Loading...
HomeMy WebLinkAboutCorrespondenceTransmittal 101 South Pennsylvania Street, Indianapolis, IN 46204 Page 1 of 1 PROJECT:Zotec Partners Tech Village 18087.000 DATE:5/26/2020 SUBJECT:Packet for plan commission TRANSMITTAL ID:00495 PURPOSE:For your review and comment VIA:Info Exchange FROM NAME COMPANY EMAIL PHONE Jake Plummer 101 South Pennsylvania Street Indianapolis, IN 46204 RATIO Architects, Inc. JPlummer@RATIOdesign.co m (317) 275-6961 TO NAME COMPANY EMAIL PHONE Rachel Keesling Carmel City Hall One Civic Square Carmel IN 46032 United States City of Carmel, IN rkeesling@carmel.in.gov (317) 571-2417 REMARKS:Rachel, Please find a very simple packet with some renderings and site plan showing the proposed changes for which documents have previously been submitted via Project Dox. Please let me know if there are any questions. Jake DESCRIPTION OF CONTENTS QTY DATED TITLE NOTES 1 5/26/2020 ZP_PlanCmteInfoPacket_2020 05.26.pdf Shestak, Joe From:Keesling, Rachel M Sent:Friday, May 22, 2020 1:10 PM To:'Jake Plummer' Cc:'Ben Bemis'; Shestak, Joe Subject:RE: Zotec Partners HQ - Signage and Landscape Questions Follow Up Flag:Follow up Flag Status:Completed Hi Jake, Thanks for sending those. I think the rendering looks much better, more like what I was expecting to see. I’m glad to hear that in real life it will have a lower output too. Thank you for re-running the photometric as well. It is lower, which is good, but not as low as required. You asked about a plan for lighting the sidewalks, and we don’t really focus that. It’s mostly just around the intersection in an area like this. When the new round-a-bout is constructed, I think we will most likely install 4 new street lights around it, which will help illuminate the area. (I have an email out to Chris Ogg, the Asst. City Engineer, to confirm the number of lights.) Maybe some of the poles need to be removed or spread out more to get the lighting levels down to 0.3 footcandles at the property line. Please keep working to achieve these measurements. I probably have not mentioned this yet, for which I apologize, but we do need a PDF information packet for your project to distribute to the Plan Commission Commercial Committee members. If you could throw something together today, that would be awesome. If not, I completely understand, and we can accept it early next week and get it out to PC members then. Just need a cover sheet, little info about the project, and a few drawings to explain what is proposed for the committee members. We don’t need the full set of drawings or the detailed drainage info, just the basics and pretty pictures. I have this slated to be on the Thursday, June 4 Commercial Committee agenda for approval, which you will be receiving the agenda later today. Also, I wanted to let you know that if you would like to call me, I now have a City cell phone and my number is 317-750- 5634. Thanks for your patience with me! I truly appreciate it! Rachel Rachel Keesling Planning Administrator 317-571-2417 rkeesling@carmel.in.gov From: Jake Plummer <JPlummer@ratiodesign.com> Sent: Thursday, May 21, 2020 10:57 AM To: Keesling, Rachel M <rkeesling@carmel.in.gov> Cc: 'Ben Bemis' <bbemis@cecinc.com> Subject: RE: Zotec Partners HQ - Signage and Landscape Questions **** This is an EXTERNAL email. Please exercise caution and Do Not open attachments or click links from unknown senders or unexpected email. **** 1 Rachel, Good Morning. Hope this finds you well. I have uploaded as of this morning a new / revised night rendering and two new photometric diagrams for review/ consideration. Please note that on the night render, although I had our renderer scale down the output on the image, in reality the lumen output for these recessed LED lights will be much lower in reality than what is depicted on this rendering. We can provide cut sheet and photometric information if necessary. Regarding the site photometrics, as suggested earlier we have had ESL spectrum re-run the lighting diagram for the site with the post lights having a lower lumen output. The 2 new drawings should explain those lower values. Please let us know if there are any questions. Jake Jacob Plummer, AIA, LEED AP BD+C Associate Principal / Director of Technical Resources Direct 317.275.6961 Cell 317.727.3299 RATIO | defining spaces, creating places, enhancing community (sm) RATIOdesign.com Indianapolis 317.633.4040 | Champaign 217.352.7696 | Raleigh 919.821.0805 | Chicago 312.465.2359 | Denver 303.607.0040 Affiliates: RATIO States, LLC | RATIO States - NC, PLLC | RATIO Architects