HomeMy WebLinkAboutALB16- Energy PacketIndiana 2�2� Perfarman�e �ompliance
Praperty
143fl5 MARSDALE PLACE
CARMEL, IN 46074
Madel: LAYTDN BST B�5 BNS 1 DPI
Cammunity: ALBANY PLACE
9a9dREIN ALBANY PLACE 14305 �
9a9aREIN ALBANY PLACE 143D5 �
❑rganixatian
Top6uild Home 5ervi�es, I
Eric Bjerre
Builder
dREES HDMES
Inspe�tion 5tatus
Results are projected
Annual Energy Cost
Design
Heating
Caoling
Water Heating
Mechanical Ventilatian
SubTotal - Used to determine �omplian�e
Lights & Appliances wlout Ventilation
�nsite generation
Total
Indiana 2020 Performance
$1,541
$234
$222
$3fl
$2,�27
$919
$0
$2,946
Requirements
�
�
�
�
�
�
�
�
11D5
a Build
Home 5enrices
ENVIRCINMENTSFOR J,�, f�
As aesigned
$1,568
$189
$223
$30
$2,D�9
$919
$0
$2,928
1102.4.1.2 Air Leakage Testing Air sealing is 4.00 ACH at 50 Pa. It must not exceed 5.00 ACH at 54 Pa.
11D2.5 Area-weighted average fenestration SHGC
11D2.5 Area-weighted a�erage fenestration U-Factor
11D4.1 Lighting Equipment Efficiency
f�landatory Checklist �'�andatory code requirements that are not
checked by Ekotrope must be met.
11D3.6 Mechanical Ventilation Rate
11D3.B.1 h�lechanical Ventilation Efficacy
Design exceeds requirements fvr Indiana 202� Perfvrmance compliance hy 0.9°Io.
Performance-based compliance passes by a.9°:o
As a 3rd party extension of the code jurisdi�tion utilizing these reports, I certify that this energy code complian�e document has been created in accordan�e with the requirements of
Chapter 4 of the adopted Intemational Energy Conservation Code based on Climate Zone 5. If rating is Projected; I certiTy that the building design des�ribed herein is consistent with
the building plans, specifications, and other �al�ulations submitted �tiith the permit application. If rating is Confirmed, I �ertiTy that the address referenced abo�e has been
inspected.+tested and that the mandatory provisions of the IECC have been installed to meet or exceed the intent of the IECC or will be verified as such by another party.
Name
❑rganization
Eric 8jerre
TopBuild Home 5erui�es. Inc
Signature:
❑igitally sig��ed
�?r6G �i!/1/Zd
�I
3,'2i2fl at 5:31 PM
Ekotro�e RATER - Vers.on 3.2.3.2377
Indiana 202� Perforinance compliance results calculated using Ekotrope RATER's energ}� and code compliance algorithin, including appropriate amendments.
Ekotrope RATER is a RESNET Accredited HERS Rating Tool. All results are 6ased on data entered 6y Ekotrope users.
Ekotrope disclaims all lia6ility for the information shown on this report.
'143�� I�IARSaALE PLA�E
CARM E L, 1 N 4G�74
Builder: DREES H�MES
Ceiling Atti�, R-40
Aboae Grade Walls R-15
Foundation Walls R-11
Framed Floor R-3�
Slab R-�.� Perimeter, R-0.0 Under
linfiltration 4 ACH50
Window U-Value: 0.3, SHGC: 0.21
Building Features
1_1�-�_1►1'�»:[�l�
Duct Supply R-6.0, Return R-G.0
Duct Leakage to Outside 3 CFM251 10� ft2
Tatal auct Leakage 4 CFM251 10� ft2 (Post-Canstructiony
Heating Furnace • hlatural Gas • 93 AFUE
Cooling Air Canditianer • Electri� • 13 SEER
Water Heating Water Heater • Natural Gas •�.65 Energy Factar
as a 3r� paity extei;sicn of t�e ��de jur,sd,c�,en Gt,lizii;g these repats, I cert,fy that �his zneryy cedz cc�ipliai;ce d�cu�iei:t �as been created in acceraance �rrith t�e reqGire��2i;ts of
Chapter 4 of the adopted International Energy Conservation Code dased on Climate Zone 5. If rating is Projected, I certify that the building design described herein is consistent �tiith the
building plans: specifications. and other calculations submitted with the permit application. If rating is Confrmed: I certiTy that the address referenced above has been inspected.+tested and
that the mandatory provisions of the IECC hawe been installed to meet or exceed the intent ofthe IECC or vrill be verifed as such b�r : nether party.
