HomeMy WebLinkAboutGN1Frame Business Partner
Community & Home Site
Constmction Manager
Frame Checklist
Frame Check Garage
FC CM Attic Access location correct per Print, access has 14 inch sides if an insulated attia Check size of Gables Access.
FC CM Post plumb and strapped to beam at top
FC CM Garage beam will be sealed to prevent air infiltration to floor space afler Drywall is hung
FC CM Walls in Attic have sheathing installed
FC CM All panels are taped in Attic & Verticals Taped.
FC CM House band board in garage attic has insulated sheathing installed
FC ,,, CM .., House wrap installed at Band system in Garage and pulled down
FC CM Truss bracing inslalled if required
FC CM 2x Framing for tmsses/girders nailed directly house to framing without foam sheathing between frame members
FC CM Tmss hanger's nailed completely with required nails
FC CM Garege door opening correct size and location
FC CM Smah Vim a� botlom of door a� concrete is % inch off of concrete
FC CM Anchor bolis in garage plate installed 12 inches from each plate end at founda[ion and not more than 6 foot on
center and 12 inches from corner. Garage Portal frame 2x2 square washers in place at door. Nuts tight.
FC CM Garege steps are of equal rise to top of door threshold from garage floor. Not more than e'/. rise
FC CM Sill sealer installed under wall or floor system between house and garage
Garage door bucks installed floor to ceiling in 1 piece 2x6 minimum. Buck is not to be in contact with concrete
FC CM nailed 12 inches on center
Garage door buck installed above door 1 piece 2x6. 2x10 installed above center of door to ceiling for garage door
FC CM opener nailed 12 inches on center
FC CM Estate/Sitle load elecirical panel walls build if required. Note these walls may not be on print.
FC CM OSB is wt back 2 inches on each side of ridge, Ripper row no less ihan 2' at Peak.
FC CM Bowed studs are marked. Note these markings may be visible to customer if garage in not finished
FC CM Garege b house door set with 3 shims on each side and/or Exerior Service Door.
FC CM Drywall nailer in place on ceiling antl corners/check for insulation access.
FC CM Garege door Portal framing correct per IRC 2008 Indiana amendmenis. Truss to girder connection 1/4" or less Solid
Bearing.
FC CM Tmss Drawings and print hung in Garage
FC CM Girder tmss 6earing is complete to foundation
Freme, House Interior
FC CM Garage to house door sel with wrrect reveal 6 shims total
FC CM Bowed studs checked and marked in orange on the stud and floor with a B
FC CM Check each room per print for wall and door opening placement
FC CM Check each room for window placement.
FC CM Check walls for plumpness mark correc[ion using OOP OOL
Windows centered in the opening shim sides if needed window to sit on sill with 1/8 bumper on bottom. Does the
FC CM window operate smoothly
FC CM Mark each doorway with correct door size and swing Example of how to mark... 2/6 RH with an armw.
FC CM Mark in writing if an opening wraps in drywall wright the word out Drywall wrap or do not drywall or Wood wrap.
FC CM Add cabinet dimensions to verify correct wall lengih
FC CM Layout CL of range hood location vertical and horizontal.
FC CM Layout cabinet bcations in kitchens and baths. Veriry correct space for cabinets
FC CM Think about outleUswitch location in kitchen. Are all location either under cabinets or outside of cabinets? This has
to do with backsplash tile
FC CM Think about the locations for the outlets in bathrooms, no outlets in side splashed or behind mirrors.
Check % wall height to be certain it is tall enough to allow casing and vaniry side splash to not intertere same
FC CM applies in home offce area
FC CM Check to be sure toilet and shower drains do not interfere it the Joisl locations
FC
FC
FC
CM Verify correct walls or no walls are installed at stairway, walls vs rails.
CM Check floor joist layout for correct placement
CM Check roof truss layout for correctness
Check for correcl imss bracing, note you will need truss drawings for ihis. Additionally corred ovetlapping is
CM required at brace connections
CM Shower pan blocking is in place
CM SNd placement in a shower bcation is to be no more ihan i6 inches O.0
CM Drywall nailers are in place in comers all locations
Drywall nailers are in place at ceilings. Parallel wall to Irusses should be cross blocked 2 foot OC laid out for drywall
CM placement
CM Floor decking nailed and glued Nails 4 in the field 6 on the seams missed nails need pulled
CM Floor joist are nailed and glue is present in hangers
-" iplete
RELEASED FOR CONSTRUCTION s from back of siringer. No visible nails from the top.
Su6ject to compliance with all regulations ends 1/8 to'/. inch. Nailed 4 in the field 6 on the edge
of State and Lacal Codes with 3 places each side for a 6/8 door 4 each for a taller door or a door with a
FC
FC
FC
FC
FC
FC
FC
City of Cannel
'-!��,m��u l�xrA'v+n%1
DATE: 05�06�20
ngs will be 36 inches.
for tub shower & 34 inches for fberglass shower)