Loading...
HomeMy WebLinkAboutH-501 - HVAC SCHEDULESELECTRIC HEAT FAN COIL UNIT SCHEDULE MARK LOCATION CONFIGURATION FAN DATA HEATING COIL DATA DX COOLING COIL DATA FILTER DATA UNIT CONNECTION DATA UNIT WEIGHT (LBS) MANUFACTURER WITH MODEL NUMBER NOTESAIRFLOW (CFM) OUTDOOR AIRFLOW (CFM) ESP TYPE MBH EAT LAT TOTAL MBH SENSIBLE MBH EAT LAT TYPE MCA VOLTS PH DB WB DB WB FCU-1 SEE PLANS HORIZONTAL 979 0 0.0 DIRECT 20.5 70.0 89.4 29.3 23.4 75 61 53.5 50.2 1" MERV 8 38.4 208 1 164 TRANE FCD-08 FCU-2 SEE PLANS HORIZONTAL 979 0 0.0 DIRECT 20.5 70.0 89.4 29.3 23.4 75 61 53.5 50.2 1" MERV 8 38.4 208 1 164 TRANE FCD-08 NOTES: 1. 2. CONDENSING UNIT SCHEDULE MARK LOCATION NOMINAL TONS DESIGN AMB TEMP MIN. EER ELECTRICAL DATA LIQUID LINE VAPOR LINE UNIT WEIGHT (LBS) MANUFACTURER WITH MODEL NUMBER NOTES MCA MOCP VOLTS PH CU-11 HOLLAND ROOF 3 95 / 30 13 24 35 208 1 3/8" 3/4" 283 TRANE 4TTR7036A CU-12 HOLLAND ROOF 3 95 / 30 13 24 35 208 1 3/8" 3/4" 283 TRANE 4TTR7036A NOTES: 1. 2 ELECTRIC UNIT HEATER SCHEDULE - ALTERNATE ONLY SPECIFICATION SECTION 238201 MARK LOCATION CONFIGURATION AIRFLOW (CFM) HEATING DATA ELECTRICAL DATA ACCESSORIES MANUFACTURER WITH MODEL NUMBER NOTESMIN KW MBH RISE FAN HP AMPS VOLTS PH DISCONNECT SWITCH INTEGRAL THERMOSTAT WALL BRACKET EWH-1 SEE PLANS WALL 100 2.0 6.8 63.2 - 9.6 208 1 YES YES NO QMARK AWH4408F 1 NOTES: 1.PROVIDE SURFACE MOUNTING KIT. ROOF INSTALL CURBS PER NRCA AND MFGRS RECOMMENDATIONS EQUIPMENT SUPPORT CURB OR RAIL (TYPICAL) WOOD NAILER FIELD APPLIED CANT EQUIPMENT BASE REFER TO STRUCTURAL DWGS FOR SUPPORT ATTACHMENT TO STRUCTURE BELOW 1-1/4" WIDE METAL STRAPPING THICKNESS TO BE .031" ROOF, SEE ARCH PLANS FOR DETAILS PROVIDE 2X6 WOOD BLOCKING BELOW CURBS (TYPICAL) CONDENSING UNIT CAULK OR GASKET 2" -#14 LAG BOLTS PROVIDE 2 PER SIDE NOTES: 1.PROVIDE 2 -1-1/4" WIDE METAL STRAPS OVER TOP OF UNIT, ONE ON EACH SIDE. STRAPS SHALL BE ANCHORED TO EQUIPMENT RAILS AT THE BASE. STRAPS SHALL BE PRIMED AND PAINTEDWHITE, 2 COATS EACH MINIMUM, ON BOTH SIDES PRIOR TO INSTALL. 2.PROVIDE 2 -#14 LAG BOLTS, SPACED 5/8" APART, AT THE END OF EACH METAL STRAP. BOLTS SHALL GO THROUGH METAL STRAPPING AND INTO WOOD NAILER OF EQUIPMENT RAILS TO ANCHOR UNIT TO EQUIPMENT RAILS. 