HomeMy WebLinkAbout42290006 - GRT 9 - Energy CertificateIndiana 2�2� Perfarman�e �ompliance
Praperty
964 KINZERAVE
CARMEL, IN 4fi032
Madel: 964 KINZER AVE-TH 9798 F
Community: GRAMERCY
909aAVIN GRAMERCY 964
KINZERAVE-TH 9798 FITZ SLB
11D5
11 D2.4.12
11 D2.5
11 D2.5
Inspe�tion 5tatus
Results are projected
This report is hased on a projected rating (fram plansj and requires field confirmatian.
Annual Energy Cost
Design
Heating
Cooling
Water Heating
Mechanical Ventilatian
5ubTotal - Used to determine �omplian�e
Lights & Appliances wlout Ventilation
�nsite generation
Total
Performance-based compliance passes by �.2°�6
Air Leakage Testing
Area-weighted average fenestration SHGC
Area-weighted a�erage fenestration Ll-Factor
Requirements
�
�
�
�
�
�
�
�
❑rganixatian
TopBuild Home 5ervi�es, I
Eric Bjerre
6uilder
QAVIQ 1NEEKLEY
HDMES
11D4.1 Lighting Equipment Efficiency
f�landatory Checklist �'�andatory code requirements that are not
checked by Ekotrope must be met.
11D3.6 Mechanical Ventilation Rate
1103.6.1 hlechanical Ventilation Efficacy
Indiana 2020 Performance
$640
$92
$183
$19
$933
$48fi
$0
$1,419
a Build
Home 5enrices
ENVIRCIN�IhENTSFOR J,�, f�
As aesigned
$568
$92
$183
$22
$865
$486
$0
$1,351
Air sealing is 4.00 AGH at 50 Pa. It must not exceed 5.0� ACH at 5a Pa.
Design ex�eeds requirements fvr Indiana 202� Perfvrman�e compliance hy 7.2°Io.
As a 3rd party extension of the code jurisdi�tion utilizing these reports, I certify that this energy code complian�e document has been created in accordan�e with the requirements of
Chapter 4 of the adopted Intemational Energy Conservation Code based on Climate Zone 5. If rating is Projected, I certiTy that the building design des�ribed herein is consistent with
the building plans, specifications, and other �al�ulations submitted �tiith the permit application. If rating is Confirmed, I �ertiTy that the address referenced abo�e has been
inspected.+tested and that the mandatory pro�isions of the IECC have 6een installed to meet or ex�eed the intent of the IECC or will be verified as such by another party.
Name
Organizatian
Eric 8jerre
TapBuild Home 5eruices. In�
Signature: ��'�'G ����
❑igitally sig��ed: 4;'1 D.i20 at 9:2� AM
Ekotrope RATER - Vers�on 3.2.3.24�8
Indiana 202� Perforinance compliance results calculated using Ekotrope RATER's energ}� and code compliance algorithm, including appropriate amendments.
Ekotrope RATER is a RESNET Accredited HERS Rating Tool. All results are 6ased on data entered 6y Ekotrope users.
Ekotrope disclaims all lia6ility for the information shown on this report.
9�4 KI NZE R AVE
Ceiling Attic, R-38
Abawe Grade Walls R-22
Foundation Walls N!A
Framed Floor R-3�
Slab R-1�.0 Perirneter, R-10.0
Under
Ilnfiltration 1.37 ELAI 100 s.f. Shell Area
Window U-Value: fl.34, SHGC: 0.31
Building Features
Duct 5upply R-6.0, Return R-G.0
Duct Leakage ta Outside 3 CFM251 10� ft2
Tatal auct Leakage 4 CFM251 100 ft2 (Past-Canstructiony
Heating Furnace • IVatural Gas • 93 AFUE
Cooling Air Conditianer • Electri� • 13 SEER
Water Heating Water Heater • Natural Gas •�.96 Energy Factar
As a 3ro party ext�r7sion of tne code junsd�ci�on ut�lizir7g these reports, I cert�fy that ihis energy code can7pliar7ce documeryt has been created in accoraance �;rith the req�ire��erts of
Chapter 4 of the adopted International Energy Conservation Code based on Climate Zone 5. If rating is Projected, I certify that the building design described herein is consiste�t �;:ith :�e
building plans. specifications, and other calculations submitted with the permit application. If rating is Confrmed: I certiTy that the address referenced above has been inspected.+tested and
that the mandatory provisions of the IECC have been installed to meet or exceed the intent ofthe IEGC or vrill be verifed as such by : neth�r partV.
