Loading...
HomeMy WebLinkAboutExisting Demo PlanEXISTING 2X4 FRAMING DEMOLITION & FRAMING KEY NO DEMO IN THIS ROOM EXISTING 2X6 FRAMING WALL SECTION TO BE REMOVED NEW 2x4 FRAMING NEW 2X6 FRAMING BULK HEAD / LOWERED CEILING 2853 2853 51068 2853 2853 2853 4G 12'-5" DEMO1DEMO1 DEMO2DEMO2 DEMO3DEMO3 DEMO3DEMO3DEMO4DEMO4 DEMO5DEMO5 DEMO6DEMO6 DEMO NOTE SCHEDULE REMOVE EXISTING TREE STUMP REMOVE EXISTING CONCRETE (ON BLOCK WALL) KEEP EXISTING SCONCE LIGHTING REMOVE EXISTING DOWNSPOUT KEEP EXISTING INTERCOME RELOCATE DAYLIGHT DEMO1DEMO1 DEMO2DEMO2 DEMO3DEMO3 DEMO4DEMO4 DEMO5DEMO5 DEMO6DEMO6 DEMO1DEMO1 DEMO2DEMO2 DEMO3DEMO3 DEMO4DEMO4 DEMO5DEMO5 DEMO6DEMO6 EXISTING/DEMO PLAN SCALE: 1/2" = 1'FLENER RESIDENCEExterior Deck12487 Heatherstone PlCarmel, IN 46033Date:Revision: 2 SHEET OF 11 SIGNATURE / SEAL Client Initials: Date: The plans, including all text, drawings, concepts, and ideas forming a part of the plans and the selection and arrangement thereof are Copyright 2018 of Custom Living, Inc., Indianapolis, IN. ALL RIGHTS RESERVED. The plans shall remain the property of Custom Living Inc. Any use of the plans or their content without the prior written permission of Custom Living Inc. is strictly prohibited. CUSTOM LIVING5335 Winthrop AveIndianapolis IN 462205/7/2020 DATE: GENERAL SITE PREP & DEMO NOTES Install plastic to seal off areas being remodeled from rest of home as necessary. Install floor covering for construction path from door designated as the construction entrance to locations of remodeling as necessary. Install additional floor covering or wall protection as needed over areas close to the areas of construction activity. Install dust control measures on HVAC cold air returns located within the locations of remodeling. Custom Living can provide a HEPA Air Scrubber to aid in airborne dust control from the start of demolition up to priming of new drywall depending on site conditions. Homeowner understands that this will help to reduce airborne dust; however, it will not mitigate it in its entirety. Demolition Contractor(s) are responsible for all labor, for the scope of work specified in the drawings provided by Custom Living. Homeowner understands that Custom Living has only provided a labor and material allowance for the scope of demolition denoted on the drawings. Any additional scope added or uncovered during demolition result in filing a Change Order during construction. Homeowners understand that demolition work will generate dust and noise throughout the house. Custom Living will provide site protection measures to reduce where possible, but Homeowners should not expect 100% containment. [PRINTS TO SCALE IF PRINTED ON 24" X 36" ] 05/08/20 Nick Mishler