Name: Eri� 8jerre Si�nature: ��'t'� ����
Organization: TopBuild Home Services, Inc. Digitally signed: 312120 at 5:31 PM
Ekotrope RATER - Version 3.2.3.2377
Irdiara 2C2ii Certiicate cam� wnce r�s.alts calculated using Ekotrope RATER's energy and code compliance algorithm. including appropriate ainendments.
E4;atrooe P..=.TER is a RESNETHcc-edited HERS Rat rg Tool. =.1 resul°s are based on data an:ered h, E4;otrope �sers.
-E:o�r��:e : a=1a -is all lial: :.: i� t a in-c ma:ic� a�o::n o� 1� a r=��c �.
Energy �ode Inspectian Checklist
Property ❑rganixatian
143fl5 MARSDALE PLACE Top6uild Home 5ervi�es, I
CARMEL, IN 46074 Eric Bjerre
Madel: LAYTDN BST B�5 BNS 1 DPI
Cammunity: ALBANY PLACE Builder
dREES HDMES
9a9dREIN ALBANY PLACE 14305 �
9a9aREIN ALBANY PLACE 143D5 �
�eneral Building Infvrmatian
Conditioned Area �sq ft}
Canditioned Volume (�ubic ft)
Insulated Shell Area (sq fty
�,321
�1,G82
10,374.2
Inspe�tion 5tatus
Results are projected
a Build
Home 5enrices
ENVIRCINMENTSFOR J,�, f�
The building energy model in Ekotrope reflects the building assemhlies and energy features listed below. Sometimes errergy
features will �hange in the field from what has been modeled. The inspection pro�ess should identify any �hanges and ensure
that the home continues to meet the applicable energy code.
51ab
� Name: SLAB(1,696 s.f., 2Da ft. exteriar perirneter}
R-0 perimeter insulation, R-� under slab insulatian.
Framed Flvar
� Name: FOA �187 s.f.}
R-0 continuous insulation, R-30 cavity insulatian
Insulation Grade: I
� Name: FDG (299 s.f.}
R-0 continuous insulation, R-30 cavity insulatian
Insulation Grade: I
Faundation Wall
� Name: BGIN AM6 (Exterior Perimeter [ft]: 138.08, Height Above Grade [ft]: 1, ❑epth 6elow Grade [ft]: 7.8}
R: 11.00
Feet from top af wall to tap of insulation: 0, Feet from top of wall to battom of insulatian: 4
� Name: BGW GAR �Exterior Perimeter [ft]: 61.92, Height AbQve Grade [ft]: 1, Depth 6elow Grade [ft]: 7.8y
R: 11.QQ
Feet from top of wall to top ofi insulation: 0, Feet from top of wall to bottom of insulation: 4
Abvve �rade Wall
� Name: AMB (2,959.42 s.f.}
R-a continuous insulation, R-15 cavity insulatian
Insulation Grade: I
Energy �ode Inspectian Checklist
Property ❑rganixatian
143fl5 MARSDALE PLACE Top6uild Home 5ervi�es, I
CARMEL, IN 46074 Eric Bjerre
Madel: LAYTDN BST B�5 BNS 1 DPI
Cammunity: ALBANY PLACE Builder
dREES HDMES
9a9dREIN ALBANY PLACE 14305 �
9a9aREIN ALBANY PLACE 143D5 �
� Name: GAR (624.15 s.f.}
R-0 continuous insulati�n, R-15 cavity insulatian
Insulati�n Grade: I
� Name: ATT �323.fi3 s.f.y
R-0 continuous insulation, R-15 cavity insulation
Insulation Grade: I
Rim Jaist
� Name: AMB (295 s.f.}
R: 15.00
