Loading...
HomeMy WebLinkAboutA211 INTERIOR DETAILS DOOR SCHEDULECASEWORK NOTES ELEVATION - COFFEE 302 0 1' 2' 4 � 2+6' %6'�21/2' SOLIO SOFFACE �41f ISIAND AL a2' A F E WIIH MIIER FOLD Eo�E oErnn nr ENos sucN mnr noa¢ourA� souo SURFACEIRANSIIIONSiO VERiICAL �IRECIION AN� E%1END5 T0 4" AFFJSNNO CENIERED ON W ALL BELO W. veovioemncen�oi LAMINAIE bh GENERAL NOTE: CONTRAQOR i0 CONFIRM iHAT SMKS NOTED IN ELEVATIONS PROPERLY COORDINATE WITH WIDTH AND DEPTH OF BASE CAB W Ei PRIOR i0 ORDERW G. I. PROVIDE A W.L CUSiOM GRADE FLUSH-OVERLAV CABINEiS. FABRICATE WITH PLASTIC L4MINATE IAS NOTED M ELEVATIONS) COVERED M.D.O. BOARD WITH 4" WIRE PULLS-COORDINATE WIiH ELEVAiIONS FOR OUANTITIES. -Ai COFFEE 302 PROVIDP. 24" DEEP COUMERiOPS 23" DEEP BASE CABINEiS - 4" BASE AT CABW EA TO BE VINVL BASE AS SPECIFED, UNLESS NOTED OiHERWISE. YROV DERECFSSE� VOY-OY PO W ER IN COUNiER �mOCKEII'S PG582BNI � POP-UP POWER GROMMEI- 2 vOwek/i oun� u5a CHAkGEk. COLOR i9D Ok H:UAL CONFRM E%AQ �o�A,�o�w�r�rE�A�r. ELEVATION - COFFEE 302 0 1' Y 4 � D2 REVISIONS MAR DATE DB DESCRIPiION D1 DOOR/FRAME TYPES DOOR SCHEDULE # DIMENSIONS DOOR FRAME HARDWARE REM. TYPE MATERIAL FINISH TYPE MATERIAL FINISH 02 3'-0"x8'-5"X13/q' p� SouoCOae nnnsowie F3 TIMELY MATCH TLCL BIRCH VNR. BOMBAY EXIST. SOLID CORE MASONITE 03 3'_0"x8'_5"X13/a" Dl — — — PS Rl BIRCH VNR. BOMBAY 04 3'-0"x8'-5"X13/q' p� SouoCOae nnnsowie F2 TIMELY MATCH PS BIRCH VNR. BOMBAY EXIST. OS 3'-0"x8'-5"X13/q' p� SouoCOae nnnsowie F2 TIMELY MATCH PS BIRCH VNR. BOMBAY EXIST. O6 3�-O��XE�-$��X13/q� p� SOLIDCORE MASONITE _ _ _ Q� Rl BIRCH VNR. BOMBAY 07 3'-0"x8'-5"X13/q' p� SouoCOae nnnsoNiie _ _ _ OL Rl BIRCH VNR. BOMBAY OS 3'-0"x8'-5"X13/q' p� SouoCOae nnnsoNiie _ _ _ OL Rl BIRCH VNR. BOMBAY 09 3'-0"x8'-5"X13/q' p� souocoae nnnsoNire _ _ _ OL Rl BIRCH VNR. BOMBAY IO 3�-O��XE�-$��X13/q� p� SOLIDCORE MASONITE _ _ _ Q� Rl BIRCH VNR. BOMBAY 11 3'-0"x8'-5"X13/q' p� SouoCOae nnnsoNiie _ _ _ OL Rl BIRCH VNR. BOMBAY 12 3'-0"x8'-5"X13/q' D2 SouoCOae nnnsowie Fl TIMELY MATCH OL BIRCH VNR. BOMBAY EXIST. 1B 3�-0��XE�-S��X13�q'� p� SOIJDCORE MASONITE p� RI.R2 BIRCH VNR. BOMBAY 1J 3�-O��XE�-S��X13/q� D2 SOLIDCORE MASONITE _ _ _ PS Rl BIRCH VNR. BOMBAY 6. TENANT'S SECURITY VENDOR IS RESPONSIBLE FOR THESPEQFlCATION, PURCHASE AND INSiALLATION OF ALL ACCESS CONTROLLED ELECiRONIC AND/OR MAGNE➢C HARDwARE AND ASSOCIAiED DEVICES. ALLSPEQFlCAiIONS AND INSTALLAiIONS MUST COMPLY WITH iHE INDIANA BUILDING CODE CHAPiER 10, MEANS OF EGRESS. ]. PROVIDEBUIIHINGESONALLDOORSASFOLLOWS: • 7'-0"Hi.iOHAVE3HINGES • GREATERTHAN]'-0"INHT.TOHAVE4HINGES • FlNISHiOMAiCHHARDWARESEi �� =erem a w000 3EAD y o ro DOOR O 0 8. PROVIDE �l) SETOFSRENCERS ON ALL DOOR FRAMES UNLESS OiHERW6E NOTED. 