Loading...
HomeMy WebLinkAbout19012L-StormReport-Apr2020TECHNICAL REPORT Carmel Elementary Reconstruction 101 4th Avenue SE, Carmel, Indiana 46032 Karen K. Collins, PE Indiana registration No. 10404538 PREPARED FOR CARMEL CLAY SCHOOLS 5201 EAST MAIN STREET CARMEL, IN 46033 April 2020 8365 Keystone Crossing, Suite 201 Indianapolis, Indiana 46240 Phone: (317) 202-0864 Fax: (317)202-0908 05/27/20 05/27/20 CARMEL ELEMENTARY SCHOOL TABLE OF CONTENTS TECHNICAL BRIEF Includes maps: FEMA FIRM (Flood Insurance Rate Map) Flood Zone Map Zoning Map Land Classification Map Soils Map Retention Table PROPOSED DRAINAGE AREA MAP Appendix A EXISTING DRAINAGE AREA MAP Appendix B STORM WATER SEWER INLET CALCULATIONS Appendix C STORM WATER SEWER HYDRAULIC CALCULATIONS Appendix D EXISTING DRAINAGE MODEL (8 SUB-BASINS) Appendix E PROPOSED DRAINAGE MODEL (8 SUB-BASINS) INCLUDING DETENTION CALCULATIONS Appendix F WATER QUALITY CALCULATIONS Appendix G DETAILS OF XCELERATOR XC-6 & XC-7 & DETENTION STRUCTURE Appendix H EXHIBIT: 100-YEAR PONDING LIMITS Appendix I DETENTION VOLUME CALCULATION Appendix J 05/27/20 CARMEL ELEMENTARY SCHOOL 1 | Page ABSTRACT This Technical Brief pertaining to storm water drainage has been prepared for the purposes of demonstrating governmental compliance with the current technical rules, regulations and requirements of the governing authorities, in particular elements applicable to storm water management including detention, water quality treatment and / or best management practices (BMPs). The City of Carmel is taking the lead as the primary governing jurisdictional body (as well as also having jurisdictional authority governing potable water and sanitary sewer to this site). The total area of the site is 16.09 acres. The existing site is already in-use as an elementary school and owned by Carmel Clay Schools (CCS). CCS proposes to improve this land with a new elementary school to replace the existing one, and to retire the existing baseball fields named Wodock Fields. There is one existing and proposed entrance on 4th Avenue. A future second proposed entrance may be coming from the south, from Lincoln Court. The four (4) baseball fields to be retired are to be replaced by four (4) proposed little league baseball fields at the new elementary school proposed at 12025 Clay Center Road. The storm water detention pond is designed as an underground structure consisting of 7-foot diameter perforated CMP pipes. Storm water topics which shall be addressed and demonstrated in compliance include drainage area delineation, retention calculations, hydraulic grade line calculations, water quality calculations, and inlet calculations. 05/27/20 CARMEL ELEMENTARY SCHOOL 2 | Page FLOOD MAP ZONE The FIRM Map Panel No. 18057C0226G dated November 11, 2019 indicates that this watershed falls entirely within Flood Zones X. Flood Hazard zone X includes areas that are determined to be outside the 0.2% annual chance of flood. FEMA FIRM Map 18057C0226G 05/27/20 CARMEL ELEMENTARY SCHOOL 3 | Page ZONING The project is in the R-2 residential zoning district, as shown in the below map, taken from the Carmel GIS Viewer. City of Carmel Zoning Map 05/27/20 CARMEL ELEMENTARY SCHOOL 4 | Page SOILS The existing soils include two primary classifications: Crosby Silt Loam (0 to 2 percent slopes) and Miami Silt Loam (2 to 6 percent slopes). The two soils account for 100% of the site area, with Crosby Silt Loam dominating (95%). 