthe IEGC or vrill be verifed as such by : neth�r partV.
Name� Eric Bjerre Si�nature: "�'�'� ����
Organization: TapBuild Hom�e Services. Inc. Digitallysigned: 411D120 a14:44 PM
o rope - Version 3.2.3.24D8
Irdiara 2C2ii Certiicate cam��iance results calculated using Eko�rape 4.ATER's energy and code complia�c� �Inari:lim. including ao��opriate amerdme�ts
E4::�tr:��e R=.TER is a RESNETHcc-edited HERS Rat rg Tool. =.1 resul°s are based on d.=.:._. �n � a: :�: EF:otr�pe ��sers.
-E:o�r��:e : a=1a -is all lial: :.: i� t a in-c ma:ic� a�o::n o� 1� a r=��c �.
CARM E L, 1 N 4G�32
Builder: ❑AVID WEEKLEY H�MES
IVI4del: TH 9797 5L6 MID 9PL RR Cammunity: GRAIVIERCY
This report is based an a projected rating (fram plans] and requires field canfirmation.
Energy �ode Inspectian Checklist
Property ❑rganixatian
688 LAGERFIELD DRIVE TopBuild Home 5ervi�es, I
CARMEL, IN 4fifl32 Eric Bjerre
Madel: TH 9i97 5L6 MID 9PL RR
Community: GRAMERCY 6uilder
QAVIQ 1NEEKLEY
909aAVIN GRAMERCY 688 HDMES
LAGERFIELD DRIVE-TH 9797 SLB
�eneral Building Infvrmatian
Canditioned Area �sq ft}
Canditioned Valume (�ubic ft)
Insulated Shell Area (sq ft�
1,681
17,72�
4,626.5
Inspe�tion 5tatus
Results are projected
a Build
Home 5enrices
ENVIRCIN�IhENTSFOR J,�, f�
The building energy model in Ekotrope reflects the building assemblies and energy features listed below. Sometimes energy
features will �hange in the field frorn what has been modeled. The inspection pro�ess should identify any �hanges and ensure
that the home cantinues to meet the applicable energy code.
51ab
� Name: SLAB(645 s.f., 106 ft. exterior perimeter}
R-10 perimeter insulation, R-10 under slah insulation.
Framed Flvar
� Name: FDA �25 s.f.)
R-0 continuous insulation, R-30 cavity insulation
Insulatian Grade: I
� Name: FDG (430 s.f.}
R-0 continuous insulation, R-30 cavity insulatian
Insulation Grade: I
Fvundatian Wall
Nane Present
Abvve �rade Wall
� Name: AMB (628.8 s.f.}
R-3 continuous insulati�n, R-19 cavity insulation
Insulation Grade: I
� Name: GAR (210.8 s.f.}
R-0 continuous insulation, R-19 cavity insulatian
Insulati�n Grade: I
Energy �ode Inspectian Checklist
Property ❑rganixatian
688 LAGERFIELD DRIVE TopBuild Home 5ervi�es, I
CARMEL, IN 4fifl32 Eric Bjerre
Madel: TH 9i97 5L6 MID 9PL RR
Community: GRAMERCY 6uilder
QAVIQ 1NEEKLEY
909aAVIN GRAMERCY 688 HDMES
LAGERFIELD DRIVE-TH 9797 SLB
� Name: C�M �1,534.4 s.f.}
R-0 continuous insulation, R-13 cavity insulatian
Insulation Grade: I
Rim Jaist
� Name: AMB (45.5 s.f.y
R: 22.00
� Name: ATT �7 s.f.}
R: 19.00
Ceiling 1 Rvvf
� Name: FLAT �1,10D s.f. y
R-25 continuous insulation, R-13 cavity insulation
Insulation Grade: I
❑paque Daar
� Name: AMB (20 s.f.)