of Ohio, LLC | RATIO|smdp, LLC Now on the RATIO blog: Rethinking the Workplace RATIO COVID-19 OFFICE and MEETING Safety Protocols RATIO will reopen studios based on each state’s requirements to help protect our staff, clients, and vendors. Several staff members will continue to work from home even when the studios open. While we value our client interactions and collaboration, we would prefer no in-person meetings in our studios or at client locations until after June 30. We will continue virtual OAC meetings, prefer to limit construction observations towards the end of the day, and will continue to collaborate virtually. Thank you for your understanding in these unprecedented times. From: Keesling, Rachel M <rkeesling@carmel.in.gov> Sent: Thursday, May 7, 2020 9:29 PM To: Jake Plummer <JPlummer@ratiodesign.com> Subject: RE: Zotec Partners HQ - Signage and Landscape Questions Hi Jake, I’ll try to touch base later in the afternoon tomorrow if that’s ok. Thanks, Rachel Rachel Keesling Planning Administrator 317-571-2417 rkeesling@carmel.in.gov From: Jake Plummer <JPlummer@ratiodesign.com> Sent: Thursday, May 7, 2020 12:18 PM To: Keesling, Rachel M <rkeesling@carmel.in.gov> Subject: RE: Zotec Partners HQ - Signage and Landscape Questions 2 **** This is an EXTERNAL email. Please exercise caution and Do Not open attachments or click links from unknown senders or unexpected email. **** Rachel, Yes, I was able to gain access and have reviewed comments. Thank you. If you have a few minutes later today or Friday, I was hoping to speak with you about resolution of the lighting related comments. Jake Jacob Plummer, AIA, LEED AP BD+C Associate Principal / Director of Technical Resources Direct 317.275.6961 Cell 317.727.3299 RATIO | defining spaces, creating places, enhancing community (sm) RATIOdesign.com Indianapolis 317.633.4040 | Champaign 217.352.7696 | Raleigh 919.821.0805 | Chicago 312.465.2359 | Denver 303.607.0040 Affiliates: RATIO States, LLC | RATIO States - NC, PLLC | RATIO Architects of Ohio, LLC | RATIO|smdp, LLC Now on the RATIO blog: Community Library Wins ALA/IIDA Library Interior Design Award RATIO COVID-19 OFFICE and MEETING Safety Protocols RATIO will reopen studios based on each state’s requirements to help protect our staff, clients, and vendors. Several staff members will continue to work from home even when the studios open. While we value our client interactions and collaboration, we would prefer no in-person meetings in our studios or at client locations until after June 30. We will continue virtual OAC meetings, prefer to limit construction observations towards the end of the day, and will continue to collaborate virtually. Thank you for your understanding in these unprecedented times. From: Keesling, Rachel M <rkeesling@carmel.in.gov> Sent: Thursday, May 7, 2020 12:07 PM To: Jake Plummer <JPlummer@ratiodesign.com> Subject: RE: Zotec Partners HQ - Signage and Landscape Questions Hi Jake, Did you get the password reset and were you able to get in there now? Thanks, Rachel Rachel Keesling Planning Administrator 317-571-2417 rkeesling@carmel.in.gov From: Jake Plummer <JPlummer@ratiodesign.com> Sent: Tuesday, May 5, 2020 9:50 AM To: Keesling, Rachel M <rkeesling@carmel.in.gov> Subject: RE: Zotec Partners HQ - Signage and Landscape Questions 3 **** This is an EXTERNAL email. Please exercise caution and Do Not open attachments or click links from unknown senders or unexpected email. **** Rachel, Good Morning. Hope you are well. I still cannot gain access to ProjectDox. I have received 2 notifications this morning with markups from Alex Jordan that need to be reviewed. Below is the notification I have received when trying to login. Might you be able to direct me to someone who can assist? Thanks. Jake Jacob Plummer, AIA, LEED AP BD+C Associate Principal / Director of Technical Resources Direct 317.275.6961 Cell 317.727.3299 RATIO | defining spaces, creating places, enhancing community (sm) RATIOdesign.com Indianapolis 317.633.4040 | Champaign 217.352.7696 | Raleigh 919.821.0805 | Chicago 312.465.2359 | Denver 303.607.0040 Affiliates: RATIO States, LLC | RATIO States - NC, PLLC | RATIO Architects of Ohio, LLC | RATIO|smdp, LLC Now on the RATIO blog: Community Library Wins ALA/IIDA Library Interior Design Award RATIO COVID-19 OFFICE and MEETING Safety Protocols 4 RATIO will reopen studios based on each state’s requirements to help protect our staff, clients, and vendors. Several staff members will continue to work from home even when the studios open. While we value our client