Loading...
HomeMy WebLinkAbout42290006 - GRT 9 - Energy CertificateIndiana 2�2� Perfarman�e �ompliance Praperty 964 KINZERAVE CARMEL, IN 4fi032 Madel: 964 KINZER AVE-TH 9798 F Community: GRAMERCY 909aAVIN GRAMERCY 964 KINZERAVE-TH 9798 FITZ SLB 11D5 11 D2.4.12 11 D2.5 11 D2.5 Inspe�tion 5tatus Results are projected This report is hased on a projected rating (fram plansj and requires field confirmatian. Annual Energy Cost Design Heating Cooling Water Heating Mechanical Ventilatian 5ubTotal - Used to determine �omplian�e Lights & Appliances wlout Ventilation �nsite generation Total Performance-based compliance passes by �.2°�6 Air Leakage Testing Area-weighted average fenestration SHGC Area-weighted a�erage fenestration Ll-Factor Requirements � � � � � � � � ❑rganixatian TopBuild Home 5ervi�es, I Eric Bjerre 6uilder QAVIQ 1NEEKLEY HDMES 11D4.1 Lighting Equipment Efficiency f�landatory Checklist �'�andatory code requirements that are not checked by Ekotrope must be met. 11D3.6 Mechanical Ventilation Rate 1103.6.1 hlechanical Ventilation Efficacy Indiana 2020 Performance $640 $92 $183 $19 $933 $48fi $0 $1,419 a Build Home 5enrices ENVIRCIN�IhENTSFOR J,�, f� As aesigned $568 $92 $183 $22 $865 $486 $0 $1,351 Air sealing is 4.00 AGH at 50 Pa. It must not exceed 5.0� ACH at 5a Pa. Design ex�eeds requirements fvr Indiana 202� Perfvrman�e compliance hy 7.2°Io. As a 3rd party extension of the code jurisdi�tion utilizing these reports, I certify that this energy code complian�e document has been created in accordan�e with the requirements of Chapter 4 of the adopted Intemational Energy Conservation Code based on Climate Zone 5. If rating is Projected, I certiTy that the building design des�ribed herein is consistent with the building plans, specifications, and other �al�ulations submitted �tiith the permit application. If rating is Confirmed, I �ertiTy that the address referenced abo�e has been inspected.+tested and that the mandatory pro�isions of the IECC have 6een installed to meet or ex�eed the intent of the IECC or will be verified as such by another party. Name Organizatian Eric 8jerre TapBuild Home 5eruices. In� Signature: ��'�'G ���� ❑igitally sig��ed: 4;'1 D.i20 at 9:2� AM Ekotrope RATER - Vers�on 3.2.3.24�8 Indiana 202� Perforinance compliance results calculated using Ekotrope RATER's energ}� and code compliance algorithm, including appropriate amendments. Ekotrope RATER is a RESNET Accredited HERS Rating Tool. All results are 6ased on data entered 6y Ekotrope users. Ekotrope disclaims all lia6ility for the information shown on this report. 9�4 KI NZE R AVE Ceiling Attic, R-38 Abawe Grade Walls R-22 Foundation Walls N!A Framed Floor R-3� Slab R-1�.0 Perirneter, R-10.0 Under Ilnfiltration 1.37 ELAI 100 s.f. Shell Area Window U-Value: fl.34, SHGC: 0.31 Building Features Duct 5upply R-6.0, Return R-G.0 Duct Leakage ta Outside 3 CFM251 10� ft2 Tatal auct Leakage 4 CFM251 100 ft2 (Past-Canstructiony Heating Furnace • IVatural Gas • 93 AFUE Cooling Air Conditianer • Electri� • 13 SEER Water Heating Water Heater • Natural Gas •�.96 Energy Factar As a 3ro party ext�r7sion of tne code junsd�ci�on ut�lizir7g these reports, I cert�fy that ihis energy code can7pliar7ce documeryt has been created in accoraance �;rith the req�ire��erts of Chapter 4 of the adopted International Energy Conservation Code based on Climate Zone 5. If rating is Projected, I certify that the building design described herein is consiste�t �;:ith :�e building plans. specifications, and other calculations submitted with the permit application. If rating is Confrmed: I certiTy that the address referenced above has been inspected.