05/27/20 CARMEL ELEMENTARY SCHOOL 5 | Page The hydrologic soil group designation is our interest here. We have C /D and C soils, with C/D being 95% or more of this development. The standard engineering protocol is to downgrade to the lowest possible class if there is a choice to make, and the lowest is hydrologic soil group D. For simplicity and to be conservative, Class / type D soil causes the most runoff and is therefore 05/27/20 CARMEL ELEMENTARY SCHOOL 6 | Page accepted as being the most conservative class / type to select for engineering studies / calculations such as these. Detailed Descriptions of the primary site soil types are as follows: CrA Crosby silt loam, 0 to 2 percent slopes This is a somewhat poorly drained soil with a seasonal high water table at 0.5 to 2.0 ft. This soil is located on rises on till plains; slopes are 0 to 2 percent. The native vegetation is hardwood forest. The surface layer is silt loam and has moderately low to moderate organic matter content (1.0 to 3.0 percent). Permeability is very slow (<0.06 in/hr) in the most restrictive layer above 60 inches. Available water capacity is moderate (6.2 inches in the upper 60 inches). The pH of the surface layer in non-limed areas is 5.1 to 6.5. Droughtiness and wetness are concerns for crops production. This soil responds well to tile drainage; it is designated potentially highly erodible (class 2) in the Highly Erodible Land (HEL) classification system. MmB2 Miami silt loam, 2 to 6 percent slopes, eroded This is a moderately well drained soil with a seasonal high water table at 2.0 to 3.5 feet and is on side slopes and rises on uplands. Slopes are 2 to 6 percent. The native vegetation is hardwoods. The surface layer is silt loam and has moderately low organic matter content (1.0 to 2.0 percent). Permeability is very slow (<0.06 in/hr) in the most restrictive layer above 60 inches. Available water capacity is low (5.7 inches in the upper 60 inches). The pH of the surface layer in non-limed areas is 5.1 to 6.0. Droughtiness and water erosion are management concerns for crop production. STORM WATER SEWERS AND INLETS Storm water sewer inlet calculations and hydraulic grade line calculations have been prepared which demonstrate that the proposed storm water sewer system (inlets and pipes) has been properly designed to both intercept and convey the rational method 10-year storm event and therefore is compliant per City of Carmel standards. CAPACITY AND ACCEPTANCE OF DOWNSTREAM RECEIVING STORM WATER SYSTEM It is proposed that the detention basin will discharge to the north by pipe to an existing closed storm sewer system that leads to Main Street and ultimately to Cool Creek. This does not connect directly to a Hamilton County regulated drain. There are 8 sub-basins considered for the purposes of storm water modelling as it relates to detention. All 8 sub-basins appear to drain to Cool Creek watershed. Per meeting and pre- approval with the City of Carmel Engineering personnel, the retention basin allowable release 05/27/20 CARMEL ELEMENTARY SCHOOL 7 | Page rate is based upon not increasing actual existing flows to all points of consideration. This means that the 0.1 cfs / acre 10-year storm and 0.3 cfs / acre 100-year storm are not applicable. It should be noted that a small section of the overall catchment will drain to White River – Carmel Creek. This area will be reduced in the proposed condition as shown in the detention results. USGS Map: FISHERS (CARMEL USGS map is immediately west of this map) It is proposed that this development will connect to an existing 18-inch pipe that is heading through the Library property to the north and thence toward Main Street and ultimately to Cool Creek. 