9. PROVIDE WALLSTOP (FLOORSiOP WHERE APPLICABLEI Ai EACH DOOR UNLESS OTHERWISE NOTED. PROVIDE WOOD BLOCKING BEHIND WALL STOP. � RELEA5E0 FOR CONSTRIICTI�N oarE: 05/15/20 Su6jec� �o compliance with all regula�ions of S�a�e antl Local Codes City of Carmel r �un��\i lo•rvalM.�� . 3-4 2" 3'-p" 2 r O � 0 0 Fl 6 2' 2„ 3,0„ 2 6. �,2,p, 2„ r p y"iEMPERE� w �� � 0 0 F2 REMARKS Rl. DESIGN INTENi b FOR NEW DOOR i0 BE INSiALLED IN EXISTING FRAME: COORDINATE W FlELD AS REpUIRED. TOUCH UP EXISTING FRAME AND/OR SIDELIGHi AS REOUIRED- R2. PROVIDEFROSTEDFlLMFORSIDELIGHTANDGL4SSKITINDOOR. COORDINAiE W ITH TENANi ON SIZE AND SiVLE OF FlLM. HARDWARE LEGEND CL CH CR �B DL EL ES H KP KS OL PH PL PP P$ PV RL SL TS TL CLOSER COAiHOOK CARD READER BYTENAM (N.I.C.� �EADBOLi DUMMY LEVER ELECTROMAGNEiIC LOCK �PER IBC 2012� ELECTRIC SiRIKE BV iENANi (N I.C-f HOLD OPEN KICK PLAiE KICK SiOP OFFlCE LOCKSEi PANIC HARDWARE PRIVACV LOCKSET PUSH/PULL PASSAGE LAiCHSET PNOT HINGE ROLLER LAiCHES SiOREROOM LOCKSEi TOP SiRIKES iPoLOGY LOCKSEi DOOR/FRAME NOTES 5. REFER i0 iENANi AND LANDLORD FOR KEYING REQUIREMENTS AND LOCKSEiS. 1. REUSE DOORS FROM DECONSTRUCiION W HERE POSSIBLE: iOUCH UP EXISiING DOOR SiAIN AS REQUIRED. PROVI�E NEW BUILDING STAN�AR� DOORS MAiCHWG EXISiING VENEER AS REpUIRED_ STAIN NEW DOORS i0 MAiCH EXISiING. PRE-MACHINE NEW DOORS FOR CYLINDRICAL LOCKSEfS. 2 PROVIDE NEW HARDWARE TO MATCH E%ISTWG ON NEW DOORS. REIISE EXISiINGHARDwAREONEXISiINGDOORSwHEREPOSSIBLE. FORNEW DOOR HARDWARE PROVIDE GRADE 2 MINIMUM BUILDING SiANDARD. PROVIDE A.D.A. ACCESSBLE LEVER HANDLES ON NEW LOCK AND LAiCHSEiS. 3. PROVIDE NEW BUILDING SiANDARD FRAMES AS REQUIRED. REUSE EkISiING FROM DEMOLIiION WHERE POSSBLEJF FRAMES ARE NOi BEING REPAIMED, iOUCH UP E%ISiING FRAMES i0 BE REUSED. 4. FRAME ALL DOOR ROUGH OPENINGS 4" FROM ADJACENi WALL CORNERS UNLESS OTHERW6E NINED ON PLAN. d 6' �' 3'-0" 2 I'-0" �' F3 � � � � Vw _ I O � O � Q O � � m � ? � �O .p - M � P QnL w a M N O c va�-3 c 3 iHIS DRA W ING. AND iHE IDEAS. DESIGNS AND CONCEPb CONiAwED HEREIN.AREiHEE%CLUSNE IMELLEQUAL PROPERiY OFSCHOII DESIGN. WG. AND ARE NOi i0 BE USED OR REPRODUCED IN WHOLE OR IN PARi, W IiHOUi iHE W RIIIEN CONSENi OF SCHOII DESIGN. N (� Z �`^ V W � >�oz � O � � M � N � F w ZJ=� W O" � 2N�� �Z�Z � zQ � � W � � w �Wz� V�Oz i � W �' � � � ISSUE DATE DESCRIPTION 01.07.2020 REVIEW SET 04.13.R020 PERMITSET 04.]1.10]0 CONSiRUCTION SEf PROJECT NUMBER 2019.327 PROJ. MGR DRAWN BY AS CRB 3RD FLOOR INTERIOR DETAILS DOOR SCHEDULE A211 I i'-6' I �-0" I 3a" I 3a" I