interactions and collaboration, we would prefer no in-person meetings in our studios or at client locations until after June 30. We will continue virtual OAC meetings, prefer to limit construction observations towards the end of the day, and will continue to collaborate virtually. Thank you for your understanding in these unprecedented times. From: Keesling, Rachel M <rkeesling@carmel.in.gov> Sent: Wednesday, April 29, 2020 4:44 PM To: Jake Plummer <JPlummer@ratiodesign.com> Subject: RE: Zotec Partners HQ - Signage and Landscape Questions Hey there, Were you able to log in? Or do you still need your password reset? I still need to check on all the plans uploaded and let you know. Rachel Rachel Keesling Planning Administrator 317-571-2417 rkeesling@carmel.in.gov From: Jake Plummer <JPlummer@ratiodesign.com> Sent: Wednesday, April 29, 2020 3:10 PM To: Keesling, Rachel M <rkeesling@carmel.in.gov>; 'Bemis, Ben' <bbemis@cecinc.com> Cc: France, Todd <toddfrance@fawilhelm.com>; Ferraro, Joe <JoeFerraro@fawilhelm.com>; Ham, Kent <KentHam@fawilhelm.com>; jlaw@zotecpartners.com Subject: RE: Zotec Partners HQ - Signage and Landscape Questions **** This is an EXTERNAL email. Please exercise caution and Do Not open attachments or click links from unknown senders or unexpected email. **** Rachel, Following up on our ADLS amendment. Does the City believe that they have all of the drawings from our team and are there any questions on the intent of this Amendment related to work we intend to do day 1 (i.e. stormwater piping infrastructure only/ no parking lot expansion) and what permits we are asking for? Please let me know if a brief call might be helpful to walk through this information. Jake Jacob Plummer, AIA, LEED AP BD+C Associate Principal / Director of Technical Resources Direct 317.275.6961 Cell 317.727.3299 RATIO | defining spaces, creating places, enhancing community (sm) RATIOdesign.com Indianapolis 317.633.4040 | Champaign 217.352.7696 | Raleigh 919.821.0805 | Chicago 312.465.2359 | Denver 303.607.0040 Affiliates: RATIO States, LLC | RATIO States - NC, PLLC | RATIO Architects of Ohio, LLC | RATIO|smdp, LLC Now on the RATIO blog: Community Library Wins ALA/IIDA Library Interior Design Award 5 From: Keesling, Rachel M <rkeesling@carmel.in.gov> Sent: Monday, April 20, 2020 8:02 PM To: 'Bemis, Ben' <bbemis@cecinc.com> Cc: Jake Plummer <JPlummer@ratiodesign.com> Subject: RE: Zotec Partners HQ - Signage and Landscape Questions Ben, I just added you to this new project. You should have access to it now. It wouldn’t let me delete Jake (in order to add you back in), but maybe if Ben can get in then he can release it back to the group and you can try to get in Jake. Let’s see and if not I may have to do a reset password in order for you to get in. That is weird that the old one is open, I can’t even find it in my database. Which I think is a problem…I will look into that. Let me know if this works. Thanks, Rachel Rachel Keesling Planning Administrator 317-571-2417 rkeesling@carmel.in.gov From: Bemis, Ben <bbemis@cecinc.com> Sent: Monday, April 20, 2020 6:10 PM To: Keesling, Rachel M <rkeesling@carmel.in.gov> Cc: Jake Plummer <JPlummer@ratiodesign.com> Subject: RE: Zotec Partners HQ - Signage and Landscape Questions **** This is an EXTERNAL email. Please exercise caution and Do Not open attachments or click links from unknown senders or unexpected email. **** Rachel- Neither Jake or myself received a new invite to the Zotec Project Dox site. It does appear the original site is open again, should we upload files to the original Project Dox site or was there a new invite that we may have missed or is stuck in the abyss? Thanks, Ben Benjamin E. Bemis / Senior Civil Designer Civil & Environmental Consultants, Inc. 530 E. Ohio Street · Suite G · Indianapolis, IN 46204 Toll-Free: 877-746-0749 · Fax: 317-655-7778 Mobile: (317)363-7121 · Direct: 317-613-4503 http://www.cecinc.com 6 Senior Leadership · Integrated Services · Personal Business Relationships From: Keesling, Rachel M <rkeesling@carmel.in.gov> Sent: Monday, April 20, 2020 11:29 AM To: 'Jake Plummer' <JPlummer@ratiodesign.com> Cc: Bemis, Ben <bbemis@cecinc.com>; Eli Lechter <ELechter@ratiodesign.com>; France, Todd <toddfrance@fawilhelm.com>; 'King, Jason' <JasonKing@fawilhelm.com> Subject: RE: Zotec Partners HQ - Signage and Landscape Questions Hi Jake, Yes, I think that makes sense to show it this way. Looks like the project is created in Project Dox, and waiting for you to accept the task to upload the files. Did you receive your invite email and create a