05/27/20 CARMEL ELEMENTARY SCHOOL 8 | Page WATER QUALITY The storm water for the site will be treated by a 2-component in-series treatment train system. The first BMP in the treatment train is an Aquashield Xcelerator. Three Aquashield Xcelerators are proposed to treat 3 separate pipe systems all inbound to the detention basin. The second BMP in the treatment train is isolator rows in the detention basin system (isolator row qualifies and a second treatment BMP). Storm water sewer water quality calculations have been prepared which demonstrate that the proposed storm water sewer system (inlets and pipes) including water quality devices (Best Management Practices)(BMPs) has been properly designed to treat the 1-inch 24-hour Type 2 SCS / NRCS rainfall event and therefore is compliant per City of Carmel standards. Proposed site disturbance is approximately 15 acres. Water quality devices are able to be employed to treat the maximum extent practicable. Approximately 2.0 acres of disturbed area (of the 15.0 acres to be disturbed) is proposed to be released without treatment due to site grading constraints and grandfather-clause equivalency of classification as it relates to existing improvements being modified. DETENTION INCLUDING MODELING, RELEASE AND SEDIMENT VOLUME Detention is provided with a maximum release rate of as currently developed, as pre-approved in a meeting with Carmel Engineering. A bottom of detention pipe system is planned with an elevation of 843.8 feet (existing pipe flowline to be connected to). 7.79 feet above that, 850.59 is proposed as the 100-year (1% annual chance) high water surface elevation. An outlet structure has been determined to not be required because the existing 18-inch outlet pipe restricts the flow sufficiently to stay under the existing release rates, and to safeguard against causing flooding to the maximum extent practicable. HydroCAD was used to model the detention. 10% extra volume for sediment is included in the detention basin volume calculations. SUMMARY All inlets pipes, and detention basin have been designed in accordance with the most current requirements. Detailed detention results are shown on the following table. It has been demonstrated that every point of consideration has been designed in a way to cause less flow to occur. This applies to all 8 drainage points of consideration. At the outfall point called “Piped North”, in the existing model the 100-year flow rate is 63.68 cfs. In the proposed model the flow rate is 21.36 cfs. This is 1/3 of the original amount piped north. 05/27/20 CARMEL ELEMENTARY SCHOOL 9 | Page 05/27/20 CARMEL ELEMENTARY SCHOOL APPENDIX A: PROPOSED DRAINAGE AREA MAP 05/27/20 TSTOPSTOP DO NOTENTERSTOP 1234567891012345678910STOP STOPBUSONLYDRIVE TO BE CONSTRUCTED BY OTHERS WALK TO BE CONSTRUCTED BY OTHERSPROPOSED BMP & ACCESS EASEMENT P R O P O S E D B M P & A C C E S S E A S E M E N T N O PARKINGNO PARKI NGNO PARKINGH.Pt. 15' ELEC ESMT 4TH A V E N U E STOPSTOP DO NOTENTERSTOP 12 34567891012345678910 STOP STOPBUSONLYDRIVE TO BE CONST R UCTED BY OTHE RS W ALK T O BE CONSTRUCTED BY OTHERSPROPOSED BMP & ACCESS EASEMENT P R O P O S E D B M P & A C C E S S E A S E M E N T 0.47 AC IMP 0.00 AC PERV 0.62 AC IMP 0.01 AC PERV 0.22 AC IMP 