HomeMy WebLinkAboutMorphey/Eng/CO #3/4,403.02/FINAL-Duke_Energy_Relocation_Plans_Phase_1&3__17-ENG-01 DocuSign Envelope ID:22D7DD4D-C757-4C12-B8AC-E5439AD0E66E City of Carmel Project 17- ENG -01 Duke Energy Relocation Plans Phase 1&3 CHANGE ORDER #3, FINAL Balancing/Reconciliation for Pay Items 1 through 107 Contract Price prior to this Change Order $2,707,726.24 Contract Price will be increased/decreased by this Change Order $4,403.02 New Contract Price including this Change Order $2,712,129.26 Amount Adjusted Contract Cumulative%Change Price from Original Contract Original Contract $2,627,746.00 $2,627,746.00 N/A l CO1 $19,264.93 $2,647,010.93 0.7% I CO2 $60,715.31 $2,707,726.24 3.0% CO3, FINAL $4,403.02 $2,712,129.26 3.2% DocuSign Envelope ID:22D7DD4D-C757-4C12-B8AC-E5439AD0E66E CITY OF CARMEL TO: Morphey Construction,Inc. CONTRACT CHANGE ORDER NO.:3 1499 N Sherman Dr DATE; 1/27/2020 Indianapolis,IN 46201 PROJECT NAME; 17-ENG-01 Duke Energy Relocation Plans Phase I&3 CITY REQ.NO.: CITY PO NO.: 100743 CITY PO DATE:9/21/17 i. You are directed to make the fallowing changes in this Contract: Add additional items due to modifications in the field and requests from Carmel Utility Departments. SCHEDULED ADJUSTMENT ITEM AMOUNT {+t OR(-t DAYS *See detail of items and summary of changed costs in attached Table TOTAL OF CHANGE ORDER ITEMS I $4,403.02 135 Days II. The following referenced Documents further describe the changes outlined in Paragraph I, and are to be considered a part of this Change Order:R.F.P.: n/a W.D.C.NO.; n/a Other:_By Request from the City of Carmel per proposals included herein The changes result in the following adjustment of Contract Price and Contract Time Contract Price prior to this Change Order $2,707,726.24 Contract Price will be increased by this Change Order S 4.403.02 New Contract Price including this Change Order $2,712,129.26 Contract Time prior to this Change Order 131 Days June 16 2018 Completion Date Net increased resulting from this Change Order 135 Days Current Contract Time including this Change Order October 19 2018 Completion Date This Change Order is for full and final settlement of all direct,indirect,impact costs and time extensions incurred at any time resulting from the performance of the changed work, The Above Changes Are Recommended The Above Changes Are Accepted Approved DocuS:g n�eQd.��b,,y: I icumt,S b aiD AY'/1t. CROSSROAD ENGINEERS Morphe,Construction fill Jas�ress) ataazi,.. ENGINEER CONTRACTOR 3417 Sherman Drive 1499 N Sherman Dr e Address Address ;AWU !leech Grove,IN 46107 Indianapolis,IN 46201 t� tpy e,Member City/State/Zip City/State/Zip (Afriig{ r�/ 1oocAos��"�"3a..ember By:_ :I...`� fey: Justen Hochstetler ,�-ei�r/°-4(l Ovate ,jata,t,S braiinuVt Phone: 31:7-780-_1.555 Phone: 317-716-6719 _ tte6Waligang,Clerk Date: 1/27/20 Date; /-2 —ZO Date: 5/6/2020 DocuSign Envelope ID:22D7DD4D-C757-4C12-B8AC-E5439AD0E66E I7-ENC-0I Duke Energy Relocation Plans Phase 1&3 CHANGE ORDER#3 TABLE Item Original Original Final No. Description Unit Unit Price Final Amount Over/Under Quantity Amount Quantity 3 Office Equipment MO 5 1,000.00 3 S 3,000.00 0 5 • S (3,000.00) 6 Excavation,Common CYS $ 60.00 888 $ 53,280.00 1059 33 5 63,559.80 5 10,279.80 8 _Storm Water Quality Management Budget DOL $ 1 A0 5000 5 5,000.00 3482.5 5 3,482.50 S (1,517.50) 9 Subgrade Treatment,IV SYS 5 39.00 1962 $ 76,518.00 