Loading...
HomeMy WebLinkAboutALB16- Energy PacketIndiana 2�2� Perfarman�e �ompliance Praperty 143fl5 MARSDALE PLACE CARMEL, IN 46074 Madel: LAYTDN BST B�5 BNS 1 DPI Cammunity: ALBANY PLACE 9a9dREIN ALBANY PLACE 14305 � 9a9aREIN ALBANY PLACE 143D5 � ❑rganixatian Top6uild Home 5ervi�es, I Eric Bjerre Builder dREES HDMES Inspe�tion 5tatus Results are projected Annual Energy Cost Design Heating Caoling Water Heating Mechanical Ventilatian SubTotal - Used to determine �omplian�e Lights & Appliances wlout Ventilation �nsite generation Total Indiana 2020 Performance $1,541 $234 $222 $3fl $2,�27 $919 $0 $2,946 Requirements � � � � � � � � 11D5 a Build Home 5enrices ENVIRCINMENTSFOR J,�, f� As aesigned $1,568 $189 $223 $30 $2,D�9 $919 $0 $2,928 1102.4.1.2 Air Leakage Testing Air sealing is 4.00 ACH at 50 Pa. It must not exceed 5.00 ACH at 54 Pa. 11D2.5 Area-weighted average fenestration SHGC 11D2.5 Area-weighted a�erage fenestration U-Factor 11D4.1 Lighting Equipment Efficiency f�landatory Checklist �'�andatory code requirements that are not checked by Ekotrope must be met. 11D3.6 Mechanical Ventilation Rate 11D3.B.1 h�lechanical Ventilation Efficacy Design exceeds requirements fvr Indiana 202� Perfvrmance compliance hy 0.9°Io. Performance-based compliance passes by a.9°:o As a 3rd party extension of the code jurisdi�tion utilizing these reports, I certify that this energy code complian�e document has been created in accordan�e with the requirements of Chapter 4 of the adopted Intemational Energy Conservation Code based on Climate Zone 5. If rating is Projected; I certiTy that the building design des�ribed herein is consistent with the building plans, specifications, and other �al�ulations submitted �tiith the permit application. If rating is Confirmed, I �ertiTy that the address referenced abo�e has been inspected.+tested and that the mandatory provisions of the IECC have been installed to meet or exceed the intent of the IECC or will be verified as such by another party. Name ❑rganization Eric 8jerre TopBuild Home 5erui�es. Inc Signature: ❑igitally sig��ed �?r6G �i!/1/Zd �I 3,'2i2fl at 5:31 PM Ekotro�e RATER - Vers.on 3.2.3.2377 Indiana 202� Perforinance compliance results calculated using Ekotrope RATER's energ}� and code compliance algorithin, including appropriate amendments. Ekotrope RATER is a RESNET Accredited HERS Rating Tool. All results are 6ased on data entered 6y Ekotrope users. Ekotrope disclaims all lia6ility for the information shown on this report. '143�� I�IARSaALE PLA�E CARM E L, 1 N 4G�74 Builder: DREES H�MES Ceiling Atti�, R-40 Aboae Grade Walls R-15 Foundation Walls R-11 Framed Floor R-3� Slab R-�.