log in (if not already done from a previous project)? Here are some helpful tips for uploading files: Uploading: When uploading documents, please note that each sheet of the drawings needs to be its own file. The application and other text documents can be multiple pages. Any future version of the file must be uploaded with the SAME EXACT NAME and the system will version it for us. (Do not put a new date behind it or name it Version 2, 3 , etc. yourself) Naming: In naming your files, please start with the words Landscape Plan, Site plan, etc. Do not put the name of the project or the date first. It will be easier to identify what it is if the type of plan is labeled first (there is limited space to see the title when in the system). Please see the user guide for additional naming preferences. Submitting: When you are finished uploading all of your drawings and applications/supporting documents etc., click on the Project Tasks button near the upper right and then click on your task and follow the instructions to complete your task and move the project on to the next step. Computer Requirements: ProjectDox functions best in Google Chrome. Please Note: As people finish their reviews, you will get an email notification every time that someone saves comments on a drawing. We have it send you a notification so you can start working on the change prior to when you get the task back. It’s an all or nothing thing on notifications. We can’t customize it per user. The hope is that you’ll see the comments as they come in, then have time to work on them before you get the task back uploading revisions and sending the task back to us. However, please know that just because someone saves a comment does not mean they are finished with their review. Their review is not complete until they complete their task. If you see a comment and have a question, please don’t hesitate to call or email. PDox is not meant to replace all communication – we still welcome that! This is just how we work paperless now. Please let me know if you have any questions when uploading. Thanks, Rachel Rachel Keesling Planning Administrator 317-571-2417 7 rkeesling@carmel.in.gov From: Jake Plummer <JPlummer@ratiodesign.com> Sent: Monday, April 20, 2020 8:41 AM To: Keesling, Rachel M <rkeesling@carmel.in.gov> Cc: 'Ben Bemis' <bbemis@cecinc.com>; Eli Lechter <ELechter@ratiodesign.com>; France, Todd <toddfrance@fawilhelm.com>; 'King, Jason' <JasonKing@fawilhelm.com> Subject: RE: Zotec Partners HQ - Signage and Landscape Questions **** This is an EXTERNAL email. Please exercise caution and Do Not open attachments or click links from unknown senders or unexpected email. **** Good Morning Rachel. We have completed our updated drawings associated with the stormwater/ landscape/ hardscape revisions associated with the future parking addition. At this time, Zotec is not planning to build the “future parking expansion” shown in the snip below, but would like the storm piping associated with this future improvement installed so as to avoid tearing up the main access road if/when the decision is made to add this parking after occupancy. We intend to show this as you see below and still submit the drawings for engineering and planning approval. Please confirm that this approach makes sense. As our drawings are ready, please let us know the next steps for submitting. Thanks. Jake 8 Jacob Plummer, AIA, LEED AP BD+C Associate Principal / Director of Technical Resources Direct 317.275.6961 Cell 317.727.3299 RATIO | defining spaces, creating places, enhancing community (sm) RATIOdesign.com Indianapolis 317.633.4040 | Champaign 217.352.7696 | Raleigh 919.821.0805 | Chicago 312.465.2359 | Denver 303.607.0040 Affiliates: RATIO States, LLC | RATIO States - NC, PLLC | RATIO Architects of Ohio, LLC | RATIO|smdp, LLC Now on the RATIO blog: Community Library Wins ALA/IIDA Library Interior Design Award From: Keesling, Rachel M <rkeesling@carmel.in.gov> Sent: Wednesday, April 8, 2020 10:07 PM To: Jake Plummer <JPlummer@ratiodesign.com> Cc: 'Ben Bemis' <bbemis@cecinc.com>; Eli Lechter <ELechter@ratiodesign.com> Subject: RE: Zotec Partners HQ - Signage and Landscape Questions Looks good, thanks for doing that. I will get it started in PDox for you to upload plans. Rachel Rachel Keesling Planning Administrator 9 317-571-2417 rkeesling@carmel.in.gov From: Jake Plummer <JPlummer@ratiodesign.com> Sent: Wednesday, April 8, 2020 4:42 PM To: Keesling, Rachel M <rkeesling@carmel.in.gov> Cc: 'Ben Bemis' <bbemis@cecinc.com>; Eli Lechter <ELechter@ratiodesign.com> Subject: RE: Zotec Partners HQ - Signage and Landscape Questions **** This is an EXTERNAL email. Please exercise caution and Do Not open attachments or click links from unknown senders or unexpected email. **** Rachel, Good Afternoon. I have completed the application filing through the public access portal below. Where practical I entered the same information from the original ADLS application but there were a few items where I was somewhat unsure so I entered my best guess. I hope this all makes sense. Please let me know if there are any questions. Thanks. Jake Jacob Plummer, AIA, LEED AP BD+C Associate Principal / Director of Technical Resources Direct 317.275.6961 Cell 317.727.3299 RATIO | defining spaces, creating places, enhancing community (sm) RATIOdesign.com Indianapolis 317.633.4040 | Champaign 217.352.7696 | Raleigh 919.821.0805 | Chicago 312.465.2359 | Denver 303.607.0040 Affiliates: RATIO States, LLC | RATIO States - NC, PLLC | RATIO Architects of Ohio, LLC | RATIO|smdp, LLC Now on the RATIO blog: The Re-urbanization of Hospitality From: Keesling, Rachel M <rkeesling@carmel.in.gov> Sent: Monday, April 6, 2020 1:30 PM To: Jake Plummer <JPlummer@ratiodesign.com> Cc: 'Ben Bemis' <bbemis@cecinc.com>; Eli Lechter <ELechter@ratiodesign.com> Subject: RE: Zotec Partners HQ - Signage and Landscape Questions Hi Jake, Please submit an ADLS Amend application though our new Public Access Portal for Online Applications. Create an account through the Sign Up button if you haven’t used it yet, and click Create Application at the top. From there, follow these steps: 1. Planning and Zoning 2. Plan Commission 3. ADLS – Amendment 4. Begin Application 5. Fill out all the fields (FYI – these fields are the same as our previous paper version – just now in electronic form) 6. Click Submit Please be sure to have some time set aside to fill this out. I have had a few cases where I was entering info, then got distracted with other stuff, came back and thought everything was still filling out fine, I clicked submit and it returns me to the log in screen. Can be frustrating so I just want to give a forewarning. 10 Once submitted, this will send the application to me to start the official review process. I will get the docket number from the system and you will get a new email asking you to upload your plans into Project Dox for our TAC review. Please let me know if you have any questions. Thanks, Rachel Rachel Keesling Planning Administrator 317-571-2417 rkeesling@carmel.in.gov From: Jake Plummer <JPlummer@ratiodesign.com> Sent: Monday, April 6, 2020 9:44 AM To: Keesling, Rachel M <rkeesling@carmel.in.gov> Cc: 'Ben Bemis' <bbemis@cecinc.com>; Eli Lechter <ELechter@ratiodesign.com> Subject: RE: Zotec Partners HQ - Signage and Landscape Questions **** This is an EXTERNAL email. Please exercise caution and Do Not open attachments or click links from unknown senders or unexpected email. **** Rachel, Good Morning. We will have the first of what will likely be a couple of submittals ready to file later today. This will include changes to the stormwater infrastructure to allow future capacity increase for adding approximately 62 surface spaces south of the structured garage. In addition to the utility drawings from CEC, RATIO will have updates to the Landscape Architecture / Site Features, Grading, and Planting Plans as it relates to the parking changes and addition of the monument/ directory signs. What is the best way to get this information to you officially? Thanks. Jake Jacob Plummer, AIA, LEED AP BD+C Associate Principal / Director of Technical Resources Direct 317.275.6961 Cell 317.727.3299 RATIO | defining spaces, creating places, enhancing community (sm) RATIOdesign.com Indianapolis 317.633.4040 | Champaign 217.352.7696 | Raleigh 919.821.0805 | Chicago 312.465.2359 | Denver 303.607.0040 Affiliates: RATIO States, LLC | RATIO States - NC, PLLC | RATIO Architects of Ohio, LLC | RATIO|smdp, LLC Now on the RATIO blog: The Re-urbanization of Hospitality From: Keesling, Rachel M <rkeesling@carmel.in.gov> Sent: Friday, March 27, 2020 3:11 PM To: Jake Plummer <JPlummer@ratiodesign.com> Cc: Chris Boardman <CBoardman@ratiodesign.com>; jlaw@zotecpartners.com; Doug Staley Jr 11 <dstaleyjr@staleysigns.com>; 'King, Jason' <JasonKing@fawilhelm.com>; France, Todd <toddfrance@fawilhelm.com>; Conn, Angelina V <Aconn@carmel.in.gov>; 'Ben Bemis' <bbemis@cecinc.com>; Chavez, Nathan <nchavez@carmel.in.gov>; ahurt@cecinc.com; Eli Lechter <ELechter@ratiodesign.com> Subject: RE: Zotec Partners HQ - Signage and Landscape Questions Hi Jake, I