HomeMy WebLinkAboutLD101 - Tree Protection and Removal PlanOHU OHUOHUE EEEBUSONLYOHU OHU OHUOHU OHUOHU OHU OHU OHU OHU OHU OHUOHU OHU OHU OHU OHU OHU OHU OHUOH U
OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHUOHU OHU OHU OHU OHU OHU OHU OHU OHU OHUOHUOHUEE
E
E
E
E
E
EE
E
E EC
EEE EG
G G G G G G G
EE EEEEEEEEE E
E
EE E EE
E E E E E E
E E E E E E E
G
E
E
E E E E E E E E
E
EEEEEEEE EEE
E
E E
E EEE E E
EEEEE E E
E E
EEE
E EEEEE
E E
E
E E EE
E EE EE EE
EE EEEEE E E
E
E
E
E
E
E EE EEEE E EE EEE EEE EEEEE
E
Proposed Building
111,802 sq. ft.
FFE: 855.80FUT URELI BRARY DRIVEBUSONLYSTOPSTOP DO NOTENTERSTOPSTOP
STOPHLH L0
Scale 1" = 40'-0"
80'40' 20'
North
1. For more detail on tree protection and fencing refer to specifications.
2. Tree Protection Fencing locations are fixed. Install exactly where shown on these plans. Any adjustments to fencing
locations must be approved by the Owner. Damages will be assessed if tree protection fence location is adjusted without
Owner approval. Fence deviation from this plan or approved change will be corrected by the General Contractor prior to
the start of construction.
3. All tree pruning and limb restraint will be performed under the direct supervision of a Certified Arborist. Contractor shall
not prune trees or restrain limbs.
4. No staging, equipment, material storage, or vehicles are allowed on non-paved areas unless indicated otherwise on plan.
5. Abandon all utilities to be removed when located within a Protected Root Zone.
6. Backfill all depressed and void areas with top soil following removal of vegetation. Soil shall be free of debris. Compact
soils to ensure settling and sedimentation do not occur.
7. Owner is responsible for transplanting identified trees, as noted. Coordinate with Owner if trees to be transplanted remain
on site when mobilization begins.
8. Cleanly cut all roots encountered during construction. Contractor to Air-knife all roots around trees around all indicated
as being essential to the campus landscape vocabulary and any tree over 18" in diameter.
9. Coordinate locations of Tree Protection Fencing and Construction Fencing prior to the start of construction activities. In
areas where Tree Protection and Construction Fences overlap, the Contractor may elect to install the more restrictive
fence type of the two provided that the single fence accommodates the requirements of both fences.
10. Trimming of existing trees shall occur no later than March 15th. All tree trimming shall be under the direct supervision of
a certified arborist.
11. If construction fencing limits access to tree area then tree protection fencing is not necessary.
TREE PROTECTION GENERAL NOTES TREE PRESERVATION LEGEND
Trees to be Protected
Trees to be Removed
Tree Protection Fence Locations -
To be installed PRIOR TO DEMOLITION
LOCATOR MAP
TREE PRESERVATION CHART
NUMBER TREE SPECIES CALIPER TREATMENT TREE
CREDIT
31 Walnut -- REMOVE 0
32 Walnut (Multi-stem) 35"+28" PROTECT 15 SHD
33 Walnut (Multi-stem) 12"+15"+17" PROTECT 11 SHD
34 Walnut 9" PROTECT 2 SHD
35 Maple 8" PROTECT 2 SHD
36 Walnut 7" PROTECT 1 SHD
37 Pear -- REMOVE 0
LD100
LD101
Not To Scale
Matchline Refer to LD100 Matchline Refer to LD100
31
32
33
35
34
36
37
CUMULATIVE TREE CREDIT SUMMARY
TREE TYPE
ABBREVIATION TREE TYPE CUMULATIVE
TREE CREDIT
ORN ORNAMETNAL TREE 3
EVR EVERGREEN TREE 24
SHD SHADE TREE 99
05/27/20