0.15 AC PERV 0.40 AC IMP 0.74 AC PERV 0.00 AC IMP 0.20 AC PERV 0.04 AC IMP 0.37 AC PERV 0.23 AC IMP 0.05 AC PERV 0.02 AC IMP 0.14 AC PERV 0.07 AC IMP 0.06 AC PERV0.2 4 AC I MP0.01 AC PERV0.11 AC IMP 0.29 AC PERV 0.14 AC IMP 0.03 AC PERV 0.21 AC IMP 0.11 AC PERV 0.15 AC IMP 0.07 AC PERV 0.24 AC IMP 0.02 AC PERV 0.27 AC IMP 0.23 AC PERV 0.20 AC IMP 0.04 AC PERV0.17 AC IMP 0.07 AC P E RV 0.04 AC IMP 0.10 AC PERV 0.30 AC IMP 0.00 AC PERV 0.28 AC IMP 0.00 AC PERV 0.14 AC IMP 0.00 AC PERV 0.14 AC IMP 0.00 AC PERV 0.72 AC IMP 0.00 AC PERV 0.05 AC IMP 0.03 AC PERV 0.15 AC IMP 0.00 AC PERV 0.27 AC IMP 0.00 AC PERV 0.14 AC IMP 0.00 AC PERV 0.14 AC IMP 0.00 AC PERV 0.09 AC IMP 0.00 AC PERV 0.05 AC IMP 0.01 AC PERV0.12 AC IMP0.08 AC PERV0.02 AC IMP0.05 AC PERV0. 1 4 A C I MP0. 0 0 A C P ERV 0.0 4 A C IMP 0.0 0 A C PE RV 0.0 4 A C I MP0.0 5 A C PER V0.01 AC IMP 0.06 A C PE RV0.05 AC IMP 0.00 AC PE R V 0.02 AC IMP 0.00 AC PE RV 0. 0 4 A C I MP0. 0 0 A C P E RV 0.0 3 A C I MP 0.0 1 A C PE R V0.01 AC IMP 0.63 AC PERV 0.00 AC IMP 0.47 AC PERV 0.00 AC IMP0.49 AC PERV0.00 AC IMP0.23 AC PERV0.0 1 A C I MP0.0 4 A C PE RV0.02 AC IMP 0.14 AC PERV 0.33 AC IMP 0.66 AC PERV 0.21 AC IMP 0.09 AC PERV 0.18 AC IMP 0.18 AC PERV 0.09 AC IMP 0.02 AC P E R V 0.16 AC IMP 0.04 AC PERV 0.04 OFFSITE IMP 0.27 AC IMP 0.21 AC PERV 0.00 AC IMP 0.32 AC PERV 0.00 AC IMP 0.28 AC PERV 0.27 AC IMP 0.07 AC PERV 0.12 AC IMP 0.10 AC PERV 0.06 AC IMP 0.18 AC PERV0.10 AC IMP0.03 AC PERV0.07 AC IMP0.08 AC IMP 0.10 AC IMP SHEET No. SCALE: Date:PROJECT:TITLE: Job No.8365 Keystone Crossing, Suite 201Indianapolis, IN. 46240 (317) 202-0864PROPOSEDDRAINAGE AREAS P1 02-13-20 1"= 60' South node S to South East nodeE to EastSW to SW North collector node Piped North Detention Basin NW to NW to North - to Offsite Inlet to North - to Onsite Inlet to Detn to North - to Offsite Inlet to North - to 4th Ave STM 713 STM 773STM 780 STM 785 STM 784 S T M 7 8 1 STM 782STM775 STM 786STM 724 STM 714 STM 723 STM 715 STM 716 STM 726 STM 788 S TM 7 2 8 STM 718 STM 720STM 727STM 729 S T M 7 3 0 STM 753 STM 760 STM 747 STM 746 STM 744 STM 743 STM 783STM 778 S T M 7 5 7 STM 747 STM 759 STM 727 STM 728 STM 722 STM 749 STM 749 STM 758 STM 779STM 787STM 759 STM 749 STM 717 STM 716 EX INLET STM 724STM777 STM 797 STM 796 STM 795 05/27/20 TSTOPSTOP DO NOTENTERSTOP STOP STOPBUSONLYDETENTION: 7' CMP FL / INV 843.8 (FLAT: 0% SLOPE) (TOP OF PIPE 850.8) HW100= 850.7 PROPOSED BMP & ACCESS EASEMENT P R O P O S E D A C C E S S E A S E M E N TRDRDN O PARKINGNO PARKI NGNO PARKINGH.Pt.OHUOHUOHU OHU OHUOHU OHUOHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHUOHU OHU E E EE4TH A V E N U E STOPSTOP DO NOTENTERSTOP STOP STOPBUSONLYDETENTION: 7' CMP FL / INV 843.8 (FLAT: 0% SLOPE) (TOP OF PIPE 850.8) HW100= 850.7 PROPOSED BMP & ACCESS EASEMENT P R O P O S E D A C C E S S E A S E M E N TSHEET No. SCALE: Date:PROJECT:TITLE: Job No.8365 Keystone Crossing, Suite 201Indianapolis, IN. 46240 (317) 202-0864PROPOSED OVERALLDRAINAGE AREAS P1 01-03-20 1"= 60' South node S to South East nodeE to East SW to SW North collector node Piped North Detention Basin NW to NW to North - to Offsite Inlet to North - to Onsite Inlet to Detn to North - to Offsite Inlet to North - to 4th Ave EX INLET CN=80 CN=80CN=80 CN=80 CN=91 CN=80 CN=80 CN=80 CN=92 CN=91 CN=93 CN=80 05/27/20 CARMEL ELEMENTARY SCHOOL APPENDIX B: EXISTING DRAINAGE AREA MAP 05/27/20 Xref .\Xref\Carmel_Ground Floor_2019 - 09-12.dwg 4TH A V E N U E Xref .