HomeMy WebLinkAboutD111 DECONSTRUCTION PLANLEGEND
EXISTING TO BE REMOVED EXISTING TO REMAIN
______ WALL WALL
_____= PARiIAL HEIGHi WALL PARiIAL HEIGHi WALL
� DOORANDFRAME � DOORANDFRAME
=o--r=WINDOW/SIDELIGHi xWINDOW/SIDELIGHi
�i I I�CEILWGGRIDAND
7- Y- �riILES.2'x2'
F��T
� �y SUPPLY AIR DIFFUSERS
�� �� LIGHTFlXiURE
�L __ J� FLUORESCENi, 2'z4'
r=1 uGHi RxiuRE
�L_J FLUORESCENi, 2'x2'
j� LIGHiFIXTURE.CAN
LIGHi FIXTURE.
^"� PENDANi
� ���H,sw�r�H
29 Exiru�nr
� EMERGENCYIJGHT
����p��°� ELECiRICOUiLEi�S)
DAiA OR
��� COMMUNICATION
OUiLEi
RECYCLING INSTRUCTIONS
MEiAIS ONIY RECYCLING BIN:
L CONiACi WASTE HAULER i0 ORDER TRASH DUMPSiER�SI AS
REQUIRED AND I� I"MHALS ONLY' RECYCLING BW FOR THE
DEMOLITION PORTION OF PROJECT ONLY. SIZE OP'MEfALS ONLY"
BIN IS DEiERMMED BY iHE AMOUNi OF DEMOLITION �10-40 YARD
CONTAWERS AVAILABLE�.
2 DRYWALLMUSiBEREMOVEDFROMALLMEiALSiUDSPRIORiO
PLACING IN "MEiALS ONLT' 81N. ANY ADDED LABOR COST WILL BE
COVERED BY MEfAL CREDITS RECEIVED FROM WASiE HAULER.
3- WASiE HAULER WILL APPLV CREDIi FOR METALS OBiAINED IN
"METALS ONLY" BIN iOWARDS CONiRAQORS OVERALL INVOICE.
4. DATA/�NERSION REPORTS ARE NOT REQUIRED NOR ANY LEED
PROCESSES OR PAPERWORK.
5. MHAL STUDS, DOOR FRAMES, DOOR HARDWARE GEILING GRID,
LIGHT BOX FlRiURES, MEiAL CABWETS, METAL PWMBING FlRTURES,
ELECiRICAL AND DAiA wIRING/CONDUIT. HVAC COMPONENiS.
AND ELECiRIGAL/DATA/SWITCH 80XES
CARPET RECYCLING:
6. CONiACi KRUSE CARPEi RECYCLING i0 SCHEDULE DROP OFF OF
ALL CARPET BEING REMOVED (BROADLOOM AND CARPET iILE�.
COORDINAiE REQUIREMENiS wliH SUSAN SHAFER �31 ]) 337�1950.
DEMOLIiION CREW IS NOi RESPONSIBLE FOR KkUSE SERVICE FEES
AND WILL ALSO RECOGNIZE ASAVINGS BY NO LONGER PAYING
HAULWG/iIPPING FEES ON CARPEi DISPOSAL WIiH WASiE
HAULER.
7. KRUSEwILLPROVIDEANON-SITEBINONDAYSREQUIRED.
DEMOLITION CREW IS i0 PLACE CARPET DIRECiLY INTO BIN; DOES
NOi NEED i0 BE PALLEiIZED. CONiRACiOR IS RESPONSIBLE FOR
KEEPING BINS QEAN AND DRY AS TO NOT CONiAMINAiE
CONTENTS.
8_ KRUSE PICK UP AND RECYCLMG FEES ARE i0 BE PAID THROUGH
SCHOII DESIGN'S "NO COSi ADD PROGRAM'L CARPEi
MANUFACTURER IS i0 PAY $L00 PER S�UARE VARD FOR CARPEi
RECYCLING BY REDUCING PRICE OF CARPET MAiERIAL BY $ I.00.
FLOORWG CONiRACiOR IS RESPONSBLE FOR DEDUCiING
MAiERIAL PRICE AND PAYING $ I-00 PER S�UARE VARD i0 KRUSE
SCHOiiXCHANGE:
9. CONiACi SCHOTfXCHANGE BEFORE DEMOLITION OF ITENS THAT
CANNOTBERECVCLED ORSALVAGEFORL4NDLORD.
SCHOIIXCHANGE CONSIDERS: DOORS, GLASS wINDOw SYSiEMS.
CABWETS, DECORATIVE LIGHTS, AND FURNITURE IF IiENS ARE
ACCEPTED FOR OUR INVENTORV. COORDINATE PICKUP ARER
DEMOLIiION wliH CRYSiAL BRAY (317) 762-0127 Ai
SCHOIIXCHANGE AT NO COST i0 THE PROJECT.
CONTACi CRYSTAL BRAV (317) ]61-071] Ai SCHOTf DESIGN FOR
ANY QUESTIONS REGARDING iHE RECYCLING PROCESSES.