+tested and that the mandatory provisions of the IECC have been installed to meet or exceed the intent ofthe IEGC or vrill be verifed as such by : neth�r partV. Name� Eric Bjerre Si�nature: "�'�'� ���� Organization: TapBuild Hom�e Services. Inc. Digitally signed: 411fl12fl at 9:2D AM o rope - Version 3.2.3.24D8 Irdiara 2C2ii Certiicate cam��iance results calculated using Eko�rape 4.ATER's energy and code complia�c� �Inari:lim. including ao��opriate ainerdme�ts E4::�tr:��e R=.TER is a RESNETHcc-edited HERS Rat rg Tool. =.1 resul°s are based on d.=.:._. �n � a: :�: EF:otr^�:e �sers. -E:o�r��:e : a=1a -is all lial: :.: i� t a in-c ma:ic� a�o::n o� 1� a r=��c �. CARM E L, 1 N 4G832 Builder: ❑AVID WEEKLEY H�MES IlAadel: 9G� KINZER AVE-TH 9798 FITZ 5LB END 1UPL RL-CC Cammunity: GRAMERCY This report is based an a projected rating (fram plans] and requires field canfirmation. Energy �ode Inspectian Checklist Property ❑rganixatian 964 KINZERAVE TopBuild Home 5ervi�es, I CARMEL, IN 4fi032 Eric Bjerre Madel: 964 KINZER AVE-TH 9798 F Community: GRAMERCY 6uilder QAVIQ 1NEEKLEY 909aAVIN GRAMERCY 964 HDMES KINZERAVE-TH 9798 FITZ SLB �eneral Building Infvrmatian Canditioned Area �sq ft} Canditioned Valume (�ubic ft) Insulated Shell Area (sq ft� 1,680 17,625 4,713.5 Inspe�tion 5tatus Results are projected a Build Home 5enrices ENVIRCIN�IhENTSFOR J,�, f� The building energy model in Ekotrope reflects the building assemblies and energy features listed below. Sometimes energy features will �hange in the field frorn what has been modeled. The inspection pro�ess should identify any �hanges and ensure that the home cantinues to meet the applicable energy code. 51ab � Name: SLAB(631 s.f., 105.3 ft. exterior perirneter} R-10 perimeter insulation, R-10 under slab insulation. Framed Flvar � Name: FDA �4D s.f.) R-0 continuous insulation, R-30 cavity insulation Insulatian Grade: I � Name: FDG (424 s.f.} R-0 continuous insulation, R-30 cavity insulatian Insulation Grade: I Fvundatian Wall Nane Present Abvve �rade Wall � Name: AMB (1,43D.8 s.f.} R-3 continuous insulati�n, R-19 cavity insulation Insulation Grade: I � Name: GAR (206.7 s.f.} R-0 continuous insulation, R-19 cavity insulatian Insulati�n Grade: I Energy �ode Inspectian Checklist Property ❑rganixatian 964 KINZERAVE TopBuild Home 5ervi�es, I CARMEL, IN 4fi032 Eric Bjerre Madel: 964 KINZER AVE-TH 9798 F Community: GRAMERCY 6uilder QAVIQ 1NEEKLEY 909aAVIN GRAMERCY 964 HDMES KINZERAVE-TH 9798 FITZ SLB � Name: ATT �5 s.f.} R-0.5 continuous insulation, R-19 �avity insulation Insulation Grade: I � Name: CaM �749 s.f.� R-a continuous insulation, R-13 cavity insulatian Insulation Grade: I Rim Jaist � Name: AMB (102 s.f.} R: 22.00 � Name: ATT �3D s.f.} R: 19.00 Ceiling 1 Ravf � Name: FLAT �1,095 s.f.� R-25 continuous insulatian, R-13 cavity insulation Insulation Grade: I Dpaque Daar � Name: AMB (20 s.f.) U: 0.227 � Name: GAR (17.8 s.f.} U: 0.227 �lazing Inspe�tion 5tatus Results are projected � Name: FR�NT 1 ST (36 s.f.), U: 0.340, SHGC: 0.31, �rientation: EAST � Name: FR�NT 1 ST (12 s.f.), U: 0.340, SHGC: 0.31, �rientatian: EAST � Name: FR�NT 1 ST (3 s.f.