Loading...
HomeMy WebLinkAboutD111 DECONSTRUCTION PLANLEGEND EXISTING TO BE REMOVED EXISTING TO REMAIN ______ WALL WALL _____= PARiIAL HEIGHi WALL PARiIAL HEIGHi WALL � DOORANDFRAME � DOORANDFRAME =o--r=WINDOW/SIDELIGHi xWINDOW/SIDELIGHi �i I I�CEILWGGRIDAND 7- Y- �riILES.2'x2' F��T � �y SUPPLY AIR DIFFUSERS �� �� LIGHTFlXiURE �L __ J� FLUORESCENi, 2'z4' r=1 uGHi RxiuRE �L_J FLUORESCENi, 2'x2' j� LIGHiFIXTURE.CAN LIGHi FIXTURE. ^"� PENDANi � ���H,sw�r�H 29 Exiru�nr � EMERGENCYIJGHT ����p��°� ELECiRICOUiLEi�S) DAiA OR ��� COMMUNICATION OUiLEi RECYCLING INSTRUCTIONS MEiAIS ONIY RECYCLING BIN: L CONiACi WASTE HAULER i0 ORDER TRASH DUMPSiER�SI AS REQUIRED AND I� I"MHALS ONLY' RECYCLING BW FOR THE DEMOLITION PORTION OF PROJECT ONLY. SIZE OP'MEfALS ONLY" BIN IS DEiERMMED BY iHE AMOUNi OF DEMOLITION �10-40 YARD CONTAWERS AVAILABLE�. 2 DRYWALLMUSiBEREMOVEDFROMALLMEiALSiUDSPRIORiO PLACING IN "MEiALS ONLT' 81N. ANY ADDED LABOR COST WILL BE COVERED BY MEfAL CREDITS RECEIVED FROM WASiE HAULER. 3- WASiE HAULER WILL APPLV CREDIi FOR METALS OBiAINED IN "METALS ONLY" BIN iOWARDS CONiRAQORS OVERALL INVOICE. 4. DATA/�NERSION REPORTS ARE NOT REQUIRED NOR ANY LEED PROCESSES OR PAPERWORK. 5. MHAL STUDS, DOOR FRAMES, DOOR HARDWARE GEILING GRID, LIGHT BOX FlRiURES, MEiAL CABWETS, METAL PWMBING FlRTURES, ELECiRICAL AND DAiA wIRING/CONDUIT. HVAC COMPONENiS. AND ELECiRIGAL/DATA/SWITCH 80XES CARPET RECYCLING: 6. CONiACi KRUSE CARPEi RECYCLING i0 SCHEDULE DROP OFF OF ALL CARPET BEING REMOVED (BROADLOOM AND CARPET iILE�. COORDINAiE REQUIREMENiS wliH SUSAN SHAFER �31 ]) 337�1950. DEMOLIiION CREW IS NOi RESPONSIBLE FOR KkUSE SERVICE FEES AND WILL ALSO RECOGNIZE ASAVINGS BY NO LONGER PAYING HAULWG/iIPPING FEES ON CARPEi DISPOSAL WIiH WASiE HAULER. 7. KRUSEwILLPROVIDEANON-SITEBINONDAYSREQUIRED. DEMOLITION CREW IS i0 PLACE CARPET DIRECiLY INTO BIN; DOES NOi NEED i0 BE PALLEiIZED. CONiRACiOR IS RESPONSIBLE FOR KEEPING BINS QEAN AND DRY AS TO NOT CONiAMINAiE CONTENTS. 8_ KRUSE PICK UP AND RECYCLMG FEES ARE i0 BE PAID THROUGH SCHOII DESIGN'S "NO COSi ADD PROGRAM'L CARPEi MANUFACTURER IS i0 PAY $L00 PER S�UARE VARD FOR CARPEi RECYCLING BY REDUCING PRICE OF CARPET MAiERIAL BY $ I.00. FLOORWG CONiRACiOR IS RESPONSBLE FOR DEDUCiING MAiERIAL PRICE AND PAYING $ I-00 PER S�UARE VARD i0 KRUSE SCHOiiXCHANGE: 9. CONiACi SCHOTfXCHANGE BEFORE DEMOLITION OF ITENS THAT CANNOTBERECVCLED ORSALVAGEFORL4NDLORD. SCHOIIXCHANGE CONSIDERS: DOORS, GLASS wINDOw SYSiEMS. CABWETS, DECORATIVE LIGHTS, AND FURNITURE IF IiENS ARE ACCEPTED FOR OUR INVENTORV. COORDINATE PICKUP ARER DEMOLIiION wliH CRYSiAL BRAY (317) 762-0127 Ai SCHOIIXCHANGE AT NO COST i0 THE PROJECT. CONTACi CRYSTAL BRAV (317) ]61-071] Ai SCHOTf DESIGN FOR ANY