� Name: ATT �38 s.f.}
R: 15.00
Ceiling 1 Ravf
� Name: FLAT �2,022 s.f.y
R-27 continuous insulation, R-13 cavity insulatian
Insulation Grade: I
� Name: SL�PEa (1 �0 s.f.}
R-25.�5 continuaus insulation, R-12.95 �avity insulation
Insulation Grade: I
Dpaque Daar
� Name: FR�NT (24 s.f.}
U: 0.227
� Name: GAR (17.8 s.f.}
U: 0.227
�lazing
Inspe�tion 5tatus
Results are projected
� Name: RIGHT 6ST EGR �1� s.f.y, lJ: 0.3D�, SHGC: D.21, arientation: SDLITH_EAST
a Build
Home 5enrices
ENVIRCINMENTSFOR J,�, f�
2
Energy �ode Inspectian Checklist
Property ❑rganixatian Inspe�tion 5tatus
143fl5 MARSDALE PLACE Top6uild Home 5ervi�es, I Results are projected
CARMEL, IN 46074 Eric Bjerre
Madel: LAYTDN BST B�5 BNS 1 DPI
Cammunity: ALBANY PLACE Builder
dREES HDMES
9a9dREIN ALBANY PLACE 14305 �
9a9aREIN ALBANY PLACE 143D5 �
� Name: FR�NT 1 ST (8 s.f.}, U: 0.300, SHGC: 0.21, Orientatian: SDUTH_WEST
� Name: FR�NT 1 ST (18 s.f.), U: 0.300, SHGC: 0.21, �rientation: SDUTH_WEST
� Name: FR�NT 1 ST (18 s.f.), U: 0.300, SHGC: 0.21, �rientation: SDUTH_WEST
� Name: LEFT 15T (18 s.f.}, U: 0.300, SHGC: 0.21, �rientatian: NaRTH_VIIEST
� Name: BAGK 1ST (108 s.f.), U: 0.300, SHGC: 0.21, arientation: NORTH_EAST
� Name: BAGK 1 ST (36 s.f.}, U: 0.300, SHGC: 0.21, �rientatian: NDRTH_EAST
�
�
�
�
�
�
�
�
�
�
�
Name: BAGK 1 ST (30 s.f.), U: 0.300, SHGC: 0.21, �rientatian: NDRTH_EAST
Name: RIGHT 1ST (18 s.f.�, Ll: 0.3DD, SHGC: 0.21, Drientation: SaL1TH_EAST
Name: RIGHT 1 ST FR DR (24 s.fi.}, U: �.300, SHGC: 0.21, �rientation: SDUTH_EAST
Name: FR�NT 2ND �16 s.f.}, lJ: 0.300, SHGC: 0.21, ❑rientation: S�UTH_VIIEST
Name: FR�NT 2ND �18 s.f.}, lJ: 0.300, SHGC: 0.21, Orientation: S�UTH_V11EST
Name: LEFT 2ND �36 s.f.}, U: 0.3�0, SHGC: 4.21, �rientation: N�RTH_WEST
Name: LEFT 2ND �18 s.f.}, U: 0.3�0, SHGC: �.21, Drientation: N�RTH_WEST
Name: LEFT 2ND �� s.f.}, lJ: 0.30�, SHGC: D.21, ❑rientatian: N�RTH_WEST
Name: BAGK 2ND �72 s.f.}, U: 0.30a, SHGC: 0.21, ❑rientation: IJ�RTH_EAST
Name: BAGK 2N D�1 D s.f.}, U: 0.30[], SHGC: 0.21, ❑rientation: IJ�RTH_EAST
Name: RIGHT 2NQ (8 s.f.J, U: 0.300, SHGC: 0.21, �rientatian: SDUTH_EAST
a Build
Home 5enrices
ENVIRCINMENTSFOR J,�, f�
3
Energy �ode Inspectian Checklist
Property ❑rganixatian
143fl5 MARSDALE PLACE Top6uild Home 5ervi�es, I
CARMEL, IN 46074 Eric Bjerre
Madel: LAYTDN BST B�5 BNS 1 DPI
Cammunity: ALBANY PLACE Builder
dREES HDMES
9a9dREIN ALBANY PLACE 14305 �
9a9aREIN ALBANY PLACE 143D5 �
Inspe�tion 5tatus
Results are projected
� Name: RIGHT 2Na (16 s.f.), U: 0.300, SHGC: 0.21, arientatian: SDUTH_EAST
Skylight
Nane Present
Mechanical Ventilation
� Mechanical ventilatian system rated for, and capable of, providing cantinuous ventilation.