U: 0.227
� Name: GAR (17.8 s.f.}
U: 0.227
Glazing
Inspe�tion 5tatus
Results are projected
� Name: FR�NT 1 ST (48 s.f.), U: 0.340, SHGC: 0.31, �rientatian: NDRTH
� Name: FRONT 1ST (4.7 s.f.�, U: a.34a, SHGC: D.31, �rientation: N�RTH
� Name: FR�NT 1 ST (6 s.f.}, U: 0.340, SHGC: 0.31, Drientatian: hIDRTH
� Name: FR�NT 2ND �36 s.f.}, lJ: 0.340, SHGC: 0.31, Orientation: N�RTH
� Name: FR�NT 2ND �18 s.f.}, lJ: 0.340, SHGC: 0.31, ❑rientation: N�RTH
a Build
Home 5enrices
ENVIRCIN�IhENTSFOR J,�, f�
2
Energy �ode Inspectian Checklist
Property ❑rganixatian
688 LAGERFIELD DRIVE TopBuild Home 5ervi�es, I
CARMEL, IN 4fifl32 Eric Bjerre
Madel: TH 9i97 5L6 MID 9PL RR
Community: GRAMERCY 6uilder
QAVIQ 1NEEKLEY
Inspe�tion 5tatus
Results are projected
909aAVIN GRAMERCY 688 HDMES
LAGERFIELD DRIVE-TH 9797 SLB
� Name: BAGK 2ND �18 s.f.}, U: 0.34a, SHGC: 0.31, ❑rientation: S�IJTH
� Name: BAGK 2ND �18 s.f.}, U: 0.34a, SHGC: 0.31, ❑rientation: S�IJTH
5kylight
Nane Present
Mechanical Ventilativn
� Mechanical ventilation system rated for, and capable of, praviding continuous �entilation.
System shall include automatic timing controls.
System type: Air Cycler, 6 hrsJday, 16D.8 lNatts
Mechanical Equiprnent
� Fuel-fired air distributi�n {1 }• Natural Gas • 10D°/o Heating Load [�7a 93 AFUE
� Air conditioner (2} • Electric • 1 DD°Io Caoling Load [�7a 13 SEER
� Water Heating �3} • Natural Gas • 100°/o HQt UVater Load @ 0.96 Energy Factor
Air Leakage Cvntrvl
� Test Status: 6lower-door tested
Hause is air-sealed as to achieve 886 CFM50 (3.OD ACH50} or less at final blower-daar test.
Infiltration Requirements for IECC in Climate Zane 5
2a09 IECC Infiltration limit for the design hame is 7 ACHS�.
2�12 IECC Infiltration limit fQr the design home is 3 ACHS�.
2a15 IECC Infiltratian limit for the design hame is 3 ACHS�.
2a18 IECC Infiltration limit for the design hame is 3 ACHS�.
a Build
Home 5enrices
ENVIRCIN�IhENTSFOR J,�, f�
3
Energy �ode Inspectian Checklist
Property ❑rganixatian
688 LAGERFIELD DRIVE TopBuild Home 5ervi�es, I
CARMEL, IN 4fifl32 Eric Bjerre
Madel: TH 9i97 5L6 MID 9PL RR
Community: GRAMERCY 6uilder
QAVIQ 1NEEKLEY
909aAVIN GRAMERCY 688 HDMES
LAGERFIELD DRIVE-TH 9797 SLB
Duct Leakage
Duct 5ystem 1
Inspe�tion 5tatus
Results are projected
NDT entirely within �onditioned spa�e, testing required
Leakage to ❑utside spe�ified as: 3 CFM251 1 DD ft2
Total Leakage spe�ified as: 4 CFM25 ! 1 D� ftZ �Post-Constru�tion}
Duct Leakage Cvde Requirements fvr IECC
2009 IECC:
Postconstructian Leakage Test: ❑uct Leakage ta �utdoors �= 8 CFM251 1 a0 sq ft �FA.
Rough in Test with AHU: Tatal auct Leakage c= � CFM251 100 sq ft CFA.
Rough in Test without AHU: Total Duct Leakage �= 4 CFM25 ! 100 sq ft CFA.
2012 IECC and 2015 IECC Prescriptive Path:
Postconstructian Leakage Test: Tatal au�t Leaka�e �= 4 CFM251 100 sq ft CFA.
Rough in Test with AHU: Total auct Leakage �= 4 CFM251 100 sq ft CFA.
Rough in Test without AHU: Total Duct Leakage �= 3 CFM25 ! 100 sq ft CFA.
�015 Performance Path �Cost Campliance}:
a Build
Home 5enrices
ENVIRCIN�IhENTSFOR J,�, f�
Leakage testing is required UNLESS all ducts and air handlers are lo�ated entirely within the thermal envelope.
There is no passlfail threshold for duct leakage Qn the performance path.
Praject Nates
❑RG ID: 48
ACC#: 909DAVIN
BUILDER NAME: DAVID WEEKLEY HOMES
PR�7ECT ID: 59945
SUBDIV25IDN: GRAMERCY
PLAN ID: 847975
PLAN NAME: 588 LAGERFIELD DRIVE-TH 9797 SLB MID 9PL RR-CC
REVISIDN DATE: 04�10�2020
PR�GRAM: EFL�D�3Y�100��CH5:N❑
CREATED ❑N: 04�10�2020
4