QUESTIONS REGARDING iHE RECYCLING PROCESSES. GENERAL NOTES I. REFER i0 ALL DECONSiRlICiION NOiES ON TITLE SHEET il I I. 2. ALL IiEMS BEING REMOVED FROM PROJEQ AREA ARE i0 BE CAREFULLY CONSIDERED FOR REUSE IN THE PROJECT OR SALVAGED FOR LANDLORD. FOR ALL ITEMS DEiERMWED FOR REMOVAL. REFER i0 iHE RECYCLING INSiRUCiIONS 3. kEMOVEEXbTINGkECEPTAQESAND/ORSWIiCHESASSHOWN ON PLAN PER LEGEND. PATCH WALLAND PREPARE FOR NEW FINISHE$ AS REOUIRED_ 4. SALVAGE REMOVED LIGHi FIXiURES AND HVAC DIFFUSERS FOR REUSE SEE REFLECTED CEILING PL4N FOR MORE WFORMATION. 5. SALVAGE REMOVED DOORS IF W GOOD CONDIiION: COORDINATE wliH LANDLORD ON SiORAGE. IF LANDLORD DOESN'i NEED iHEM SCHOTfXCHANGE WILL TAKE DOORS FOR 11SE ON ANOTHER PROJECi. 6. UNLESS OiHERWISE NOiED, ALL EXISiING FINISHES i0 REMAIN. QEAN AND REPAIR AS REOUIRED. SEE FINISH PLAN FOR MORE WFORMAiION. PLAN NOTES �Ot REMOVEANDSALVAGEE%ISiINGGLASSMARKERBOARD. COORDINATE WIiH TENANT ON REUSE OR STORAGE. PATCH AND PREPARE W ALL AS REQUIRED TO RECEIVE NEW FlNISHES. D02 REMOVE EX6iING CEILING BULKHEAD. IN AREA i0 BE EXPOSED i0 DECK, REMOVE CEILWG GRID AND D03 TILE AND AS MUCH OF iHE EXPOSED CONDUIi, PIPING, JUNQION BOXES AND MISCELLANEOUS UNl1SED EQUIPMENi IN THE CEILING AS POSSIBLE REMOVE LOW PRESSURE SUPPLY BRANCH LINE DUQ AND REPLACE WITH NEW RIGID SPIRAL DUQAND RECiANGULAR SUPPLY DIFFUSERS AS REQUIkED. SEE REFLECTED CEWNG PLAN FOR E%ACi LOCAiION OF EXPOSED DECK CEILING. D04 EXISiING CASEWORK AND COUNiERiOP i0 REMAIN; QEAN i0 LIKE NEW CONDITION. DOS REMOVE EXISiING BUILT-IN RECEPTION DESK. REMOVE EXISiING DOOR Ai iHIS LOCAiION: E%ISiING FRAME DO6 qND/ORSIDELIGHiiOkEMAIN.SEEDOORSCHEDULEFORMORE MFORMATION. DO] NOi USED. REMOVE EXISiING FLOORING AND WALL BASE IN THIS AREA. SEE D08 FlNISH PL4N FOR EHACTAREAAND FOR MORE WFORMAiION. D09 REMOVEANDSALVAGEEAISiWGPENDANiSFORREUSE: COORDINATE WIiH TENANT. � � � � V'w _ I O � O � Q O � � m � ? � �O .p - M � P QnL w a M N O c va�-3 c 3 iHIS DRA W ING. AND iHE IDEAS. DESIGNS AND CONCEPb CONiAwED HEREIN.AREiHEE%CLUSNE IMELLEQUAL PROPERiY OFSCHOII DESIGN. WG. AND ARE NOi i0 BE USED OR REPRODUCED IN WHOLE OR IN PARi, W IiHOUi iHE W RIIIEN CONSENi OF SCHOII DESIGN. N (� Z � � W � � O 0 Z � O � � M � N � F w ZJ=� W O" � 2H�� �Z�Z � Z � � � W � � w �Wz� V�oz H � W �' � � � ISSUE DATE DESCRIPTION 01.07.2020 REVIEW SET 04.13.R020 PERMITSET 04.]1.10]0 CONSiRUCTION SEf REVISIONS MAR DATE DB DESCRIPiION RELEA5E0 FOR CONSTRIICTI�N Su6jec� �o compliance with all regula�ions of S�a�e antl Local Codes City of Carmel r �un��\i lo•rvalM.�� . oarE: 05/15/20 �N PROJECT NUMBER 2019.327 PROJ. MGR DRAWN BY AS CRB 3RD FLOOR DECONSTRUCTION PLAN D111 � AREANoi�N�aNiRA�i DECONSTRUCTION PLAN ❑ AREAOFWORK 0 2' 4' 8' 16' ■ � -