HomeMy WebLinkAboutCOVERPROJECT SCOPE OF WORK:
THE EXISTING MAM ELECTRICAL SERVICE ENTRANCE SWITCHGEAR LINEUP IS A SINGLE
CABINET THAT ACCEPTS, TRANSFERS, AND DISTRIBUTES THE TWO UTILITY FEEDS AND THE
GENERATOR FEED. THIS EXISTING SWITCHGEAR WILL BE REPLACED WITH A NEW THREE
SECTION SWITCHGEAR, ONE SECTION FOR EACH OF THE TWO UTILITY FEEDS AND THE
GENERATOR. THE NEW SWITCHGEAR WILL BE INSTALLED IN SEPARATE ROOMS THAT HAVE
BEEN PREVIOUSLY PREPARED FOR ADDITIONAL SPACE TO FACILITATE THE MSTALLATION.
THE NEW SWITCHGEAR WILL BE INSTALLED IN PLACE AS COMPLETE AS POSSIBLE WHILE
THE EXISTING REMAINS ONLINE AND THEN LOADS WILL BE CUTOVER TO THE NEW
SWITCHGEAR.
THIS WORK INCLUDES MSTALLATION OF TWO NEW i600A SWITCHGEAR LINEUPS, A 1600A
GENERATOR SECTION, A NEW 1600A REMOTE MAIN, THREE 600A ATS UNITS, AND ONE
400A ATS.
ADDITIONALLY, A PORTABLE GENERATOR AND LOAD BANK DOCKING STATION WILL BE
INSTALLED AS A PART OF THIS PROJECT.
CODE REVIEW NOTES:
BUILDING AREA: FlRST FLOOR: 54779 SE;
SECOND FLOOR: 43544 S.F.
INTERIOR WORKING AREA (ON FlRST FLOOR): 4,000 SF.
OCCUPANCY CLASSIFlCATION: BUSME55 GROUP B
CONSTRUCTION TYPE II—B
SEISMIC HAZARD EXPOSURE GROUP: GROUP I
SEISMIC PERFORMANCE CATEGORY: CATEGORY B
ALL WORK SHALL COMPLY WITH LOCALLY ADOPTED CODES AND AMENDMENTS:
BUILDING CODE: 2014 INDIANA BUILDING CODE QBC 13)
PWMBING CODE: 2012 INDIANA PWMBING COOE (iPC i6)
ELECTRIC CODE 2009 INDIANA ELECTRIC CODE QEC 17)
MECHANICAL CODE 2014 INDIANA MECHANICAL CODE (IMC 18)
ENERGY CODE 2010 INDIANA ENERGY CONSERVATION CODE (IECC 19)
FlRE CODE 2014 INDIANA FlRE CODE (IFC 22)
ALL WALL PENETRATIONS SHALL BE PATCHE� TO EXISTING WALL CONDIPONS. FIRE WALLS
SHALL BE RRE SEALED WITH AN APPROVED RRE SEALING METHOD.
FOR THIS PROJECT THE FOLLOWING TERMS WILL HAVE THE �EFINITIONS LISTE�:
REGULATIONS LAWS, ORDINANCES, STATUES, AND LAWFUL ORDERS ISSUED BY AUTHORITIES
HAVE JURISOICTION, AND RULES, CONVENTIONS AND AGREEMENTS WITHIN
THE CONSTRUCTION INDUSTRY THAT CONTROL PEftFORMANCE OF THE WOftK
FURNISH: SUPPLY AND DELNER TO THE PROJECT SITE, READY FOR UNLOADING,
UNPACKING, ASSEMBLY, INSTALLATION AND SIMILAR OPERATIONS
INSTALL OPERATIONS AT THE PROJECT SITE INCWDWG UNLOADWG, TEMPORARILY
STORING, UNPACKING, ASSEMBLING, ERECTING, PLACING, ANCHORING, APPLYING,
WORKING TO OIMENSION, FlMSHING, CURING, PROTECTING, CLEANING AN� SIMILAR
OPERATIONS.
PROVIDE: FURNISH AND INSTALL, COMPLETE AND READY FOR INTENDED USE.
PROJECT SITE: SPACE AVAILABLE FOR PERFORMWG CONSTRUCTION ACTIVITIES.
AS RE�UIRED: AS RE�UIRED BY REGULATORY BODIES, BY REFERENCED STANDARDS, BY
EXISTWG CON�ITIONS, BY GENERALLY ACCEPTED CONSTRUCTION PRACTICE
Oft BY THE CONTRACT DOCUMENTS. IN THE EVENT OF AMBIGUITY OR
CONFLICTS, THE MOST STRINGENT RE�UIREMENTS SHALL APPLY.
RELEA5E0 FOR CONSTRIICTI�N
Su6jec��o compliance with allregula�ions
of S�a�e antl Local Codes
City of Carmel
r
�un��\i l�rcval�/��.
DATE: Qrj�08�20
2
�
m
G
�
V
701 Switchgear
Replacement
PERMIT SET: 4/16/20
�
�\11 .
