Loading...
HomeMy WebLinkAbout225JGB - Sewer PermitTriCo Regional Sewer Utility SANITARY SEWER PERMITResidential 10701 N. College Avenue Suite A Indianapolis, Indiana 46280 phone 317-844-9200 fax 317-844-9203 www.trico.eco 999913642 Permit Type Final Treatment Plant MIX Subdivision Jacksons Grant Lot Number 225 Address Number 490 Street Elliot Creek Drive City Carmel Lift Station 26 Jacksons Grant Parcel Acreage 0.28 4 Zip Code 46032 Section Number 310EDU in Gallons Address 2 Project WO 2017-1339 Project Developer Jackson's Grant Real Estate Company Project Name Jacksons Grant Section 4 PLEASE NOTE: Installation of building sewer shall be per the specifications of the TriCo Regional Sewer Utility (see reverse) and any conditions noted below. All installations shall be inspected by TriCo personnel during "open trench" phase and before backfilling with stone to twelve inches above the pipe. NO footing or foundation drains, or other sources of ground or stormwater, shall be permitted to enter TriCo's sanitary sewer system. TriCo will assume no liability for drains which are below the grade level of the nearest downstream manhole nor for laterals which are extended beneath driveways or sidewalks. The permit holder (property owner, developer or builder) will be responsible for damages to TriCo's sewer system. This includes damages to manholes, castings, manhole lids and the like; caused by construction activity on the building site which is the subject of this permit. Inspections by TriCo are MANDATORY and shall be arranged by contacting TriCo's office at 844-9200 24 hours in advance. All new construction will be placed on billing two months after connection has been made or when water is connected, whichever comes first. Builder Wedgewood Building Company County Hamilton EDU Fee 1908.00 Application Fee 150.00 Fees Due Invoice Number Interceptor Fee 0.00 Plan Review and Inspection 0.00 0.00 2058.00 317-669-6315Phone Number 0.00Other Fees Owner Phone Number Occupant Phone Number Local Sewer Charge - District Contribution TriCo currently requires that an I&I inspection is performed and a Certificate of Compliance is issued prior to occupancy / sale of a properrty. Please review attached I/I Permit. The terms of the conditional permit, if any, are listed below. Builder / Owner Signature Printed Name Phone Number Permit is valid for ONE-YEAR from the date issued. Permit valid only with TriCo seal in red ink. Approved By Manholes shall remain accessible at all times. Buried manholes will be corrected by the Developer/Owner. By signing below, I attest that I am familiar with the District's specifications and agree to accept responsibility for all work done under this permit. Per Ordinance 9-13-99 and the elevations provided, the substructure shall be plumbed by:Ejector Pump Only Ryan Hartman,District Engineer 3.22 Ft.Calculation is based on both Manhole Lid Elevations and the elevation of the First Floor No manhole core permit required. (Notes) Plans have been submitted. All fees have been paid. No certificate of insurance required. No additional permits required. The facility is not classified as a FOG facility. The proper class of cleanout must be installed every 100 feet of lateral pipe measured from sewer main to structure. 05/08/2020 The building has: Basement YES Crawl Space Slab FoundationGrease Trap Grinder Station Grit Interceptor Basement Elevation First Floor Elevation 860.08 860.24Lid Elevation JG-859 DSMHUSMH 853.30 863.30 853.30 863.30 JG-872 Main ID: Manhole IDs Carmel UtilitiesWater Service JG872-JG859 Grease Interceptor 3.06 SUMMARY OF LATERAL INSTALLATION REQUIREMENTS Revised 03/19/2019 TriCo Regional Sewer Utility 10701 North College Avenue Suite A Indianapolis, Indiana 46280 Phone (317)-844-9200 Fax (317)-844-9203 1.Only one building may connect to the sewer main per lateral unless otherwise approved by TriCo. 2.Foundation drains, sump drains, downspouts and other storm water drains shall never be connected to the sanitary sewer. Site dewatering systems shall never be discharged to the sanitary sewer. 3.The existing sewer line from the building to the septic tank may only be reused if it is located under a building addition, patio, porch or paved driveway, and the line passes an air test that is observed by TriCo. Contact TriCo for more information about air testing requirements. The property owner is responsible for testing costs. 4.TriCo shall inspect all new laterals or lateral repairs in their entirety. Final connection to the sanitary sewer must be observed by Trico. The property owner or contractor must notify TriCo prior to backfilling. Inspections must be scheduled at least 24 hours in advance. If an inspection fails and subsequent inspections are required, or if the contractor is not on site for the scheduled inspection, a $100 fee will be assessed and must be paid prior to scheduling the reinspection. 5.Septic system contents or effluent shall never be discharged to the sanitary sewer. Be advised that your county health department regulates septic systems. Upon connection to sanitary sewer, a septic tank must typically be abandoned, pumped clean, and filled completely with earthen material. Contact your county health department for more information on septic system and abandonment requirements, and to notify the department of any abandonment. 