spoke with Engineering and the CRC today and they said everything is moving ahead as planned for the road projects. Regarding the ADLS Amendment for the other items, just let me know when you’re ready to submit. We have a few items we are trying to pull a virtual committee meeting together for, unsure of the date at this moment, but I’ll keep this in mind. Thanks, Rachel Rachel Keesling Planning Administrator 317-571-2417 rkeesling@carmel.in.gov From: Jake Plummer <JPlummer@ratiodesign.com> Sent: Friday, March 27, 2020 9:30 AM To: Keesling, Rachel M <rkeesling@carmel.in.gov> Cc: Chris Boardman <CBoardman@ratiodesign.com>; jlaw@zotecpartners.com; Doug Staley Jr <dstaleyjr@staleysigns.com>; 'King, Jason' <JasonKing@fawilhelm.com>; France, Todd <toddfrance@fawilhelm.com>; Conn, Angelina V <Aconn@carmel.in.gov>; 'Ben Bemis' <bbemis@cecinc.com>; Chavez, Nathan <nchavez@carmel.in.gov>; ahurt@cecinc.com; Eli Lechter <ELechter@ratiodesign.com> Subject: RE: Zotec Partners HQ - Signage and Landscape Questions **** This is an EXTERNAL email. Please exercise caution and Do Not open attachments or click links from unknown senders or unexpected email. **** Rachel: Thank you for this update. Do you anticipate any delay in city planning or engineering approvals to the road improvement (roundabouts) project timeframes? Please reference these attached (DRAFT) updated versions of Site Features Plans L201 and L202. These drawings will include updates to stormwater infrastructure and plantings to address the addition of surface parking south of the structured parking garage and the (2) signs being added to the west and north sides of the site. We anticipate issuing these drawings as part of an ADLS amendment to include the lighting, signage, parking addition, level 5 trellis, and stormwater upgrades. As previously mentioned we are also studying a potential modification to the top deck of the parking garage that could either involve green roof or some form of sunshades. The objective is to visually screen as much of the vehicles on the top deck as possible from the office building. As this study is still in concept development the final submission will likely not be ready to submit until late April or early May, so perhaps this can be an amendment #2. Please let us know your thoughts. If it is any easier, we could perhaps establish a brief call to review these changes in more detail with staff and discussion and specifics you may have. 12 Jake Jacob Plummer, AIA, LEED AP BD+C Associate Principal / Director of Technical Resources Direct 317.275.6961 Cell 317.727.3299 RATIO | defining spaces, creating places, enhancing community (sm) RATIOdesign.com Indianapolis 317.633.4040 | Champaign 217.352.7696 | Raleigh 919.821.0805 | Chicago 312.465.2359 | Denver 303.607.0040 Affiliates: RATIO States, LLC | RATIO States - NC, PLLC | RATIO Architects of Ohio, LLC | RATIO|smdp, LLC Now on the RATIO blog: The Re-urbanization of Hospitality From: Keesling, Rachel M <rkeesling@carmel.in.gov> Sent: Wednesday, March 25, 2020 9:27 PM To: Jake Plummer <JPlummer@ratiodesign.com> Cc: Chris Boardman <CBoardman@ratiodesign.com>; jlaw@zotecpartners.com; Doug Staley Jr <dstaleyjr@staleysigns.com>; 'King, Jason' <JasonKing@fawilhelm.com>; France, Todd <toddfrance@fawilhelm.com>; Conn, Angelina V <Aconn@carmel.in.gov>; Chavez, Nathan <nchavez@carmel.in.gov> Subject: RE: Zotec Partners HQ - Signage and Landscape Questions Hi Jake, Thanks for your email. Yes, there will most likely be a delay for your April BZA meeting. We had to cancel the March BZA (and Plan Commission meetings too) and will now need to find a make-up day for that meeting. We had discussed the idea of pushing March’s meeting to April, and April’s to May, etc. as one option. We also are open to having special meeting dates whenever we are allowed to meet in person again, and offer the reduced 10 day public notice requirement (instead of 20 days) for Petitioner’s required public notice. Nothing has been decided yet. We are currently working on finding ways to hold public hearings electronically, that would still allow the public to actually voice concerns in a controlled manner (vs. just writing in letters or comments). This is our hope to get caught up from the March meetings that had to be cancelled and to try to stay on target for future meetings. I have copied Angie Conn and Nathan Chavez on this email. Angie will be your best point of contact for the variance hearings and will let you know what is decided. Thanks for your patience with us. We appreciate it! Rachel Rachel