� �_
CARM E L, I N D IANA
�01 C TY CE� TER DR�
CARME�9 N 460�2
.�� .nSdf1C?
. ,�]nn�l$�k�''_,
�C P�
��A
0
0
d.�'P/
0
O
J
c
:� �N�so flner�v CCn
G>
DESIGNERS/ENGMEERS�.
dbb TechSite
Your peer-eppravad
misslortcn5cal faciliTy experts
TechSite www.techsiteplan.com
8188 Business Way . Plain City, Ohio 43064
t 614.873J800. f 614.873J801
PHASE OF CONSTRUCTION:
PHASE 1 — PRE—INSTALLATION (APPoL — MID—AUGUST)
—INSTALL SWITCHGEAR A
—INSTALL SWITCHGEAR B
—INSTALL GENERATOR SWITCHGEAR
—INSTALL PORTABLE GENERATOR DOCKING STATION, COMPLETE
—INSTALL GENERATOR FEEDS TO SWITCHGEAR, COMPLETE
—INSTALL SWITCHGEAR TIE FEEDS, COMPLETE
—INSTALL NEW ATSs, COMPLETE
—INSTALL ATS SOURCE FEEDS, COMPLETE
—INSTALL ATS LOAD DISTRIBUTION PANELS, COMPLETE
—INSTALL CONDUIT RUNS AS COMPLETE AS POSSIBLE FROM RESPECTIVE SWITCHGEAR
—INSTALL NEW UNDERGROUND FEED FROM CARMEL i5T AVE TRANSFORMER TO NEW SWITCHGEAR—A AS
COMPLETE AS POSSIBLE
—INSTALL TEMPORARY GENERATOR AND CONNECT TO PORTABLE GENERATOR DOCKWG STATION
PHASE 2— UTILITY CUTOVER (MID—AUGUST — END OF AUGUST)
-0E—ENERGIZE EXISTING UTILJTY SOURCE A FEE� (SPRINGMILL)
—COMPLETE UNDERGROUND UTILITY FEED TO SWITCHGEAR A
—ENERGIZE AND COMPLETE START—UP OF NEW SWITCHGEAR
—SET—UP SWITCHGEAR FOR OPERATION IN WRAPAROUND MODE THROUGH TIE
PHASE 3 — LOAD CUTOVERS (SEPTEMBER)
—CUTOVER LOADS ONE AT A TIME AFTER HOURS, 10PM-6AM (AS MANY AS POSSIBLE IN A SINGLE
EVENING); RE—ENEftGIZE ON NEW SWITCHGEAR AFTER EACH EVENING CUTOVER
—UPS—A
—UPS—A BYPASS
—CMLLER-1
—CMLLER-2
—CMLLER-3
—MCC—A
—MCC—B
—PHA
—PHC
—DP-1
—DP-2
—DP-3
—DP-4
—DP—S
—LDP-1
—CMDP-3
—UPS—B
—UPS—B BYPASS
—REFEED MISCELLANEOUS MECHANICALS FOR DUAL BUS
-0EMO UPS—D
PHASE 4— GENERATOR CUTOVER (LATE SEPTEMBER — EARLY OCTOBER)
—REMOVE TEMPORARY GENERATOR
—COMPLETE GENERATOR FEEO TO NEW GENERATOR SWITCHGEAR
PHASE 5— DEMO MAIN SWITCHGEAR AND MSTALL NEW SERVICE DISCONNECT (OCTOBER—NOVEMBER)
—DE—ENERGIZE UTILITY SOURCE B FEED (CARMEL i5T AVE) AND TRANSFORMER
—DEMO EXISTING MAM SWITCHGEAR
-0EMO MAIN SWITCHGEAR PAD
—POUR NEW MAIN SERVICE DISCONNECT PAD
—INSTALL NEW MAW SERVICE DISCONNECT BREAKER
—REUSE EXISTING UNDERGROUND FEEDS FROM CARMEL 1ST AVE UTILITY TRANSFORMER AND TERMINATE
AT NEW SERVICE DISCONNECT SWITCH
—COMPLETE FEEDER TO NEW SWITCHGEAR—B MAIN BREAKER
—ENERGIZE NEW SWITCHGEAR IN FULL DUAL BUS CONFIGURATION.
am
�>>>�
�Noo�
� ww
N O � � �
0 0 �
�+ m a a a
0
0 0 0 0
� � �
¢ o o v�
� � � � �
a a
> 3 3 3 3
6� U V U U
� I Q m I
tt
�
A` v Y E O
W M
� o a o �
q ;, c �
�'= ms �
:/1"� a0�
v i a � T^
s�-� y�
> q L C �
U d 'N �O
V � �-�_
� E 3�g
�
M
N N �
,� N �
� Q p <n �*
s m �
= bb � �
� �
�
V/
V
0
��
�
�w
�'
�N
Uo
��
L ��a
� QOM
dE>
o �
��N
� w��
Eo
i �O N a
r�� _ ; �
a
�
�
TS JOB#: 3395
O r] � U
� W �O
� � � �
���z
F" w
U O�y
� U -/�
�
0