HomeMy WebLinkAboutH-101 - HVAC PLANSx
B
B-2
B-3
B-4
B-5
x-2
B-6
B-7
B-8
B-9
B-10 C
B-11
B-12
B-13
B-14
2
3
A
4
1
B
FCU-1 FCU-21
1
2
3
A
4
1
B
2
H-501
2
2
REFER TO 1/H-501 FOR
ADJACENT ROOF
ROUTE REFRIGERANT LINES TIGHT TO
ROOF PERLINGS. SUPPORT AT 5' O.C.
4
2
3
A
4
1
B
EWH-1EWH-1
EWH-1
EWH-1
EWH-1 EWH-1
2
H-501
3
3
3
3
3
3
CIVIL, LIGHTING AND ELECTRICAL DESIGN CONSULTANTS
HEATING, VENTILATION, AIR CONDITIONING, PLUMBING, FIRE PROTECTION,
9229 DELEGATES ROW SUITE 150 INDIANAPOLIS, IN 46240 (317) 781-6200
CIRCLE DESIGN GROUP
19092
Project:
Developer:
Sheet Number:
Engineer:
By:
Sheet Title:
CDG Number:
Last Revision Date:
Set Issue Date
Drawn By Checked By
Sheet Issue DateHolland / Playfair BuildingsCarmel, IN 46032Construction Documents120 West Monon Green Blvd.H-101
HVAC PLANS
09/23/201909/23/2019
Ross MaueThomas Kennedy
1/4" = 1'-0"
FIRST FLOOR HVAC PLAN1
1/4" = 1'-0"
SECOND FLOOR HVAC PLAN208'4'2'
0 8'4'2'
SHEET PLAN NOTES
1 CASED FAN COIL UNIT MOUNTED IN STRUCTURAL SPACE. REFER TO SECTION
FOR MOUNTING HEIGHT.
2 REFER TO E/H-501 FOR CONNECTION TO DOWNSPOUT.
3 AS ALTERNATE BID, MOUNTED WALL HEATER FIT IN PANEL. REFER TO
ARCHITECT'S PLAN FOR EXACT MOUNTING HEIGHT.
4 CONDENSATE DRAIN PIPING TO BE 1" GALVANIZED SCHEDULE 40 STEEL.
1/4" = 1'-0"
SECOND FLOOR HVAC PLAN - ALTERNATE308'4'2'