1830.6 5 71,393.40 5 15,124.60) 10 Structural Backfill,Type I CYS_ $ 94.00 172 5 16.168.00 142.43 $ 13,388.42 5 12379.58) 1 1 Removable Flowable Fill for Street Cut Repair CYS $ 100.00 3180 S 318,000 00 9.5 5 950.00 5 (317.050 00) 12 12"Concrete Cap for Street Cut Repair SYS S 9000 1385 5 124,650.00 1150,4 S 103,536.00 S (21,114.00) 13 Compacted Aggregate Base,No_53 Stone TON S 50.00 653 $ 32,650.00 1006.72 5 50,336.00 $ 17,686.00 14 Asphalt Milling,15" SYS $ 2.30 3958 5 9,1.03.40 4247 $ 9,768.10 5 664,70 15 HMA Surface,Type'C',9 5 mm TON $ 75.75 464 5 35,148.00 581.68 S 44,062.26..5 8,914.26 16 I-Lrv1A Intermediate,Type'C',19.0 mm TON 5 70.25 155 $ 10,888.75 243.75 $ 17,123.44 5 6,234.69 17 HMA Base,Type'B',25.0 mm TON 5 62.50 234 5 14,625.00 344.02 $ 21,501.25 5 6,876.25 18 Asphalt for Tack Coat TON $ 1.00 5 5 5.00 0 S - S (5.00) 19 Sidewalk,Concrete,4 in. SYS 5 70.00 895 S 62,650,00 851.47 5 59,60290 5 (3,047 10) 20 Curb Ramp,Concrete,Includes Detectable Warning Elemer SYS 5 250.00 104 5 26,000.00 124.51 S 31,127.50 S 5.12750 21 Curb and Gutter,Concrete,Type 11 LFT 5 38.00 1048 S 39,824.00 1589.4 S 60,397_20 5 20,573.20 22 Curb and Gutter,Concrete,Type Ill LET 5 46.00 201 5_ 9,246.00 22 5 1,012.00 $ (8,234.00) 23 Straight Concrete Curb LET $ 54.00 68 $ 3,672.00 11.5 S 621.00 $ (3.051.00) 24 PCCP for Approaches,9" SYS $ 160.00 99 $ 15,840.00 106.5 5 17,040.00 $ 1,200.00 25 Topsoil(undistributed) CYS $ 80.00 467 S 37,360 00 243 S 19,440.00 $ (17,920.00) 26 Sodding,Nursery SYS_ $ 1000 2802 5 28,020.00 2309 $ 23,090.00 5 (4,930.00) 27 Mobilization and Demobilization for Sodding EA 5 15000 2 $ 300.00 1 S 150.00 $ (150.00) 28 Pipe,Type 2,Circular,12" LFT 5 80.00 1 13 $ 9,040.00 91 5 7,280 00 5 (1,760,00) 29 Pipe,Type 2,Circular,15" LFT $ 100.00 84 5 8,400.00 120.5 5 12,050.00 $ 3,650.00 30 Pipe,Type 2,Circular,18" LET $ 120.00 23 $ 2,760.00 69.5 S 8,340.00 S 5,580.00 31 Pipe,Type 2,Circular,48" LFT 5 160.00 56 5 8,960.00 34 5 S 5.520.00 5 (3,440.00) 32 Pipe,Type 2,Elliptical,22"x34" LFT $ 150.00 272 $ 40,800.00 0 S - $ (40,800.00) 35 22"x34"Pipe End Section,Concrete EA S 2,00000 I S 2,000.00 0 _ S - 5 (2.000.00) 38 Manhole,Type'C' EA 5 2,700.00 3 S 8,100.00 9 $ 24,300.00 S 16,200.00 39 Manhole,Type']' EA S 4,200 00 2 5 8,400.00 0 $ - $ (8,400.00) 42 6'Concrete Lined Channel LFT $ 150.00 50 $ 7,500.00 0 5 - S (7,500.00) 43 Sign Post,Square,Type I,Reinf.Ane.Base LET 5 27.00 40 S 1,080.00 44 5 1,188.00 5 108.00 44 Relocate Existing Sign EA 5 400.00 3 5 1,200.00 4 S 1.600.00 5 400.00 47 Guardrail LET S 75.00 193 $ 14,475.00 203 5 15,22500 5 750.00 49 L ht Pale Relocation EA_S 4,500.00 2 5 9,000.00 1 5 4,500.00 5 (4,500.00) 53 4'x4'x4'Split Communications Box EA S 5,000.00 21 $ 105,000.00 3 S 15,000.00 S (90,000.00) 54 Communication Duct Bank LFT $ 70,00 3156 5 220,920.00 0 S - $ (220,920.00) 55 Trans.Iv1rk,Thermo,Stop Bar,24" LFT 5 12.00 38 $ 456.00 45 $ 540.00 S 84.00 56 Line,Thermo,Solid,Yellow,4" LET $ 2.00 95 $ 190.00 178 S 356.00 5 166.00 58 Line,Thermo,Solid,White,6" LFT $ 5.00 157 5 785.00 0 $ - S (785.00) 59 Lane Indication Arrow,White,Thermoplastic.Transverse's EA S 300,00 4 5 1,200.00 1 S 300.00 S (900.00) 60 Duke Energy Transmission Duct Bank LFT S 275.00 2753 S 757,075.00 278$ $ 766,700.00 S 9,625.00 63 PCCP,Class A Concrete for Clay Paver Base SYS 5 240.00 38 S 9,120.00 34 S 8,16D 00 S (960 00) 65 Pipe,Type 2,Circular,24 in. LFT 