� Perimeter, R-0.0 Under linfiltration 4 ACH50 Window U-Value: 0.3, SHGC: 0.21 Building Features 1_1�-�_1►1'�»:[�l� Duct Supply R-6.0, Return R-G.0 Duct Leakage to Outside 3 CFM251 10� ft2 Tatal auct Leakage 4 CFM251 10� ft2 (Post-Canstructiony Heating Furnace • hlatural Gas • 93 AFUE Cooling Air Canditianer • Electri� • 13 SEER Water Heating Water Heater • Natural Gas •�.65 Energy Factar as a 3r� paity extei;sicn of t�e ��de jur,sd,c�,en Gt,lizii;g these repats, I cert,fy that �his zneryy cedz cc�ipliai;ce d�cu�iei:t �as been created in acceraance �rrith t�e reqGire��2i;ts of Chapter 4 of the adopted International Energy Conservation Code dased on Climate Zone 5. If rating is Projected, I certify that the building design described herein is consistent �tiith the building plans: specifications. and other calculations submitted with the permit application. If rating is Confrmed: I certiTy that the address referenced above has been inspected.+tested and that the mandatory provisions of the IECC hawe been installed to meet or exceed the intent ofthe IECC or vrill be verifed as such b�r : nether party. Name: Eri� 8jerre Si�nature: ��'t'� ���� Organization: TopBuild Home Services, Inc. Digitally signed: 312120 at 5:31 PM Ekotrope RATER - Version 3.2.3.2377 Irdiara 2C2ii Certiicate cam� wnce r�s.alts calculated using Ekotrope RATER's energy and code compliance algorithm. including appropriate ainendments. E4;atrooe P..=.TER is a RESNETHcc-edited HERS Rat rg Tool. =.1 resul°s are based on data an:ered h, E4;otrope �sers. -E:o�r��:e : a=1a -is all lial: :.: i� t a in-c ma:ic� a�o::n o� 1� a r=��c �. Energy �ode Inspectian Checklist Property ❑rganixatian 143fl5 MARSDALE PLACE Top6uild Home 5ervi�es, I CARMEL, IN 46074 Eric Bjerre Madel: LAYTDN BST B�5 BNS 1 DPI Cammunity: ALBANY PLACE Builder dREES HDMES 9a9dREIN ALBANY PLACE 14305 � 9a9aREIN ALBANY PLACE 143D5 � �eneral Building Infvrmatian Conditioned Area �sq ft} Canditioned Volume (�ubic ft) Insulated Shell Area (sq fty �,321 �1,G82 10,374.2 Inspe�tion 5tatus Results are projected a Build Home 5enrices ENVIRCINMENTSFOR J,�, f� The building energy model in Ekotrope reflects the building assemhlies and energy features listed below. Sometimes errergy features will �hange in the field from what has been modeled. The inspection pro�ess should identify any �hanges and ensure that the home continues to meet the applicable energy code. 51ab � Name: SLAB(1,696 s.f., 2Da ft. exteriar perirneter} R-0 perimeter insulation, R-� under slab insulatian. Framed Flvar � Name: FOA �187 s.f.} R-0 continuous insulation, R-30 cavity insulatian Insulation Grade: I � Name: FDG (299 s.f.} R-0 continuous insulation, R-30 cavity insulatian Insulation Grade: I Faundation Wall � Name: BGIN AM6 (Exterior Perimeter [ft]: 138.08, Height Above Grade [ft]: 1, ❑epth 6elow Grade [ft]: 7.8} R: 11.00 Feet from top af wall to tap of insulation: 0, Feet from top of wall to battom of insulatian: 4 � Name: BGW GAR �Exterior Perimeter [ft]: 61.92, Height AbQve Grade [ft]: 1, Depth 6elow Grade [ft]: 7.8y R: 11.QQ Feet from top of wall to top ofi insulation: 0, Feet from top of wall to bottom of insulation: 4 Abvve �rade Wall � Name: AMB (2,959.42 s.f.