GENERAL NOTES
I. REFER i0 ALL DECONSiRlICiION NOiES ON TITLE SHEET il I I.
2. ALL IiEMS BEING REMOVED FROM PROJEQ AREA ARE i0 BE
CAREFULLY CONSIDERED FOR REUSE IN THE PROJECT OR
SALVAGED FOR LANDLORD. FOR ALL ITEMS DEiERMWED FOR
REMOVAL. REFER i0 iHE RECYCLING INSiRUCiIONS
3. kEMOVEEXbTINGkECEPTAQESAND/ORSWIiCHESASSHOWN
ON PLAN PER LEGEND. PATCH WALLAND PREPARE FOR NEW
FINISHE$ AS REOUIRED_
4. SALVAGE REMOVED LIGHi FIXiURES AND HVAC DIFFUSERS FOR
REUSE SEE REFLECTED CEILING PL4N FOR MORE WFORMATION.
5. SALVAGE REMOVED DOORS IF W GOOD CONDIiION:
COORDINATE wliH LANDLORD ON SiORAGE. IF LANDLORD
DOESN'i NEED iHEM SCHOTfXCHANGE WILL TAKE DOORS FOR
11SE ON ANOTHER PROJECi.
6. UNLESS OiHERWISE NOiED, ALL EXISiING FINISHES i0 REMAIN.
QEAN AND REPAIR AS REOUIRED. SEE FINISH PLAN FOR MORE
WFORMAiION.
PLAN NOTES
�Ot REMOVEANDSALVAGEE%ISiINGGLASSMARKERBOARD.
COORDINATE WIiH TENANT ON REUSE OR STORAGE. PATCH AND
PREPARE W ALL AS REQUIRED TO RECEIVE NEW FlNISHES.
D02 REMOVE EX6iING CEILING BULKHEAD.
IN AREA i0 BE EXPOSED i0 DECK, REMOVE CEILWG GRID AND
D03 TILE AND AS MUCH OF iHE EXPOSED CONDUIi, PIPING, JUNQION
BOXES AND MISCELLANEOUS UNl1SED EQUIPMENi IN THE CEILING
AS POSSIBLE REMOVE LOW PRESSURE SUPPLY BRANCH LINE DUQ
AND REPLACE WITH NEW RIGID SPIRAL DUQAND RECiANGULAR
SUPPLY DIFFUSERS AS REQUIkED. SEE REFLECTED CEWNG PLAN
FOR E%ACi LOCAiION OF EXPOSED DECK CEILING.
D04 EXISiING CASEWORK AND COUNiERiOP i0 REMAIN; QEAN i0
LIKE NEW CONDITION.
DOS REMOVE EXISiING BUILT-IN RECEPTION DESK.
REMOVE EXISiING DOOR Ai iHIS LOCAiION: E%ISiING FRAME
DO6 qND/ORSIDELIGHiiOkEMAIN.SEEDOORSCHEDULEFORMORE
MFORMATION.
DO] NOi USED.
REMOVE EXISiING FLOORING AND WALL BASE IN THIS AREA. SEE
D08 FlNISH PL4N FOR EHACTAREAAND FOR MORE WFORMAiION.
D09 REMOVEANDSALVAGEEAISiWGPENDANiSFORREUSE:
COORDINATE WIiH TENANT.
�
�
�
�
V'w
_ I
O �
O
� Q O �
� m
� ? � �O
.p - M �
P QnL
w a M N
O c
va�-3
c 3
iHIS DRA W ING. AND iHE IDEAS.
DESIGNS AND CONCEPb CONiAwED
HEREIN.AREiHEE%CLUSNE
IMELLEQUAL PROPERiY OFSCHOII
DESIGN. WG. AND ARE NOi i0 BE
USED OR REPRODUCED IN WHOLE OR
IN PARi, W IiHOUi iHE W RIIIEN
CONSENi OF SCHOII DESIGN.
N (�
Z �
�
W �
� O 0 Z
� O
� � M �
N � F w
ZJ=�
W O" �
2H��
�Z�Z
� Z �
� � W �
� w
�Wz�
V�oz
H �
W �'
�
� �
ISSUE
DATE DESCRIPTION
01.07.2020 REVIEW SET
04.13.R020 PERMITSET
04.]1.10]0 CONSiRUCTION SEf
REVISIONS
MAR DATE DB DESCRIPiION
RELEA5E0 FOR CONSTRIICTI�N
Su6jec� �o compliance with all regula�ions
of S�a�e antl Local Codes
City of Carmel
r
�un��\i lo•rvalM.�� .
oarE: 05/15/20
�N
PROJECT NUMBER
2019.327
PROJ. MGR DRAWN BY
AS CRB
3RD FLOOR
DECONSTRUCTION
PLAN
D111
� AREANoi�N�aNiRA�i DECONSTRUCTION PLAN
❑ AREAOFWORK 0 2' 4' 8' 16'
■ � -