Keesling Planning Administrator 317-571-2417 rkeesling@carmel.in.gov From: Jake Plummer <JPlummer@ratiodesign.com> Sent: Wednesday, March 25, 2020 7:25 AM To: Keesling, Rachel M <rkeesling@carmel.in.gov> Cc: Chris Boardman <CBoardman@ratiodesign.com>; jlaw@zotecpartners.com; Doug Staley Jr <dstaleyjr@staleysigns.com>; 'King, Jason' <JasonKing@fawilhelm.com>; France, Todd <toddfrance@fawilhelm.com> Subject: RE: Zotec Partners HQ - Signage and Landscape Questions **** This is an EXTERNAL email. Please exercise caution and Do Not open attachments or click links from unknown senders or unexpected email. **** 13 Hello Rachel, As the Zotec project continues construction based on exemption from the Governor’s directive to reduce work, our team would like to verify if there is any delay or change in process anticipated due to closure or reduced workforce impacts on the City Administration? Will there be any delay in the April BZA hearing or review of our forthcoming ADLS amendment due to impacts of COVID-19? Please let us know. Jake Jacob Plummer, AIA, LEED AP BD+C Associate Principal / Director of Technical Resources Direct 317.275.6961 Cell 317.727.3299 RATIO | defining spaces, creating places, enhancing community (sm) RATIOdesign.com Indianapolis 317.633.4040 | Champaign 217.352.7696 | Raleigh 919.821.0805 | Chicago 312.465.2359 | Denver 303.607.0040 Affiliates: RATIO States, LLC | RATIO States - NC, PLLC | RATIO Architects of Ohio, LLC | RATIO|smdp, LLC Now on the RATIO blog: The Re-urbanization of Hospitality From: Keesling, Rachel M <rkeesling@carmel.in.gov> Sent: Thursday, March 5, 2020 2:35 PM To: Jake Plummer <JPlummer@ratiodesign.com> Cc: Chris Boardman <CBoardman@ratiodesign.com>; jlaw@zotecpartners.com; Doug Staley Jr <dstaleyjr@staleysigns.com>; 'King, Jason' <JasonKing@fawilhelm.com>; France, Todd <toddfrance@fawilhelm.com> Subject: RE: Zotec Partners HQ - Signage and Landscape Questions Hi Jake, Thanks for the call today and sorry for the delayed response. Please see my comments below in red. Depending on how many of these items you may want to do, we might need to do an ADLS Amendment for them, and send that to Committee only for review. No public notice would be required. Let’s just see where we end up though. Sincerely, Rachel Rachel Keesling Planning Administrator 317-571-2417 rkeesling@carmel.in.gov From: Jake Plummer <JPlummer@ratiodesign.com> Sent: Wednesday, February 26, 2020 8:58 AM To: Keesling, Rachel M <rkeesling@carmel.in.gov> Cc: Chris Boardman <CBoardman@ratiodesign.com>; jlaw@zotecpartners.com; Doug Staley Jr <dstaleyjr@staleysigns.com>; 'King, Jason' <JasonKing@fawilhelm.com>; France, Todd <toddfrance@fawilhelm.com> Subject: Zotec Partners HQ - Signage and Landscape Questions **** This is an EXTERNAL email. Please exercise caution and Do Not open attachments or click links from unknown senders or unexpected email. **** Rachel, 14 Good Morning. We are reaching out to you with a few key questions/ points as the project really ramps up the pace of construction over the coming months.  SIGNAGE – As you may be aware, Zotec/ RATIO have been working with Staley Signs to develop the signage package for the project. o Monument Sign - We have worked closely with Doug Staley to develop the exterior, façade mounted signs in addition to a single monument sign along Illinois Street at the west entry drive. o RATIO will create some graphics to explain our design, but are envisioning a back-lit glass that matches the color of the building glass which will be attached to a concrete wall with individual round fittings. Over the glass, we intend to mount cut aluminum lettering for the “ZOTEC Partners” brand logo that will be visible on both the N/S side of this monument sign. The size will be 6’ tall x 20’ wide. o Directory Sign – Similar to the monument sign, we intend to add a directory sign that will land at the east side of Zotec Way north of the garage. The size will not exceed 20sf or roughly 3’ x 6’, and will use similar back-lit glass and aluminum cut lettering. *Do you see any issues with what is being proposed above? I will have to defer to Nathan Chavez, our sign permit specialist on this. I know Doug has emailed us the sign package and I’m sure Nathan is working on reviewing that. (I have not had a chance to look at it yet, I’m sorry.) I think as long as you are meeting the Bridges PUD requirements for size, you should be good. As I mentioned on the phone, I do know off hand that the UDO requires a masonry base for any ground sign, which we would like to see incorporated here if possible. But the idea/design sounds very neat and innovative.  