} R-a continuous insulation, R-15 cavity insulatian Insulation Grade: I Energy �ode Inspectian Checklist Property ❑rganixatian 143fl5 MARSDALE PLACE Top6uild Home 5ervi�es, I CARMEL, IN 46074 Eric Bjerre Madel: LAYTDN BST B�5 BNS 1 DPI Cammunity: ALBANY PLACE Builder dREES HDMES 9a9dREIN ALBANY PLACE 14305 � 9a9aREIN ALBANY PLACE 143D5 � � Name: GAR (624.15 s.f.} R-0 continuous insulati�n, R-15 cavity insulatian Insulati�n Grade: I � Name: ATT �323.fi3 s.f.y R-0 continuous insulation, R-15 cavity insulation Insulation Grade: I Rim Jaist � Name: AMB (295 s.f.} R: 15.00 � Name: ATT �38 s.f.} R: 15.00 Ceiling 1 Ravf � Name: FLAT �2,022 s.f.y R-27 continuous insulation, R-13 cavity insulatian Insulation Grade: I � Name: SL�PEa (1 �0 s.f.} R-25.�5 continuaus insulation, R-12.95 �avity insulation Insulation Grade: I Dpaque Daar � Name: FR�NT (24 s.f.} U: 0.227 � Name: GAR (17.8 s.f.} U: 0.227 �lazing Inspe�tion 5tatus Results are projected � Name: RIGHT 6ST EGR �1� s.f.y, lJ: 0.3D�, SHGC: D.21, arientation: SDLITH_EAST a Build Home 5enrices ENVIRCINMENTSFOR J,�, f� 2 Energy �ode Inspectian Checklist Property ❑rganixatian Inspe�tion 5tatus 143fl5 MARSDALE PLACE Top6uild Home 5ervi�es, I Results are projected CARMEL, IN 46074 Eric Bjerre Madel: LAYTDN BST B�5 BNS 1 DPI Cammunity: ALBANY PLACE Builder dREES HDMES 9a9dREIN ALBANY PLACE 14305 � 9a9aREIN ALBANY PLACE 143D5 � � Name: FR�NT 1 ST (8 s.f.}, U: 0.300, SHGC: 0.21, Orientatian: SDUTH_WEST � Name: FR�NT 1 ST (18 s.f.), U: 0.300, SHGC: 0.21, �rientation: SDUTH_WEST � Name: FR�NT 1 ST (18 s.f.), U: 0.300, SHGC: 0.21, �rientation: SDUTH_WEST � Name: LEFT 15T (18 s.f.}, U: 0.300, SHGC: 0.21, �rientatian: NaRTH_VIIEST � Name: BAGK 1ST (108 s.f.), U: 0.300, SHGC: 0.21, arientation: NORTH_EAST � Name: BAGK 1 ST (36 s.f.}, U: 0.300, SHGC: 0.21, �rientatian: NDRTH_EAST � � � � � � � � � � � Name: BAGK 1 ST (30 s.f.), U: 0.300, SHGC: 0.21, �rientatian: NDRTH_EAST Name: RIGHT 1ST (18 s.f.�, Ll: 0.3DD, SHGC: 0.21, Drientation: SaL1TH_EAST Name: RIGHT 1 ST FR DR (24 s.fi.}, U: �.300, SHGC: 0.21, �rientation: SDUTH_EAST Name: FR�NT 2ND �16 s.f.}, lJ: 0.300, SHGC: 0.21, ❑rientation: S�UTH_VIIEST Name: FR�NT 2ND �18 s.f.}, lJ: 0.300, SHGC: 0.21, Orientation: S�UTH_V11EST Name: LEFT 2ND �36 s.f.}, U: 0.3�0, SHGC: 4.21, �rientation: N�RTH_WEST Name: LEFT 2ND �18 s.f.}, U: 0.3�0, SHGC: �.21, Drientation: N�RTH_WEST Name: LEFT 2ND �� s.f.}, lJ: 0.30�, SHGC: D.21, ❑rientatian: N�RTH_WEST Name: BAGK 2ND �72 s.f.}, U: 0.30a, SHGC: 0.21, ❑rientation: IJ�RTH_EAST Name: BAGK 2N D�1 D s.f.