3.STRAPS SHALL BE PLACED A MINIMUM OF 3" IN FROM TOP EDGE OF UNIT. 4.STRAPPING SHALL BE VERIFIED BY EQUIPMENT MANUFACTURER TO ENSURE ADEQUATE RESTRAINT OF SUPPLIED EQUIPMENT AT 115 MPH WIND LOAD. ANY DEVIATIONS FROM ABOVE MUST BE SUBMITTED TO ENGINEER FOR REVIEW. CONDENSING UNIT 1-1/4" WIDE METAL STRAPPING THICKNESS TO BE .031" 2" -#14 LAG BOLTS PROVIDE 2 PER SIDE CAULK OVER BOLT HEAD(S) ROOF MEMBRANE PIPE INSULATION BASE GALVANIZED CHANNEL SECURE PIPING TO SUPPORT WITH STRAP 1' - 4" 3' - 0"0' - 8"0' - 4"SEAL CAVITY WITH MINERAL WOOL INSULATION. REFRIGERANT PIPING TO CONDENSING UNITS ON EACH SIDE. POWER WIRING AND REFRIGERANT PIPING FROM BUILDING UP THROUGH ROOF IN CUSTOM SHEET METAL ENCLOSURE. FILL CAVITY WITH INSULATION.3' - 0"1' - 6"ATTACH TO WOOD NAILER EVERY 3" REFRIGERANT LINES COOLING COIL CONDENSATE FAN COIL UNIT THREADED ROD, UNISTRUT AND NEOPRENE ISOLATION HANGER PROVIDE ADDITIONAL RESTRAINT AS REQUIRED BY SEISMIC DESIGN. CONDENSING UNITS INCLUDED IN SKYBRIDGE PROJECT CU-1-210 CU-1-310 CU-1-410 CU-1-510 HP-1-307 HP-1-507HP-1-407 HP-1-207 CU-1-408 CU-1-508CU-1-308 CU-1-208 CU-11 CU-11 B/H-501 D/H-501 SECOND FLOOR FRAMING 116' -0" BRIDGE ROOF 125' -4 1/2" 23 FCU-1 1" CONDENSATE AND P-TRAP MOUNT AT 7'9" ABOVE FINISHED FLOOR INSULATED REFRIGERANT LINES TIGHT TO STRUCTURE SPRINKLER PIPE. REFER TO FIRE PROTECTION DRAWINGS FOR PLACEMENT AND SIZE. MOUNT INBETWEEN STRUCTURE AT 8'1" 1.5 RADIUS ELBOWS CONDENSATE SLOPED AT 1/8" PER 1'-0" INSULATION AND ALUMINUM JACKETING ON EXTERIOR OF STRUCTURE DOWNSPOUT PROVIDED BY OTHERS COORDINATE FITTING SIZING WITH OTHER TRADES THREADED GALVANIZED SCHEDULE 40 PIPE EXTERIOR INTERIOR DRESSER COUPLING CIVIL, LIGHTING AND ELECTRICAL DESIGN CONSULTANTS HEATING, VENTILATION, AIR CONDITIONING, PLUMBING, FIRE PROTECTION, 9229 DELEGATES ROW SUITE 150 INDIANAPOLIS, IN 46240 (317) 781-6200 CIRCLE DESIGN GROUP 19092 Project: Developer: Sheet Number: Engineer: By: Sheet Title: CDG Number: Last Revision Date: Set Issue Date Drawn By Checked By Sheet Issue DateHolland / Playfair BuildingsCarmel, IN 46032Construction Documents120 West Monon Green Blvd.H-501 HVAC SCHEDULES 09/23/201909/23/2019 Ross MaueThomas Kennedy NOT TO SCALE Condensing Unit Support DetailA NOT TO SCALE Pipe Roof Support DetailB NOT TO SCALE Roof Penetration DetailD NOT TO SCALE Horizontal Fan Coil Unit DetailC 1/8" = 1'-0" Holland Building Roof HVAC Plan1 1/4" = 1'-0" BRIDGE MECHANICAL SECTION2 NOT TO SCALE Condensate to Downspout Tie-InE