HomeMy WebLinkAbout225JGB - Truss Placement12-07-04 TOP
8-06-00 TOP
8-06-00 TOP
10-01-02 TOP
12-01-02 TOP
12-01-02 TOP
10-01-02 TOP
10-01-02 TOP
MUS26
MUS26
MUS26
MUS26
MUS26
MUS26
MUS26
MUS26
TG01
GE01
GE02
GE03
T04
GE04
T05
GE05
GE06
T08
GE07
GE08
T12
GE09
GE10
T14
TG02
GE11
GE12
GE12
V01
V02
GE13
V03
V04
V05
V06
V07
V08
V09
PBE01
PBE01
PBE02
PBE03
T01(7)
T02(6)
T03(2)
T06(3)
T07(6)
T09(8)
T13(5)
PB01(8)
PB02(13)
M01(12)
T11(2)
T10(5)
T10(6)
23-11-00 13-00-00 16-01-00 4-00-00 27-11-00
14-00-00 10-00-00
14-08-00 13-00-00
31-11-00 23-08-00 2-00-00
57-07-00
21-08-00 13-00-00 38-11-00 11-04-00
13-08-00 10-11-00 3-01-00 27-03-00 2-08-00
84-11-00
IRC 2018
TPI 2014 20TLL - 10TDL - 10BDL
Wedgewood Building Company
Gray Residence
225 Bridgemont at Jackson's Grant
1/4"=1'
May 8, 2020
PH
B20001267
CUSTOMER:
LOCATION:
MODEL:
JOB #:
DATE:
DESIGNER: DESIGN INFORMATION: SCALE:
9028 Old SR 67 South
Mooresville, IN 46158
(317) 834-5380
Truss Placement Guide
1) This layout is intended for the purpose of truss location
and placement only. Refer to the building plans for actual
building construction.
2) All dimensions shown 00-00-00 are in feet-inches-sixteenths.
3) Trusses are spaced 24" on center unless otherwise noted.
4) Do not cut or modify trusses.
5) Refer to the individual truss design drawings for the location
of member bracing, uplift and truss end reactions.
6) Installation of all temporary and permanent bracing is
essential. See truss drawings, BCSI-B2 Summary Sheet
and building designer requirements.
7) Non-bearing walls may not be shown on layout.
Left end of truss, as shown on engineering
drawing, is indicated by the triangle symbol