6.The following materials are acceptable for use in gravity sewer lateral installation or repair: PVC pipe: SDR 35 or SDR 26, ASTM D3034, 6” diameter PVC pipe, pressure rated: SDR 21, ASTM D2241, 6” diameter PVC restrained joint pipe for directional drilling: Certaflo Greenline SDR 21, ASTM D2241, 6” diameter All gasketed joints shall meet ASTM D3212 All fittings shall be SDR26 or better Ductile iron mechanical joint fittings with proper hardware SDR 26 gasketed repair sleeves or Indiana Seal shear guard Fernco and similar flexible couplings are only acceptable in certain circumstances and shall not be used without prior approval from TriCo Cleanouts: 6” threaded PVC caps Bedding: Use #8 crushed stone or fractured face aggregate The following materials are acceptable for use in low-pressure sewer lateral installation or repair: HDPE pipe for directional drilling: DR 11 IPS, 1.25” diameter, PE4710 Connections shall be made via electrofusion or using polypropylene or stainless steel compression fittings Electrofusion high volume tapping tee, rated 200 psi, PE4710 1.25” IPS full port 1/4 turn fusible PE ball valve, rated 200 psi Threaded swing check valve, 316 stainless steel, rated 200 psi Contact TriCo for acceptable pump station materials, equipment, pumps and other requirements 7.For gravity and low-pressure systems, the line leaving the building shall not exceed 3’ in length before a cleanout must be added and the line is transitioned to 6” diameter SDR 35 PVC pipe. Glued joints are not allowed after 3’. No additional glued fittings are allowed between the building and the transition/cleanout. For all gravity lines, cleanouts shall not be spaced more than 100’ apart between the building and the sewer main. See TriCo’s standard drawings for more information on cleanout installation. 8.Bedding material shall be placed from at least 6 inches below to 12 inches above the pipe surface. The trench shall be a minimum of 18” wide with at least 6” of clearance on both sides of the pipe. Material shall be placed over the pipe and tracer wire after inspection. Soft, unstable or unsuitable material found below and near the lateral, including any fill or foundation backfill material, must be removed and replaced with #8 stone. The contractor is solely responsible for establishing stable pipe bedding conditions. 9.#10-AWG solid copper tracer wire shall be laid on top of and run the entire length of the lateral. All splicing of tracer wire shall use 3M splice kit model DBR/Y-6, King Innovation Dryconn Direct Bury Lug Aqua catalog #90220, or TriCo approved equal.10.Laterals shall be installed at least 20’ from water wells unless PVC pressure grade pipe is used. Any proposed installation requiring pressure pipe shall be reviewed by TriCo prior to installation. Where a transition is made between SDR 35 pipe and pressure grade SDR 21 pipe, a ductile iron gasketed mechanical couplings must be used. 11.Laterals less than 5’ deep shall be at least 24” from the property line. Laterals more than 5’ deep shall be at least 36” from the property line. Where the lateral runs in close proximity to the property line the property corners must be accurately staked by a professional land surveyor prior to inspection. 12.Laterals running parallel to a building or structure shall be at least 36” from the face of a crawl space or slab on grade foundation and 60” from the face of a basement foundation wall. Spacing requirements also apply with respect to the ancillary structure’s foundation depth. Ancillary structures (e.g. window wells) and other utilities shall not be placed over or near the lateral. TriCo may adjust requirements where future access to the lateral may be obstructed by other utilities. The contractor should call to discuss further if he/she believes this could be an issue. 13.All infrastructure connected to TriCo’s sewer system may be tested, inspected, or televised at TriCo’s discretion, and must remain accessible and properly maintained. 14.Call 811 or 1-800-382-5544 before you dig. For more information go to www.indiana811.org. Basement YES Basement Status Ejector Pump Only Cleanout YES Crawl Space Grinder Station Main ID JG872-JG859 Water Type Carmel Utilities Sump Pump YES Square FootageSlab Foundation This program requires prior to the sale/occupance of a property that the property owner/builder notify TriCo and schedule an inspection. The inspection will verify that: Downspouts are not connected to the sanitary sewer The sump pump is not connected to the sanitary sewer Cleanout caps are in place and watertight No yard drains are connected to the sanitary sewer There are no sinkholes or other indications that the sewer lateral is leaking If deficiencies are found, the property owner will be notified and must make corrections immediately. The property owner will need to schedule a follow up inspection. If a certificate of compliance is not issued within 30 days of the change in ownership, a sewer surcharge of $20 per month will be assessed and added to the sewer bill. Owner / Occupant Signature:Date: Approved By:Date: Facility Features and Addition Information Program Specifications Ejector Pump 5 Ton or greater HVAC units do not dishcarge condenstion to the sanitary sewer. Lift Station 26 Jacksons Grant I & I Permit Address 2 Address Number 490 City Carmel Lot Number 225 Zip Code 46032 Subdivision Jacksons Grant Street Elliot Creek Drive State IN Section Number 4 Owner Address Number Address 2 City Email Address Fax Number First Name Last Name Mobile Number Phone Number State Street Zip Code Ordinance 12-08-08 Lateral Location Owner / Occupant Information Permit Information Owner Address if Different Builder Information TriCo Regional Sewer Utility 10701 N. College Avenue Suite A Indianapolis, Indiana 46280 phone 317-844-9200 fax 317-844-9203 www.trico.eco Builder Wedgewood Building Company Phone Number 317-669-6315 Residential 5.8.2020 5.8.2020