}, U: 0.340, SHGC: 0.31, ❑rientation: EAST a Build Home 5enrices ENVIRCIN�IhENTSFOR J,�, f� 2 Energy �ode Inspectian Checklist Property ❑rganixatian 964 KINZERAVE TopBuild Home 5ervi�es, I CARMEL, IN 4fi032 Eric Bjerre Madel: 964 KINZER AVE-TH 9798 F Community: GRAMERCY 6uilder QAVIQ 1NEEKLEY Inspe�tion 5tatus Results are projected 909aAVIN GRAMERCY 964 HDMES KINZERAVE-TH 9798 FITZ SLB � Name: FR�NT 2ND �18 s.f.}, lJ: 0.340, SHGC: 0.31, ❑rientation: EAST � Name: FR�NT 2ND �36 s.f.}, lJ: 0.340, SHGC: 0.31, ❑rientation: EAST � Name: BAGK 2ND �18 s.f.}, U: 0.34a, SHGC: a.31, ❑rientation: WEST � Name: BAGK 2ND �36 s.f.}, U: 0.34a, SHGC: 0.31, ❑rientation: UVEST 5kylight Nane Present Mechanical Ventilativn � Mechanical ventilatian system rated for, and capable of, providing cantinuous �entilation. System shall include automatic timing controls. System type: Air Cycler, � hrsJday, 1 fiD.8 UVatts Mechanical Equiprnent � Fuel-fired air distributiQn {1 }• Natural Gas • 10Q°/o Heating Load [�7a 93 AFUE � Air conditioner (2} • Electric • 1 DD°Io Caoling Load [�7a 13 SEER � Water Heating �3} • Natural Gas • 100°/o Hot 1Nater Load �a 0.96 Energy Factor Air Leakage Cvntrvl � Test Status: 6lower-door tested House is air-sealed as to achieve 1,174 CFM50 �4.00 AGH50} or less at final blower-door test. Infiltration Requirements for IECC in Climate Z�ne 5 2a09 IECC Infiltration limit for the design home is 7 ACHS�. 2a12 IECC Infiltration limit for the design hame is 3 ACHS�. 2a15 IECC Infiltration limit for the design hame is 3 ACHS�. 2a18 IECC Infiltration limit for the design home is 3 ACHS�. a Build Home 5enrices ENVIRCIN�IhENTSFOR J,�, f� 3 Energy �ode Inspectian Checklist Property ❑rganixatian 964 KINZERAVE TopBuild Home 5ervi�es, I CARMEL, IN 4fi032 Eric Bjerre Madel: 964 KINZER AVE-TH 9798 F Community: GRAMERCY 6uilder QAVIQ 1NEEKLEY 909aAVIN GRAMERCY 964 HDMES KINZERAVE-TH 9798 FITZ SLB Duct Leakage Duct 5ystem 1 Inspe�tion 5tatus Results are projected NDT entirely within �onditioned spa�e, testing required Leakage to ❑utside spe�ified as: 3 CFM251 1 DD ft2 Total Leakage spe�ified as: 4 CFM25 ! 1 D� ftZ �Post-Constru�tion} Duct Leakage Cvde Requirements fvr IECC 2009 IECC: Postconstructian Leakage Test: ❑uct Leakage ta �utdoors �= 8 CFM251 1 a0 sq ft �FA. Rough in Test with AHU: Tatal auct Leakage c= � CFM251 100 sq ft CFA. Rough in Test without AHU: Total Duct Leakage �= 4 CFM25 ! 100 sq ft CFA. 2012 IECC and 2015 IECC Prescriptive Path: Postconstructian Leakage Test: Tatal au�t Leaka�e �= 4 CFM251 100 sq ft CFA. Rough in Test with AHU: Total auct Leakage �= 4 CFM251 100 sq ft CFA. Rough in Test without AHU: Total Duct Leakage �= 3 CFM25 ! 100 sq ft CFA. �015 Performance Path �Cost Campliance}: a Build Home 5enrices ENVIRCIN�IhENTSFOR J,�, f� Leakage testing is required UNLESS all ducts and air handlers are lo�ated entirely within the thermal envelope. There is no passlfail threshold for duct leakage Qn the performance path. Praject Nates ❑RG ID: 48 ACC#: 909DAVIN BUILDER NAME: DAVID WEEKLEY HOMES PR�7ECT ID: 59945 SUBDIV25IDN: GRAMERCY PLAN ID: 847813 PLAN NAME: 954 KINZER AVE-TH 9798 REVISIDN DATE: 04�10�2020 PR�GRAM: EFL�D�3Y�100��CH5:N❑ CREATED ❑N: 04�10�2020 FITZ SLB END 10PL RL-CC 4