Loading...
HomeMy WebLinkAboutGN2Frame Check Basement FC CM Post plumb and tabs wrepped around lhe top FC CM Post locations are correct, point loads from above in floor system inslalled FC CM Beam is bearing in pocket at least 3 inches FC CM Squash block are in place fmm over beam if there is a load bearing wall above. FC CM No visible gaps in basement rim board FC CM Roor joist laid out per print, LVL beans if needed are located in correct location. FC ,, CM Look for nails ihat have missed the joist and remove them FC CM Joist hangers are secure with correct nails and joist are glued Straps at bottom plate secured with 2 nails each strap on top and spaced 12 inches from plate ends and corners 6 FC CM feet on center. FC CM Basement is dean no debris Basement stairs are shimmed % inch from walL There are no visible nails from top through stringer. All nails are FC CM driven lhmugh 2x fmm under s[airs. 3 Nails per step. FC CM Stair Head height is correct A1 minimum 6'8 inches in a plane diagonal line to stair header plumb. FC CM Nosing not at top of stairs at frst floor but is present and basement landing if stair case has a landing Basement wall at basement landing is furred out with 2x material and wall is covered with insulation board or house FC CM wrep. This depends on ihe space available. FC CM Unfinished basement stair walls have 2x4 stud's i 6 inch OC on all 3 sides to close accessibility FC CM Basement wall secured to floor with wncrete nails and walls are plumb. Finished Basement FC CM Door opening plumb and marked with 2 inch over call size of door 2 inches taller FC CM 2x4 studs 16 inches OC treated bottom plate FC CM Drywall nailers present in in comers and at ceiling FC CM All unfnished space must have a door opening into the area. FC CM Bulkheads build shall be no lower than 7' 1 inch from concrete floor. FC CM Fire block weed cap above framed wall filling gap to bottom of joists. Daylight Walkout Basement FC CM To ihe bottom of a daylight window there in nol more than 42 inches to the opening. 100 % braced sheathing used. Wall must meet bracing requiremenis of 2008 IRC. This means consideration for full FC CM 4 foot sheets. Wall cannot be all windows. Pmper nailing pattem of breced sheathing. FC CM Sill sealer is located under exterior walls. Walls are bolted per the 2008 IRC 17' plate ends 6'OC FC CM Any stud dislance from concerate wall & each step wall face will need to have concrete wall insulation inslalled. Exterior FC CM All horizontal seams flashed with house wrap a minimum of 6 inches hanging out FC CM Holes and wts in sheathing repair by tape or damaged sheathing replaced Window lape install on 3 sides, 2 sides frst and [op last Top must be even pasi the sides. No tape or sealer on FC CM bottom. FC FC FC FC CM Over hangs on home wrrect per prinL Eyebrows installed per print CM Windows correct per print and are in alignment CM Exteriortrim to be installed no closerto a shingled roofthan 1 inch. Accountforshinglethickness CM All trim installed has the vertical ran past Ihe horizontal at the intersections. All horizontal smart Irim used in board and batten style application must be installed prior to MDF board and have drip cap installed over the horizontal 5/4 trim board. Board batten panel is to be installed behveen ihe horizontals CM with'/. trim over MDF to create Ihe vertical. CM Azeck Uim installed at under doors on basement homes CM ix2 him installed at horizontal brick iransitions Window mantles install with Ice and water behind. Ice and water to extend 6 inches past sides and top and is taped CM at top CM House wrap install with ovetlaps of 6 inches horizontal and vertical CM Vertical seams of house wrep need taped with correct brend seathing tape CM House warp install on all inside & outside corners CM House wrap install with cap nails no more ihal32inch square Raptor roof paper installed professionally verticle laps are to be a minimum of 4 inches, horizontal laps 6 inches, CM cap nails at seams 12 inches OC 24 inch cap nails on seams. CM Raptor paper to be installed �o crea�e a valley ihat sheds water by laps CM Roofer to install roof edge under raptor at eaves and over paper gables. Plan nail placement accordingty CM Roof less than 4/12 must have 2 layers of felt. CM Exterior door trim to be taped as windows. CM Exterior doors to be sat on rubber membrane that drapes to ihe exterior CM Rubber membrane to be installed so aker concrete is poured it will be belween the concrete and the house CM Gutter overhang or porch tiding back to verticle wall should have Ice 8 Water installed @ iransition. FC FC FC FC FC FC FC FC FC FC FC FC FC FC FC FC Notes: RELEASED FOR CONSTRUCTION Su6ject to compliance with all regulations of State and Lacal Codes City of Cannel i- '�I��m� W�lanrA'v� DATE: 05�O6�ZO