5 10900 0 $ - 85 S 9,265.00 $ 9,265.00 66 18"Pipe End Section,Concrete EA 5 1,801.68 0 5 I S 1,801.68 $ 1,801.68 67 24"Pipe End Section,Concrete EA S 1,920.03 0 S - I S 1,920.03 5 1,920.03 68 24"Handhole EA $ 2,806.74 0 $ - 6 5 16,840.44 $ 16,840.44 69 1.25"Conduit for Carmel Communications LET S 19.96 0 5 - 436 $ 8,702.56 $ 8,702.56 71 36"Handhole EA 5 3,428.55 0 5 - 2 $ 6,857 10 $ 6,857.10 72 Duct Spacer additional cost LS 5 15,372.20 0 _ $ - 1 5 15,372 20 5 15,372.20 73 Updated Communication Duct Bank LFT S 61.59 0 $ - 2128 $ 130,957.12 5 130,957.12 74 Concrete Footer Removal(11/13,17) LS S 1,234.00 0 5 - I S 1,234.00 $ 1,234.00 75 Temporary Asphalt Ramp at Veterans Way approach at Ran LS 5 2,475 00 0 5 - 1 S 2,475.00 S 2,475.00 76 Sanitary Lateral Repairs throughU23i18 LS 5 2,143.00 0 5 - l S 2,14300 5 2,143.00 77 Duct Trench Backfill(First Payment) CY $ 70.03 0 S - 2055 S 143,911.65 S 143,911.65 78 Duct Trench Backfill(Second Payment) CY $ 85.55 0 S 929 S 79,475.95 S 79,475.95 79 Duke Vault Castings Extra Cost LS $ 3,619.00 0 S - I 5 3,619 00 $ 3,619.00 80 Sanitary Lateral Repair&Conflict;ui Sta.23.50 LS 5 8,627.89 0 S - I S 8,627.89 S 8,627.89 81 Riprap&Geotextiles LS 5 2,001.24 0 $ - 1 S 2,001.24 5 2,001 24 82 Additional Construction Engineering LS _5 550.00 0 $ - € 5 550.00 $ 550 00 83 8"Sanitary Main Stub LS 5 5,466.45 0 $ - I 5 5,466.45 $ 5,466.45 84 Geogrid for Undercut CYS 5 4.00 0 5 - 1028 S 4,112.00 5 4,112.00 DocuSign Envelope ID:22D7DD4D-C757-4C12-B8AC-E5439AD0E66E 17-ENG-01 Duke Energy Relocation Plans Phase 1&3 CIIA\GE: ORDER#3 TABLE Item Original Original Final No. Description Unit Unit Price Final Amount Over/Under Quantity Amount Quantity 85 Cannel Fest Electrical Boxes LS $ 9,800_00 0 S - I $ 9,800.00 5 9,800 00 87 Duct Realignment additional Construction Engineering LS S 1,275.00 0 S - I $ 1.275 00 $ 1,275.00 88 Duct Realignment additional MOT(First Payment) LS S 6,750 00 0 S • I 5 6,750,00 $ 6,75000 89 Duct Realignment Groves additional Cost LS 5 20,015.00 0 S - I S 20,015.00 S 20,01.5.00 90 Duct Trench Backfill(Third Payment,May&June) LS $ 53,521.97 0 S 1 5 53,521.97 S 53,521.97 91 Water Main Bell Restraint and repairs LS $ 20,812 35 0 S - I S 20,812.35 S 20,812.35 93 Duke Trench Overexcavation LS $ 33,882.39 0 S - I 5 33,882 34 S 33,882.39 94 Proscenium Fence repair LS S 1,II8_80 0 S - I $ 1,118.80 $ 1,118.80 95 Carmel Drive Additional Concrete Mobilization LS 5 3,771.95 0 S - I S 3,771.95,$ 3,771.95 96 Fire Station Dumpster Pad LS $ 4,763.08 0 S 1 S 4,763.08 S 4,763.08 97 Fire Station Parking Lot Lighting Repair LS S 2,363 06 0 5 • 1 S 2,363.06 $ 2.363.06 48 Carmel Drive Lighting Conduit Repair LS S 1,222.68 0 S 1 5 1,222.68 $ 1,222.68 99 Irrigation East of Veterans Way by City Hall LS S 5,826.56 0 S - ! S 5.826.56 S 5,826.56 100 Duct Backlit!Testing LS $ 10,278.64 0 S - I S 10,2.78.64 5 10,278 64 101 Duct Realignment-Loss of Production LS S 10,000 40 0 S I S 10,400 04 S 10,000.00 102 Duct Realignment-Weekend Premium LS $ 3,000.00 0 5 - I S 3,000.00 5 3,000.00 103 ,Duct Relignment-Additional 1vIOT(Second Pa}mern) LS $ 10,186.90 0 $ • 1 S I0,I8690 $ I0,186.90 104 Additional Structure Casting and Setting LS $ 2.000.04 0 $ - I S 2,000.00 S 2,000.00 105 Self Storage Restoration LS S 7,13208 0 S - I S 7,13208 5 7,132.08 106 Parking Lot and Inlet Modification LS S 4.930 90 0 S - I S 4,930.90 $ 4,930.90 107 