}, U: 0.30[], SHGC: 0.21, ❑rientation: IJ�RTH_EAST Name: RIGHT 2NQ (8 s.f.J, U: 0.300, SHGC: 0.21, �rientatian: SDUTH_EAST a Build Home 5enrices ENVIRCINMENTSFOR J,�, f� 3 Energy �ode Inspectian Checklist Property ❑rganixatian 143fl5 MARSDALE PLACE Top6uild Home 5ervi�es, I CARMEL, IN 46074 Eric Bjerre Madel: LAYTDN BST B�5 BNS 1 DPI Cammunity: ALBANY PLACE Builder dREES HDMES 9a9dREIN ALBANY PLACE 14305 � 9a9aREIN ALBANY PLACE 143D5 � Inspe�tion 5tatus Results are projected � Name: RIGHT 2Na (16 s.f.), U: 0.300, SHGC: 0.21, arientatian: SDUTH_EAST Skylight Nane Present Mechanical Ventilation � Mechanical ventilatian system rated for, and capable of, providing cantinuous ventilation. System shall include automatic timing contrals. System type: Exhaust �nly, 6 hrsJday, 137.48 Watts Mechanical Equiprnent �! !�! � Fuel-fired air distribution {1 }• Natural Gas • 10D°�o Heating Load [�7a 93 AFUE Air conditioner (2} • Electric • 1 DD°Io Caoling Load [�7a 13 SEER Water Heating �3} • Natural Gas • 100°/o Hot INater Load @ 0.65 Energy Factor Air Leakage Gontrol � Test Status: 6lower-door tested House is air-sealed as to achieve 3,445 CFM50 �4.00 ACH50} ar less at final blower-doar test. Infiltratian Requirements for IECC in Climate Zone 5 2a09 IECC Infiltration limit far the design home is 7 ACHS�. 2a12 IECC Infiltration limit for the design hame is 3 ACHS�. 2a15 IECC Infiltration limit for the design hame is 3 ACHS�. 2a18 IECC Infiltration limit for the design hame is 3 ACHS�. Duct Leakage Duct 5ystem 1 All ducts and equipment within conditianed space Leakage to ❑utside spe�ified as: 3 CFM25 ! 10a ftZ Total Leakage spe�ified as: 4 CFM251 1D� ft2 �Post-Constru�tion} a Build Home 5enrices ENVIRCINMENTSFOR J,�, f� 4 Energy �ode Inspectian Checklist Property ❑rganixatian 143fl5 MARSDALE PLACE Top6uild Home 5ervi�es, I CARMEL, IN 46074 Eric Bjerre Madel: LAYTDN BST B�5 BNS 1 DPI Cammunity: ALBANY PLACE Builder dREES HDMES 9a9dREIN ALBANY PLACE 14305 � 9a9aREIN ALBANY PLACE 143D5 � Duct Leakage Cvde Requirements fvr IECC 20fl9 IECC: Inspe�tion 5tatus Results are projected Postconstruction Leakage Test: auct Leakage to Dutdoors t= 8 CFM251 100 sq ft CFA. Rough in Test with AHU: Total auct Leakage �= 6 CFM251 100 sq ft CFA. Rough in Test without AHU: Total Duct Leakage �= 4 CFM25 1 100 sq ft CFA. 2012 IECC and 2015 IECC Prescriptive Path: Postconstructian Leakage Test: Tatal au�t Leaka�e �= 4 CFM251 100 sq ft CFA. Rough in Test with AHU: Total auct Leakage �= 4 CFM251 100 sq ft CFA. Rough in Test without AHU: Total Duct Leakage �= 3 CFM2� ! 1 QO sq ft CFA. 2Q15 Performance Path �Cost Campliance}: a Build Home 5enrices ENVIRCINMENTSFOR J,�, f� Leakage testing is required UNLESS all ducts and air handlers are lo�ated entirely within the thermal envelope. There is no passlfail threshold for duct leakage on the performance path. Praject Nates ❑RG ID: 7752 ACC#: 909DREIN BUILDER NAME: DREES HOMES PR�7ECT ID: 32037 SUBDIVISIdN: ALBANY PLACE PLAN ID: 837001 PLAN NAME: 14305 MARSDALE REVISI�N DATE: 03J02�2020 PR�GRAM: HER5�100��CH5:N� CREATED �N: 03�02J2020 PLACE-LAYT�N 85T 8D5 BNS 10PL L-CC 5