RELEA5E0 FOR CONSTRIICTI�N
Su6jec��o compliance with allregula�ions
of S�a�e antl Local Codes
City of Carmel
r
��n��\i l�•va�l,T�.
DATE: Qrj�08�20
� �000
I � o0
�
�
��'� \\\\\\�/'\
CZ--_
�� '''
❑
0
oo�
� .
i�
V,
i
�
\
�i
/
(N)BOND TO
BUILDING STEEL
(N)BOND TO EXISTING
GROUND LOOP
/ \ �
�
_ � \ \
<
� ��
\� �
j
�m
�_
cRou�do
OoOO \
� ���0
00
O�oO
� ���0 0
00 o O\
0000 0� ,
0
� C
\
(N)BON� 70 EXISTING
CONTROL ROOM GROUN� BAR
(BELOW RAISE� PLOOR)
. �� , �
� O�
O�
\ �O
0
00
��
�
,. ,
d.
�
ao
�(N)BOND ID EXISTING
COMPUTER ROOM GROUND BAR
(BELOW RA6ED FLOOR)
�
�
�
�
1 �
F \
�\
� /
�� �. �
> �
�
�'`. �
�
(N)BOND TO EXISTI�yG
` UPS ROOIA GROUND \
" BAR ��_'''}}}���,,, �
< /'
� !�A � �
���% �� �QO
� G�
/�% / ,5�
`�.%A✓ �6'.�
'���
�� ���
L l�L'
(� U�
�
O�
�O O�
e�
0
1L
3/32"=1 '-0"
��
(N)BOND TO
� �BUI�DING STEEL
\
\
� (N)BOND TO EXISTING
� GROUND LOOP
�/< \
'� A
� �(NfiPGDC GkD BUS
l
�
� �
GRD BUS
i �
i�
\
\
�
�
BAR ��
\
�
�
�
\
\
\
\
\
/\ 9 �
! \ 5 \
V� � `� A
_ �� � \
� �� S �
� - \
-� \
� �� \
\�>-� �
\
� �
1 � �
\
� �
�� � N \�
\,
�
_. �
�
�
� 1
1 (E)BOND TO GROUND
�1�LOOP TO REMAIN
N BOND'
� ) TO '_li
EXISTING DOMESTIC �
- WATER MAIN �
�
���
� � - � -� �,
� � �
❑
��
C �� �
� o ��
0 o�r,
— ��
?������
(N)BOND TO EXISTING L4B
GROUND BAR
(BELOW RAISED FLOOR)
C�.
��
��
�� _ �, —
u L �
� o0
�
c �
� � � � � �
GENERAL NOTES
A. ALL NEW GROUND CONNECTIONS TO BE MADE BEFORE ENERGIZING
EOUIPMENT.
B. ALL EX6TING GROUND CONNECTIONS MUST REMAIN UNTIL OLD
SWITCHGEAR IS DE-ENERGIZED AND DEMOL6HED IN ITS ENTIRETY.
C. ELECTRICAL CONTRACTOR TO TRACE EXISTING GROUND
CONNECTIONS AND VERIFY ALL EHISTING GROUND BARS AND
GROUNDING ELECTRODES ARE BONDED TO NEW ELECTRICAL
SERVICE AFTER DEMOLITION OF OLD SWITCHGEAR.
D. LOCATIONS OF Ex15TING GROUNDING ELECTRODES AND GROUND
BARS ARE TAKEN FROM HISTORICAL DRAWINGS. CONTRACTOR TO
VERIFY LOCATION OF SYSTEMS BEFORE INSTALLING NEW.
E. ALL ABOVE GROUND GROUNDING ELECTRODE CONDUCTORS TO BE
STRANDED COPPER WITH GREEN WSULATION.
F. ALL GROUNDING ELECTRODE CONDUCTORS THAT BOND
UNDERGROUND SHALL BE BARE STRANDED COPPER.
G. ALL GROUNDING ELECTRODE CONDUCTORS MUST BE CONTINUOUS,
NO SPLICING ALLOWED.
H. REFER TO GROUNDING DIAGRAM ON SHEET E3.0 FOR ADDITIONAL
INFORMATION AND GROUNDING ELECTRODE CONDUCTOR SIZING.
— CSW 4/16/20 PERMIT SET
REV BY DATE �ESCRIPTION
8' 16' 32'
3/32'=P-0'
PROJECT
MISO 701 SWITCHGEAR
REPLACEMENT
MISO
,o��.�r��,����.
Cartrnrnl. IN 46032
DRAWN BY: ORIGIN DATE: DESIGNED BY:
JHB 12/20/19 CSW
APPROVED BV: DATE CLIENT N0.
JAK 2/10/20 1532
DRAWING NAME:
E26-3395.DWG
SEAL
5.
dbb TechSite
Y p rappmved
mtssmo t I r rlrry expercs
TechSit2 www.techsiteplan.com
8188 Business Way . Plain CiTy, Ohio 43064
t 614.873J800. f 614.873J801
DATE:
2/10/20
JOB N0.
3395
TITLE
GROUNDING PLAN
LAST EDIT DATE: DRAWING N0.
3/13/20
S�^�E E2.6
3/32" = 1'-0"