HomeMy WebLinkAboutA211 INTERIOR DETAILS DOOR SCHEDULECASEWORK NOTES
ELEVATION - COFFEE 302
0 1' 2' 4
�
2+6' %6'�21/2' SOLIO
SOFFACE �41f ISIAND AL a2'
A F E WIIH MIIER FOLD
Eo�E oErnn nr ENos sucN
mnr noa¢ourA� souo
SURFACEIRANSIIIONSiO
VERiICAL �IRECIION AN�
E%1END5 T0 4" AFFJSNNO
CENIERED ON W ALL BELO W.
veovioemncen�oi
LAMINAIE
bh
GENERAL NOTE: CONTRAQOR i0 CONFIRM iHAT SMKS NOTED IN
ELEVATIONS PROPERLY COORDINATE WITH WIDTH AND DEPTH OF
BASE CAB W Ei PRIOR i0 ORDERW G.
I. PROVIDE A W.L CUSiOM GRADE FLUSH-OVERLAV CABINEiS.
FABRICATE WITH PLASTIC L4MINATE IAS NOTED M ELEVATIONS)
COVERED M.D.O. BOARD WITH 4" WIRE PULLS-COORDINATE WIiH
ELEVAiIONS FOR OUANTITIES.
-Ai COFFEE 302 PROVIDP.
24" DEEP COUMERiOPS
23" DEEP BASE CABINEiS
- 4" BASE AT CABW EA TO BE VINVL BASE AS SPECIFED, UNLESS
NOTED OiHERWISE.
YROV DERECFSSE� VOY-OY
PO W ER IN COUNiER
�mOCKEII'S PG582BNI �
POP-UP POWER GROMMEI-
2 vOwek/i oun� u5a
CHAkGEk. COLOR i9D Ok
H:UAL CONFRM E%AQ
�o�A,�o�w�r�rE�A�r.
ELEVATION - COFFEE 302
0 1' Y 4
�
D2
REVISIONS
MAR DATE DB DESCRIPiION
D1
DOOR/FRAME TYPES
DOOR SCHEDULE
# DIMENSIONS DOOR FRAME HARDWARE REM.
TYPE MATERIAL FINISH TYPE MATERIAL FINISH
02 3'-0"x8'-5"X13/q' p� SouoCOae nnnsowie F3 TIMELY MATCH TLCL
BIRCH VNR. BOMBAY EXIST.
SOLID CORE MASONITE
03 3'_0"x8'_5"X13/a" Dl — — — PS Rl
BIRCH VNR. BOMBAY
04 3'-0"x8'-5"X13/q' p� SouoCOae nnnsowie F2 TIMELY MATCH PS
BIRCH VNR. BOMBAY EXIST.
OS 3'-0"x8'-5"X13/q' p� SouoCOae nnnsowie F2 TIMELY MATCH PS
BIRCH VNR. BOMBAY EXIST.
O6 3�-O��XE�-$��X13/q� p� SOLIDCORE MASONITE _ _ _ Q� Rl
BIRCH VNR. BOMBAY
07 3'-0"x8'-5"X13/q' p� SouoCOae nnnsoNiie _ _ _ OL Rl
BIRCH VNR. BOMBAY
OS 3'-0"x8'-5"X13/q' p� SouoCOae nnnsoNiie _ _ _ OL Rl
BIRCH VNR. BOMBAY
09 3'-0"x8'-5"X13/q' p� souocoae nnnsoNire _ _ _ OL Rl
BIRCH VNR. BOMBAY
IO 3�-O��XE�-$��X13/q� p� SOLIDCORE MASONITE _ _ _ Q� Rl
BIRCH VNR. BOMBAY
11 3'-0"x8'-5"X13/q' p� SouoCOae nnnsoNiie _ _ _ OL Rl
BIRCH VNR. BOMBAY
12 3'-0"x8'-5"X13/q' D2 SouoCOae nnnsowie Fl TIMELY MATCH OL
BIRCH VNR. BOMBAY EXIST.
1B 3�-0��XE�-S��X13�q'� p� SOIJDCORE MASONITE p� RI.R2
BIRCH VNR. BOMBAY
1J 3�-O��XE�-S��X13/q� D2 SOLIDCORE MASONITE _ _ _ PS Rl
BIRCH VNR. BOMBAY
6. TENANT'S SECURITY VENDOR IS RESPONSIBLE FOR THESPEQFlCATION,
PURCHASE AND INSiALLATION OF ALL ACCESS CONTROLLED
ELECiRONIC AND/OR MAGNE➢C HARDwARE AND ASSOCIAiED DEVICES.
ALLSPEQFlCAiIONS AND INSTALLAiIONS MUST COMPLY WITH iHE
INDIANA BUILDING CODE CHAPiER 10, MEANS OF EGRESS.
]. PROVIDEBUIIHINGESONALLDOORSASFOLLOWS:
• 7'-0"Hi.iOHAVE3HINGES
• GREATERTHAN]'-0"INHT.TOHAVE4HINGES
• FlNISHiOMAiCHHARDWARESEi
��
=erem a
w000
3EAD y
o ro
DOOR O
0
8. PROVIDE �l) SETOFSRENCERS ON ALL DOOR FRAMES UNLESS OiHERW6E
NOTED.