Miscellaneous Extra Work LS $ 2,187.73 0 $ E $ 2,187.73 S 2,187.73 TOTAL OF CHANGE ORDER ITEMS S 4,403.02 CONTRACT PRICE PRIOR TO CHANGE ORDER S 2,707,726.24 CHANGE ORDER 43 S 4,403.02 NEW CONTRACT AMOUNT INCLUDING APPROVED CHANGE ORDERS S 2,712,129.26 DocuSign Envelope ID:22D7DD4D-C757-4C12-B8AC-E5439AD0E66E 17-ENG-01 Duke Energy Relocation Plans Phase 1&3 EXHIBIT A You have heeu directed to make the'Awning changes in this Contract: item No Description Reason For Change 3 Office Equipment item not used 6 Excavation,Common adjusted to balance original quantities versus actual quantities used for original items 8 Storm Water Quality Management Budget adjusted to balance original quantities versus actual quantities used for original items 9 Subgrade Treatment,IV adjusted to balance original quantities versus actual quantities used for original items 10 Structural Backfill,Type I adjusted to balance original quantities versus actual quantities used for original items 11 Removable Plowable Fill for Street Cut Repair intended to be thermal flowable fill:paid under item 92. 12 12"Concrete Cap for Street Cut Repair adjusted to balance original quantities versus actual quantities used for original items 13 Compacted Aggregate Base,No.53 Stone quantity increased due to large undercut for road adjacent to pond 14 Asphalt Milling, 1.5" adjusted to balance original quantities versus actual quantities used for original items 15 HMA Surface,Type'C',9.5 min adjusted to balance original quantities versus actual quantities used for original items 16 HMA Intermediate,Type'C', 19.0 nun adjusted to balance original quantities versus actual quantities used for original items 17 HMA Base,Type'13',25.0 mm adjusted to balance original quantities versus actual quantities used For original items 18 Asphalt for Tack Coat item used but no tickets received for item so no payment was made 19 Sidewalk,Concrete,4 in. adjusted to balance original quantities versus actual quantities used for original items 20 Curb Ramp,Concrete,Includes Detectable Warning Elements adjusted to balance original quantities versus actual quantities used for original items 21 Curb and Gutter,Concrete,Type 11 quantity increased due to replacing of Type Ill Curb and Gutter:additional curb replaced at Carmel Drive 22 Curb and Gutter.Concrete,Type III quantity decreased due to being replaced by Type If Curb and Gutter 23 Straight Concrete Curb adjusted to balance original quantities versus actual quantities used for original items 24 PCCP for Approaches,9" adjusted to balance original quantities versus actual quantities used for original items 25 Topsoil(undistributed) adjusted to balance original quantities versus actual quantities used for original items 26 Sodding,Nursery adjusted to balance original quantities versus actual quantities used for original items 27 Mobilization and Demobilization for Sodding adjusted to balance original quantities versus actual quantities used for original items 28 Pipe,Type 2,Circular, 12" adjusted to balance original quantities versus actual quantities used for original items 29 Pipe,Type 2,Circular,15" adjusted to balance original quantities versus actual quantities used for original items 30 Pipe,Type 2,Circular,18" adjusted to balance original quantities versus actual quantities used for original items 31 Pipe,Type 2,Circular,48" adjusted to balance original