Loading...
HomeMy WebLinkAboutFraming PlanEXISTING 2X4 FRAMING DEMOLITION & FRAMING KEY NO DEMO IN THIS ROOM EXISTING 2X6 FRAMING WALL SECTION TO BE REMOVED NEW 2x4 FRAMING NEW 2X6 FRAMING BULK HEAD / LOWERED CEILING 2853 2853 51068 2853 2853 2853 4253 UP 12'-5" 3'-4"36'-11"12'1'4'-4 3/4"4'-7 5/8"3'-8 3/4" 5'-4 5/8" 12'-1 1/2" 11'-7 5/8"11'-11 1/8"3'-6 1/8"2'-10 1/2"7'-3 3/4"11'1'12'-11 3/4"11' HEADERS F1F1 F2F2 F3F3 F4F4 F5F5 F6F6 F7F7 F8F8 F9F9 F10F10 F11F11 FRAMING NOTE SCHEDULE STAIR POSTS 4X4 W/ CONNECTORS AND 12" SONOTUBES JOIST CANTILEVER 1X10 HEADER DOUBLE 2X10 14" SONOTUBE W/ POST CONNECTOR 6X6 POST DOUBLE END JOIST 2X10 JOIST 12" O.C. 2X10 LEDGER RAINESCAPE TROUGH IN EACH BAY RAINESCAPE SCUPPER IN EACH BAY F1F1 F2F2 F3F3 F4F4 F5F5 F6F6 F7F7 F8F8 F9F9 F10F10 F11F11 F1F1 F2F2 F3F3 F4F4 F5F5 F6F6 F7F7 F8F8 F9F9 F10F10 F11F11 FLENER RESIDENCEExterior Deck12487 Heatherstone PlCarmel, IN 46033Date:Revision: 4 SHEET OF 11 SIGNATURE / SEAL Client Initials: Date: The plans, including all text, drawings, concepts, and ideas forming a part of the plans and the selection and arrangement thereof are Copyright 2018 of Custom Living, Inc., Indianapolis, IN. ALL RIGHTS RESERVED. The plans shall remain the property of Custom Living Inc. Any use of the plans or their content without the prior written permission of Custom Living Inc. is strictly prohibited. PROPOSED FRAMING PLAN SCALE: 1/4" = 1'CUSTOM LIVING5335 Winthrop AveIndianapolis IN 462205/7/2020 DATE: GENERAL PROPOSED PLAN NOTES Framing contractors are responsible for all labor, for the scope of work specified on the drawings provided by Custom Living. Owner understands that Custom Living has only provided a labor and material allowance for the scope of Rough Carpentry work specified on the drawings. Any additional work added or uncovered during this scope will be filed as a Change Orde r during construction Owner understands that the drywall allowance is based on an estimated board count and square footage take-off. A final walk through with a drywall contractor after framing and mechanical rough-ins will be necessary to finalize drywall installation and finish budgets. Final drywall touch-ups will follow countertop installation. [PRINTS TO SCALE IF PRINTED ON 24" X 36" ] 05/08/20 Nick Mishler