9. PROVIDE WALLSTOP (FLOORSiOP WHERE APPLICABLEI Ai EACH DOOR
UNLESS OTHERWISE NOTED. PROVIDE WOOD BLOCKING BEHIND WALL
STOP.
�
RELEA5E0 FOR CONSTRIICTI�N
oarE: 05/15/20
Su6jec� �o compliance with all regula�ions
of S�a�e antl Local Codes
City of Carmel
r
�un��\i lo•rvalM.�� .
3-4
2" 3'-p" 2
r
O
�
0
0
Fl
6 2'
2„ 3,0„ 2 6. �,2,p, 2„
r
p y"iEMPERE�
w ��
�
0
0
F2
REMARKS
Rl. DESIGN INTENi b FOR NEW DOOR i0 BE INSiALLED IN EXISTING
FRAME: COORDINATE W FlELD AS REpUIRED. TOUCH UP EXISTING
FRAME AND/OR SIDELIGHi AS REOUIRED-
R2. PROVIDEFROSTEDFlLMFORSIDELIGHTANDGL4SSKITINDOOR.
COORDINAiE W ITH TENANi ON SIZE AND SiVLE OF FlLM.
HARDWARE LEGEND
CL
CH
CR
�B
DL
EL
ES
H
KP
KS
OL
PH
PL
PP
P$
PV
RL
SL
TS
TL
CLOSER
COAiHOOK
CARD READER BYTENAM (N.I.C.�
�EADBOLi
DUMMY LEVER
ELECTROMAGNEiIC LOCK �PER IBC 2012�
ELECTRIC SiRIKE BV iENANi (N I.C-f
HOLD OPEN
KICK PLAiE
KICK SiOP
OFFlCE LOCKSEi
PANIC HARDWARE
PRIVACV LOCKSET
PUSH/PULL
PASSAGE LAiCHSET
PNOT HINGE
ROLLER LAiCHES
SiOREROOM LOCKSEi
TOP SiRIKES
iPoLOGY LOCKSEi
DOOR/FRAME NOTES
5. REFER i0 iENANi AND LANDLORD FOR KEYING REQUIREMENTS AND
LOCKSEiS.
1. REUSE DOORS FROM DECONSTRUCiION W HERE POSSIBLE: iOUCH UP
EXISiING DOOR SiAIN AS REQUIRED. PROVI�E NEW BUILDING STAN�AR�
DOORS MAiCHWG EXISiING VENEER AS REpUIRED_ STAIN NEW DOORS
i0 MAiCH EXISiING. PRE-MACHINE NEW DOORS FOR CYLINDRICAL
LOCKSEfS.
2 PROVIDE NEW HARDWARE TO MATCH E%ISTWG ON NEW DOORS. REIISE
EXISiINGHARDwAREONEXISiINGDOORSwHEREPOSSIBLE. FORNEW
DOOR HARDWARE PROVIDE GRADE 2 MINIMUM BUILDING SiANDARD.
PROVIDE A.D.A. ACCESSBLE LEVER HANDLES ON NEW LOCK AND
LAiCHSEiS.
3. PROVIDE NEW BUILDING SiANDARD FRAMES AS REQUIRED. REUSE
EkISiING FROM DEMOLIiION WHERE POSSBLEJF FRAMES ARE NOi BEING
REPAIMED, iOUCH UP E%ISiING FRAMES i0 BE REUSED.
4. FRAME ALL DOOR ROUGH OPENINGS 4" FROM ADJACENi WALL
CORNERS UNLESS OTHERW6E NINED ON PLAN.
d 6'
�' 3'-0" 2 I'-0" �'
F3
�
�
�
�
Vw
_ I
O �
O
� Q O �
� m
� ? � �O
.p - M �
P QnL
w a M N
O c
va�-3
c 3
iHIS DRA W ING. AND iHE IDEAS.
DESIGNS AND CONCEPb CONiAwED
HEREIN.AREiHEE%CLUSNE
IMELLEQUAL PROPERiY OFSCHOII
DESIGN. WG. AND ARE NOi i0 BE
USED OR REPRODUCED IN WHOLE OR
IN PARi, W IiHOUi iHE W RIIIEN
CONSENi OF SCHOII DESIGN.
N (�
Z �`^
V
W �
>�oz
� O
� � M �
N � F w
ZJ=�
W O" �
2N��
�Z�Z
� zQ
� � W �
� w
�Wz�
V�Oz
i �
W �'
�
� �
ISSUE
DATE DESCRIPTION
01.07.2020 REVIEW SET
04.13.R020 PERMITSET
04.]1.10]0 CONSiRUCTION SEf
PROJECT NUMBER
2019.327
PROJ. MGR DRAWN BY
AS CRB
3RD FLOOR
INTERIOR DETAILS
DOOR SCHEDULE
A211
I i'-6' I �-0" I 3a" I 3a" I