System shall include automatic timing contrals.
System type: Exhaust �nly, 6 hrsJday, 137.48 Watts
Mechanical Equiprnent
�!
!�!
�
Fuel-fired air distribution {1 }• Natural Gas • 10D°�o Heating Load [�7a 93 AFUE
Air conditioner (2} • Electric • 1 DD°Io Caoling Load [�7a 13 SEER
Water Heating �3} • Natural Gas • 100°/o Hot INater Load @ 0.65 Energy Factor
Air Leakage Gontrol
� Test Status: 6lower-door tested
House is air-sealed as to achieve 3,445 CFM50 �4.00 ACH50} ar less at final blower-doar test.
Infiltratian Requirements for IECC in Climate Zone 5
2a09 IECC Infiltration limit far the design home is 7 ACHS�.
2a12 IECC Infiltration limit for the design hame is 3 ACHS�.
2a15 IECC Infiltration limit for the design hame is 3 ACHS�.
2a18 IECC Infiltration limit for the design hame is 3 ACHS�.
Duct Leakage
Duct 5ystem 1
All ducts and equipment within conditianed space
Leakage to ❑utside spe�ified as: 3 CFM25 ! 10a ftZ
Total Leakage spe�ified as: 4 CFM251 1D� ft2 �Post-Constru�tion}
a Build
Home 5enrices
ENVIRCINMENTSFOR J,�, f�
4
Energy �ode Inspectian Checklist
Property ❑rganixatian
143fl5 MARSDALE PLACE Top6uild Home 5ervi�es, I
CARMEL, IN 46074 Eric Bjerre
Madel: LAYTDN BST B�5 BNS 1 DPI
Cammunity: ALBANY PLACE Builder
dREES HDMES
9a9dREIN ALBANY PLACE 14305 �
9a9aREIN ALBANY PLACE 143D5 �
Duct Leakage Cvde Requirements fvr IECC
20fl9 IECC:
Inspe�tion 5tatus
Results are projected
Postconstruction Leakage Test: auct Leakage to Dutdoors t= 8 CFM251 100 sq ft CFA.
Rough in Test with AHU: Total auct Leakage �= 6 CFM251 100 sq ft CFA.
Rough in Test without AHU: Total Duct Leakage �= 4 CFM25 1 100 sq ft CFA.
2012 IECC and 2015 IECC Prescriptive Path:
Postconstructian Leakage Test: Tatal au�t Leaka�e �= 4 CFM251 100 sq ft CFA.
Rough in Test with AHU: Total auct Leakage �= 4 CFM251 100 sq ft CFA.
Rough in Test without AHU: Total Duct Leakage �= 3 CFM2� ! 1 QO sq ft CFA.
2Q15 Performance Path �Cost Campliance}:
a Build
Home 5enrices
ENVIRCINMENTSFOR J,�, f�
Leakage testing is required UNLESS all ducts and air handlers are lo�ated entirely within the thermal envelope.
There is no passlfail threshold for duct leakage on the performance path.
Praject Nates
❑RG ID: 7752
ACC#: 909DREIN
BUILDER NAME: DREES HOMES
PR�7ECT ID: 32037
SUBDIVISIdN: ALBANY PLACE
PLAN ID: 837001
PLAN NAME: 14305 MARSDALE
REVISI�N DATE: 03J02�2020
PR�GRAM: HER5�100��CH5:N�
CREATED �N: 03�02J2020
PLACE-LAYT�N 85T 8D5 BNS 10PL L-CC
5