quantities versus actual quantities used for original items 32 Pipe,Type 2,Elliptical,22"x34" item not used 35 22"x34"Pipe End Section,Concrete item not used 38 Manhole,Type'C' adjusted to balance original quantities versus actual quantities used for original items 39 Manhole,Type'1' adjusted to balance original quantities versus actual quantities used for original items 42 6'Concrete Lined Channel item not used 43 Sign Post,Square,Type 1,Reinf Anc.Base adjusted to balance original quantities versus actual quantities used for original items 44 Relocate Existing Si:n acTusted to balance original uantities versus actual .uantities used for ori inal items 47 Guardrail adusted to balance on•inal •uantities versus actual•uantities used for oil.final items 49 Light Pole Relocation adjusted to balance original quantities versus actual quantities used for original items 53 4'x4'x4'Split Communications Box quantity decreased due to most boxes being replaced by items 68&71 54 Communication Duct Bank item replaced by item 73 due to reconfiguration of communication duct bank 55 Trans.Mrk,Thermo,Stop Bar,24" adjusted to balance original quantities versus actual quantities used for original items 56 Line,Thermo,Solid,Yellow,4" adjusted to balance original quantities versus actual quantities used for original items 58 Line,Thermo,Solid,White;6" adjusted to balance original quantities versus actual quantities used for original items 59 Lane Indication Arrow.White,Thermoplastic. adjusted to balance original quantities versus actual quantities used for original items 'transverse Marking 60 Duke Energy Transmission Duct Bank quantity increased due to realignment of Transmission duct hank at Carmel Dr 63 PCCP,Class A Concrete for Clay Paver Base adjusted to balance original quantities versus actual quantities used for original items 65 Pipe,Type 2,Circular,24 in. added to accommodate Proscenium development site drainage 66 18"Pipe End Section,Concrete added to accommodate Proscenium development site drainage 67 24"Pipe End Section,Concrete added to accommodate Proscenium development site drainage 68 24"Handhole added to replace most of item 53 69 1.25"Conduit for Cannel Communications added due change from solar power flasher to hardwired connection to fire station 71 36"Handhole added to replace some of hem 53 72 Duct Spacer additional cost added due to Duke specifications for duct configuration dimensions not taking thickness of conduit into account DocuSign Envelope ID:22D7DD4D-C757-4C12-B8AC-E5439AD0E66E • l7-E,\'G-0l Duke Energy Relocation Plans Phase I&3 EXHIBIT A You have been directed to make the following changes in this Contract: Item No. Description Reason For Change 73 Updated Communication Duct Bank added to replace item 54 74 Concrete Footer Removal(1 1!13.'17) added due to additional work of removing unforeseen foundation west of police station Temporary Asphalt Ramp at Veterans Way approach at added to provide access to City(tall from Rangeline due to it not being ready as part 73 Rangeline(1 Ir20 17) of the Rangeline project and commencement of duct work which shut down access to City Hall from the north 76 Sanitary Lateral Repairs through U23118 added due to repair of unforeseen sanitary laterals 77 Duct Trench Backlit!