Name� Eric Bjerre Si�nature: "�'�'� ����
Organization: TapBuild Hom�e Services. Inc. Digitally signed: 411fl12fl at 9:2D AM
o rope - Version 3.2.3.24D8
Irdiara 2C2ii Certiicate cam��iance results calculated using Eko�rape 4.ATER's energy and code complia�c� �Inari:lim. including ao��opriate ainerdme�ts
E4::�tr:��e R=.TER is a RESNETHcc-edited HERS Rat rg Tool. =.1 resul°s are based on d.=.:._. �n � a: :�: EF:otr^�:e �sers.
-E:o�r��:e : a=1a -is all lial: :.: i� t a in-c ma:ic� a�o::n o� 1� a r=��c �.
CARM E L, 1 N 4G832
Builder: ❑AVID WEEKLEY H�MES
IlAadel: 9G� KINZER AVE-TH 9798 FITZ 5LB END 1UPL RL-CC Cammunity: GRAMERCY
This report is based an a projected rating (fram plans] and requires field canfirmation.
Energy �ode Inspectian Checklist
Property ❑rganixatian
964 KINZERAVE TopBuild Home 5ervi�es, I
CARMEL, IN 4fi032 Eric Bjerre
Madel: 964 KINZER AVE-TH 9798 F
Community: GRAMERCY 6uilder
QAVIQ 1NEEKLEY
909aAVIN GRAMERCY 964 HDMES
KINZERAVE-TH 9798 FITZ SLB
�eneral Building Infvrmatian
Canditioned Area �sq ft}
Canditioned Valume (�ubic ft)
Insulated Shell Area (sq ft�
1,680
17,625
4,713.5
Inspe�tion 5tatus
Results are projected
a Build
Home 5enrices
ENVIRCIN�IhENTSFOR J,�, f�
The building energy model in Ekotrope reflects the building assemblies and energy features listed below. Sometimes energy
features will �hange in the field frorn what has been modeled. The inspection pro�ess should identify any �hanges and ensure
that the home cantinues to meet the applicable energy code.
51ab
� Name: SLAB(631 s.f., 105.3 ft. exterior perirneter}
R-10 perimeter insulation, R-10 under slab insulation.
Framed Flvar
� Name: FDA �4D s.f.)
R-0 continuous insulation, R-30 cavity insulation
Insulatian Grade: I
� Name: FDG (424 s.f.}
R-0 continuous insulation, R-30 cavity insulatian
Insulation Grade: I
Fvundatian Wall
Nane Present
Abvve �rade Wall
� Name: AMB (1,43D.8 s.f.}
R-3 continuous insulati�n, R-19 cavity insulation
Insulation Grade: I
� Name: GAR (206.7 s.f.}
R-0 continuous insulation, R-19 cavity insulatian
Insulati�n Grade: I
Energy �ode Inspectian Checklist
Property ❑rganixatian
964 KINZERAVE TopBuild Home 5ervi�es, I
CARMEL, IN 4fi032 Eric Bjerre
Madel: 964 KINZER AVE-TH 9798 F
Community: GRAMERCY 6uilder
QAVIQ 1NEEKLEY
909aAVIN GRAMERCY 964 HDMES
KINZERAVE-TH 9798 FITZ SLB
� Name: ATT �5 s.f.}
R-0.5 continuous insulation, R-19 �avity insulation
Insulation Grade: I
� Name: CaM �749 s.f.�
R-a continuous insulation, R-13 cavity insulatian
Insulation Grade: I
Rim Jaist
� Name: AMB (102 s.f.}
R: 22.00
� Name: ATT �3D s.f.}
R: 19.00
Ceiling 1 Ravf
� Name: FLAT �1,095 s.f.�
R-25 continuous insulatian, R-13 cavity insulation
Insulation Grade: I
Dpaque Daar
� Name: AMB (20 s.f.)
