Loading...
HomeMy WebLinkAboutT01Technical Basis of Design (TBoD) Table of Contents Technology Design Drawings Cover/Scope/Inventory ............................................................................................. Symbol/Li bra ry/Notes .. ............................................................................................. Floor Drawing/All Layers .......................................................................................... Floor Drawing/Reflected Ceiling Plan & Conduit Details ...................................... Room Drawing/AV Reference Conference Room Display ................................... Reference Drawing/WAP LLD .................................................................................... T01 T02 T03 T04 TOS T06 • Standard GWIM branch technology will be deployed • Low voltage vendor to provide cabling from desk to TV for Office N solution • Pervasive BAC wireless - TPM to work with wireless team and have new layout verified with existing wireless and update as needed Area of Work • Data cabling jacks are defined as follows: 1 cable data jack has a 1 blue RJ-45 connector, 2 cable data jack has a 1 blue/1 grey R1-45 connector, and 3 cable data jack has a 1 blue/1 grey/1 white RJ-45 connector - the use of white or other color work area cabling is permitted when cabling is conveyed in open ceiling work area environments • Data cabling will be re-used wherever possible, but must be CAT6 at a minimum • Existing jack locations will be used where possible; unused locations will need a blank plate or be repaired • All abandoned cabling is to be removed (includes unused copper, fiber, coaxial, etc...) • Any rooms with walls to deck should have adequate sleeves for low voltage cable pass thru • All cabling outside of bank space is required to be armored or in conduit, conduit to be EMT unless otherwise specified Project Inventory nn vioo� m.emory AutlioYtl¢o Caun� APP��.� , AV-0kplay551n 1 AV - Display ]Sin 1 PV�DbpIay861n 1 av-ro��nan�eiic�e:vooi i av-r�pe Hv i nv-.roe�wmmere�aaoomwimury z AV-iypeUiV 2 oe.mez ca�m oEv�co�reeo�awmio z oev-m�wor�ano� z LowVol�age Coun� �v-cnre o�aie. 1� ��. �„6 o�.a , ��-�„snmoi�, s �v-coa. a s.ma: co�m sys-w�inr��mo�vrm�er i Scope - scope and assumptions for this project Project Scope: Reconfigure existing 7th floor Merrill suite at 510 E 96th Street Indianapolis, IN 46240 IN9-510-07 to expand the space for John Cate and his team so he can grow the team. Building Infrastructure • Existing Network Equipment Room will be utilized • Existing New Telecommunications Room on west side of floor will be utilized - most of the floor home runs to another floor • Bloomberg and Merrill channel exists • CATV exists - LOB requesting CAN in both conference rooms - received exception from AV Engineering to add CATV in both conference rooms, CATV required for Open Area Display and Office - TPM to coordinate with media management partner to provide CATV service - existing SMATV • Fax to mail will be used • Knowledge Channel required and to be streamed over BARONET AV Scope •(1) Medium Conference Room (type 243) - 75" N- Bemhardt profile credenza no pillar- CATV - 03.102 •(1) Medium Conference Room (type 243) - 86" TV - Bernhardt profile credenza no pillar- CATV -03.201 • Open Area Display - 55" TV - TV and mount to meet ADA compliance - CAN General Notes • Additional specifications can be found at www.bacguidelines.com • New multi-mode fiber is to be 24-strand OM4 and 25-pair copper is to be new armored/plenum • Data cabling will not exceed 295' from face plate to patch panel • Need for plenum rated cable to be verified by cabling vendor according to local code • RG6 Quad Shield coax cable should be home run to the current tap location using compression type fittings • Card reader counts and locations should be coordinated with security; NERs and TRs require card access . Wireless access point bca[ions to be provided by Global Network; each WAP requires: CAT6A cabling (25' service loop), jacks and pa[ch panels; powered by network switch with power over ethernet (POE) • TPM to verify with Global Network the network switch type and power requirements if applicable • Apple N must be fully provisioned by the AV vendor and all software updates must be completed prior to bringing the device on-site as it will require internet connectivity which will not be available at the installation location; the secure Pin to Present feature must also be enabled in the general settings menu as a part of this provisioning • Office TV's to be provided by LOB • All power for Technology and AV are not to be on managed (Occupancy Sensor) or switched power • PjM to provide all CD set revisions including final sets, in PDF format to TDT lead (sets needed: power/data, electrical, furniture and RCP) • PjM to transfer TBOD information into all bid sets • All vendors will provide and meet COI, permits, and CEWA requirements as needed • TPM, Media Management and low voltage cabling vendor to coordinate CATV cabling requirements '�� �' ' BAN K OF AM ERICA Global Workspace Services Technology TITLE IN-510 E 96TH ST, 3RD FL, INDIANAPOLIS MLTKD UPFIT IN9-510-07 DRAWN BY STEVE ALFREY TPM NAME CHRIS ACKERMAN PJM NAME LESLIE SOTO PROJECT# 02807P193490 DRAWING SCALE covER N/A DATE REVISION 3/10/2020 1.2 TBOD ISSUED FOR CD COORDINATION RELEA5E0 FOR CONSTRIICTI�N Su6jec� �o compliance with all regula�ions of S�a�e antl Local Codes r City of Carmel �un��\i lo•rvalM��' DATE: Qrj�Q�j�2O T01 2TY OF BANK OF AMERICA. ANY REPRODUCTION, ALTERATION, OR USE FOR OTHER THAN THE INTENDED PROJECT, WITHOUT THE WRITTEN CONSENT OF BANK OF AMERICA TECHNOLOGY DESIGN TEAM IS EXPRESSLY FORBIDDEN. BANK OF AMERICA N.A. MEMBER FDIC OO 2019 BANK OF AMERICA CORPORATION. ALL RIGHTS RESERVED.