(First Payment) added to account for structure hackfill of Duke ducts that was to be included in duct price but was not clear in Duke specifications 78 Duct Trench Backfill(Second Payment) added to account for stntcture backfill of Duke ducts that was to be included in duct price but was not clear in Duke specifications 79 Duke Vault Castings Extra Cost added due to unique castings not known at the time of bid 80 SanitaD•Lateral Repair&Conflict Sta.23+50 added due to repair of unforeseen sanitary laterals 81 Riprap&Geotextiles added due to storm redesign post bid 82 Additional Construction Engineering added due to changes in planned storm and duct alignment 83 8"Sanitary Main Stub added due to redesign post bid 84 Geogrid for Undercut added due to undercut of unsuitable subgrade of proposed roadway adjacent to pond 85 Carmel Fest Electrical Boxes added at the request of the city 87 Duct Realignment additional Construction Engineering added due to realignment of transmission duct bank at Cannel Dr 88 Duct Realignment additional MOT(First Payment) added due to realignment of transmission duct bank at Cannel Dr 89 Duct Realignment Groves additional Cost added due to realignment of transmission duct bank at Carmel Dr 90 Duct Trench Backfill(Third Payment,May&June} added to account for structure backfill of Duke ducts that was to be included in duct price but was not clear in Duke specifications 91 Water Main Bell Restraint and repairs added due to water main break beyond the control of Mo phy 93 Duke Trench Overexcavalion added due to lowering of duct in Carmel Dr due to utilities 94 Proscenium Fence repair added due to removal and replacement of construction fence which Proscenium contractor had installed for their proposed work 95 Cannel Drive Additional Concrete Mobilization added mobilization due to access issues delaying work atlnear Storage Depot beyond the control of contractor 96 Fire Station Dumpster Pad added due to unforeseen dumpster pad replacement 97 Fire Station Parking Lot Lighting Repair added due to repair of unmarked lighting conduit north of fire station 98 Carmel Drive Lighting Conduit Repair added due to repair of unmarked lighting conduit on the south side of Cannel Dr 99 Irrigation East of Veterans Way by City Hall added due to repair and replacement of unmarked irrigation along Veterans Way at City Hall 100 Duct Backlit'Testing added due to previously unspecified testing of Transmission Duct backlit!by Alt& Witzig 101 Duct Realignment•Lass of Production added due to realignment of transmission duct bank at Carmel Dr because of land acquisition for original alignment falling through 102 Duct Realignment-Weekend Premium added due to realignment of transmission duct bank at Carmel Dr because of land acquisition for original alignment falling through 103 Duct Reiignmenr-Additional MOT{Second Payment) added due to realignment of transmission duct bank at Carmel Dr because of land acquisition for original alignment falling through 104 Additional Structure Casting and Setting added due to discovery of buried storm sewer;structure supplied by city • 105 Self Storage Restoration added to restore Self Storage underdrain and portion of drive 106 Parking Lot and Inlet Modification added to alleviate drainage problem on the southeast corner of the City Hall parking lot 107 Miscellaneous Extra Work added to fix existing sidewalk drainage north of City I fall.clean out existing inlet and add casting riser to existing Sanitary structure