GARAGE – The Parking Garage Structure design has been modified and is being constructed in a manner that could allow a potential expansion of the structure to the south in the future to accommodate up to 260 cars, should Zotec realize this need. Please note that these changes will not be visible other than a change to downturned beams at the south end of the garage with cable rail. The proposed/ submitted fin tube screening around the perimeter will remain unchanged. o Our consulting civil engineer CEC is working on a revision to the stormwater system to accommodate either this future parking deck extension, or an addition of paved asphalt to the south of the garage currently under construction to accommodate 65 cars. During this process, Zotec has asked RATIO and th FA Wilhelm to explore the impacts of not providing parking on the top (5) level of the garage structure so that they could in some manner screen the cars from the view of the office building. One potential solution being considered is to convert the top level, which comprises roughly 90-100 spaces, into a green roof (intensive/ tray system). This is a concept at this point, but in doing so this would result in a net loss of the parking count by roughly 30 spaces after adding the surface parking. *We are looking for feedback from the City of Carmel prior to making any further progress on this study. We would LOVE to see a green roof installed here! This would be a great addition to the project and something we could both boast about. We would be ok with expanding the parking to the south on a surface lot, so long as drainage is accounted for, and landscaping is revised accordingly. We would also want to make sure that sidewalks and pedestrian circulation is not impacted. I would want to see new plans and elevations showing the changes.  LIGHTING – RATIO has been working with the Electrical Contractor and ESL spectrum to develop some additional supplemental/ feature lighting schemes to the exterior of the building and the garage. Thus far, this has only been a study with supporting pricing for Zotec to consider but we obviously want to verify with the City of Carmel that what is being proposed is acceptable. Included in this lighting proposal: o Recessed, linear strip LED lighting at the underside of the soffits/ canopies that would accentuate the curvatures of the building geometry. We are a little hesitant on LED strip lighting, but are willing to see your renderings for it and how/where it is recessed. We really just want to make sure that light is continuous and there are no hot spots or breaks in the light that make it look not as well done. We also 15 don’t want to over-light the building, and would be interested to see ideas for key areas to be lit with exterior up/down lights or lights washing the façade instead of LED strip lighting. th o Uplighting at the added trellises at the 5 level terraces to highlight the sunshades. Generally ok with this proposal. o Options to add down lighting around the perimeter of the parking garage to accentuate the fin tube screening elements. This seems like a good idea, we would want to see the renderings you have for it, as well as make sure that the garage is not lit internally all night, which would then detract from any exterior architectural feature lighting you may install. o RATIO has updated renderings that can be shared for your review. Yes, please share. th  TRELLIS – I believe we sent some initial images of the proposed trellises at the 5 floor terraces. We can provide some additional drawings as needed to support this change request. These are ok as proposed, I will add them to your file. Apologies for the length of this email, but in the interest of addressing all of the changes we want to make sure we are being as transparent as possible throughout this process. If it would be beneficial, we would be happy to meet in person to walk through each of these items. Thank you for your consideration. Jake Jacob Plummer, AIA, LEED AP BD+C Associate Principal / Director of Technical Resources Direct 317.275.6961 Cell 317.727.3299 RATIO | defining spaces, creating places, enhancing community (sm) RATIOdesign.com Indianapolis 317.633.4040 | Champaign 217.352.7696 | Raleigh 919.821.0805 | Chicago 312.465.2359 | Denver 303.607.0040 Affiliates: RATIO States, LLC | RATIO States - NC, PLLC | RATIO Architects of Ohio, LLC | RATIO|smdp, LLC Now on the RATIO blog: RATIO + Henning Larsen to Design New Civic Tower in Raleigh 16