U: 0.227
� Name: GAR (17.8 s.f.}
U: 0.227
�lazing
Inspe�tion 5tatus
Results are projected
� Name: FR�NT 1 ST (36 s.f.), U: 0.340, SHGC: 0.31, �rientation: EAST
� Name: FR�NT 1 ST (12 s.f.), U: 0.340, SHGC: 0.31, �rientatian: EAST
� Name: FR�NT 1 ST (3 s.f.}, U: 0.340, SHGC: 0.31, ❑rientation: EAST
a Build
Home 5enrices
ENVIRCIN�IhENTSFOR J,�, f�
2
Energy �ode Inspectian Checklist
Property ❑rganixatian
964 KINZERAVE TopBuild Home 5ervi�es, I
CARMEL, IN 4fi032 Eric Bjerre
Madel: 964 KINZER AVE-TH 9798 F
Community: GRAMERCY 6uilder
QAVIQ 1NEEKLEY
Inspe�tion 5tatus
Results are projected
909aAVIN GRAMERCY 964 HDMES
KINZERAVE-TH 9798 FITZ SLB
� Name: FR�NT 2ND �18 s.f.}, lJ: 0.340, SHGC: 0.31, ❑rientation: EAST
� Name: FR�NT 2ND �36 s.f.}, lJ: 0.340, SHGC: 0.31, ❑rientation: EAST
� Name: BAGK 2ND �18 s.f.}, U: 0.34a, SHGC: a.31, ❑rientation: WEST
� Name: BAGK 2ND �36 s.f.}, U: 0.34a, SHGC: 0.31, ❑rientation: UVEST
5kylight
Nane Present
Mechanical Ventilativn
� Mechanical ventilatian system rated for, and capable of, providing cantinuous �entilation.
System shall include automatic timing controls.
System type: Air Cycler, � hrsJday, 1 fiD.8 UVatts
Mechanical Equiprnent
� Fuel-fired air distributiQn {1 }• Natural Gas • 10Q°/o Heating Load [�7a 93 AFUE
� Air conditioner (2} • Electric • 1 DD°Io Caoling Load [�7a 13 SEER
� Water Heating �3} • Natural Gas • 100°/o Hot 1Nater Load �a 0.96 Energy Factor
Air Leakage Cvntrvl
� Test Status: 6lower-door tested
House is air-sealed as to achieve 1,174 CFM50 �4.00 AGH50} or less at final blower-door test.
Infiltration Requirements for IECC in Climate Z�ne 5
2a09 IECC Infiltration limit for the design home is 7 ACHS�.
2a12 IECC Infiltration limit for the design hame is 3 ACHS�.
2a15 IECC Infiltration limit for the design hame is 3 ACHS�.
2a18 IECC Infiltration limit for the design home is 3 ACHS�.
a Build
Home 5enrices
ENVIRCIN�IhENTSFOR J,�, f�
3
Energy �ode Inspectian Checklist
Property ❑rganixatian
964 KINZERAVE TopBuild Home 5ervi�es, I
CARMEL, IN 4fi032 Eric Bjerre
Madel: 964 KINZER AVE-TH 9798 F
Community: GRAMERCY 6uilder
QAVIQ 1NEEKLEY
909aAVIN GRAMERCY 964 HDMES
KINZERAVE-TH 9798 FITZ SLB
Duct Leakage
Duct 5ystem 1
Inspe�tion 5tatus
Results are projected
NDT entirely within �onditioned spa�e, testing required
Leakage to ❑utside spe�ified as: 3 CFM251 1 DD ft2
Total Leakage spe�ified as: 4 CFM25 ! 1 D� ftZ �Post-Constru�tion}
Duct Leakage Cvde Requirements fvr IECC
2009 IECC:
Postconstructian Leakage Test: ❑uct Leakage ta �utdoors �= 8 CFM251 1 a0 sq ft �FA.
Rough in Test with AHU: Tatal auct Leakage c= � CFM251 100 sq ft CFA.
Rough in Test without AHU: Total Duct Leakage �= 4 CFM25 ! 100 sq ft CFA.
2012 IECC and 2015 IECC Prescriptive Path:
Postconstructian Leakage Test: Tatal au�t Leaka�e �= 4 CFM251 100 sq ft CFA.
Rough in Test with AHU: Total auct Leakage �= 4 CFM251 100 sq ft CFA.
Rough in Test without AHU: Total Duct Leakage �= 3 CFM25 ! 100 sq ft CFA.
�015 Performance Path �Cost Campliance}:
a Build
Home 5enrices
ENVIRCIN�IhENTSFOR J,�, f�
Leakage testing is required UNLESS all ducts and air handlers are lo�ated entirely within the thermal envelope.
There is no passlfail threshold for duct leakage Qn the performance path.
Praject Nates
❑RG ID: 48
ACC#: 909DAVIN
BUILDER NAME: DAVID WEEKLEY HOMES
PR�7ECT ID: 59945
SUBDIV25IDN: GRAMERCY
PLAN ID: 847813
PLAN NAME: 954 KINZER AVE-TH 9798
REVISIDN DATE: 04�10�2020
PR�GRAM: EFL�D�3Y�100��CH5:N❑
CREATED ❑N: 04�10�2020
FITZ SLB END 10PL RL-CC
4