\Xref\Carmel_Ground Floor_2019 - 09-12.dwg 0.06 AC IMP 1.99 AC PERV 0.08 AC IMP 2.55 AC PERV 0.02 AC IMP 2.81 AC PERV0.00 AC IMP0.71 AC PERV4.58 AC IMP 1.60 AC PERV 0.04 AC OFFSITE IMP 0.38 AC IMP 0.15 AC PERV 0.06 AC IMP 0.40 AC PERV 0.49 AC IMP 0.17 AC PERV PIPED TO NORTH Piped North node TO OFFSITE INLET TO ONSITE INLET TO 4TH AVE E S SW NW to NW North - to NE - to Onsite Inlet to North - to Offsite Inlet to East to SW to South East node to North - to 4th Ave North collector node SHEET No. SCALE: Date:PROJECT:TITLE: Job No.8365 Keystone Crossing, Suite 201Indianapolis, IN. 46240 (317) 202-0864EXISTINGDRAINAGE AREAS E1 01-02-20 1"= 120' South node 05/27/20 CARMEL ELEMENTARY SCHOOL APPENDIX C: STORM WATER SEWER INLET CALCULATIONS 05/27/20 Inlet calculations & areas summed to detention, plus splits to BMP treatment #1: Xcelerators: one (1) XC-5 & two (2) XC-6 units Project 19012L 4th Ave Carmel School by Mark Kilgore, P.E. 10-yr x 1.9= 10-yr surface 10-yr 10-yr 100-yr 100-yr 100-yr available total flow flow flow flow flow flow flow ponding to inlet to inlet into inlet past inlet to inlet into inlet past inlet (ft/ft) (ft) imperv pervious Area I (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) program # C3D # slope depth acres acres x C (in/hr) Q= CIA Q= CIA intaken bypass Q= CIA intaken bypass inlet chosen to XC area 726 to 725 726 0.10 0.30 0.00 0.27 7.20 1.94 0.39 0.39 0.00 0.74 0.74 0.00 24" Nyloplast 1 725 to 717 725 n/a 0.00 0.00 0.00 7.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 MH 1 729 to 727 729 0.50 0.05 0.03 0.05 7.20 0.37 0.37 0.37 0.00 0.70 0.70 0.00 24" Nyloplast 1 728 to 727 728 0.80 0.19 0.05 0.18 7.20 1.30 0.43 0.43 0.00 0.82 0.82 0.00 24" Nyloplast 1 727 to 719 727 0.80 0.15 0.06 0.15 7.20 1.06 0.26 0.26 0.00 0.50 0.50 0.00 GI R3405 1 724 to 723 724 0.50 0.18 0.10 0.18 7.20 1.31 1.31 1.31 0.00 2.49 2.49 0.00 GI R3405 1 723 to 714 723 0.50 0.07 0.06 0.08 7.20 3.40 3.40 3.40 0.00 6.46 6.46 0.00 GI R3405 1 730 to 721 730 0.10 0.27 0.00 0.24 7.20 1.75 0.52 0.52 0.00 1.00 0.75 0.25 24" Nyloplast 1 722 to 721 722 n/a 0.14 0.00 0.13 7.20 0.91 0.00 0.00 0.00 0.00 0.00 0.00 MH 1 721 to 720 721 n/a 0.00 0.00 0.00 7.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 MH 1 720 to 719 720 1.30 0.62 0.01 0.56 7.20 4.03 4.03 4.03 0.00 7.66 7.66 0.00 GI R3405 1 719 to 718 719 n/a 0.00 0.00 0.00 7.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 MH 1 718 to 717 718 1.30 0.47 0.00 0.42 7.20 3.05 3.05 3.05 0.00 5.79 5.79 0.00 GI R3405 1 717 to 716 717 0.50 0.01 0.04 0.02 7.20 0.12 0.12 0.12 0.00 0.23 0.23 0.00 GI R3405 1 716 to 715 716 0.50 0.16 0.05 0.15 7.20 1.11 0.28 0.28 0.00 0.53 0.53 0.00 GI R3405 1 715 to 714 715 0.50 0.02 0.14 0.05 7.20 0.33 0.33 0.33 0.00 0.63 0.63 0.00 GI R3405 1 714 to 731 714 0.50 0.23 0.05 0.22 7.20 1.56 1.56 1.56 0.00 2.97 2.97 0.00 GI R3405 1 713 to 731 713 1.50 0.40 0.74 0.51 7.20 3.66 3.66 3.66 0.00 6.95 6.95 0.00 GI R3405 1 731 to 712 731 n/a 0.00 0.00 0.00 7.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 MH 1 712 to 710 712 n/a 0.00 0.00 0.00 7.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 flow-splitter MH 1 711 to 710 711 n/a 0.00 0.00 0.00 7.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 XC-7 1 710 to end 710 n/a 0.00 0.00 0.00 7.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 flow-re-join MH 1 3.26 1.33 ac imp ac perv 757 to 756 757 0.70 0.21 0.09 0.21 7.20 1.49 1.49 1.49 0.00 2.83 2.83 0.00 CI R3010 2 760 to 748 760 0.50 0.12 0.18 0.14 7.20 1.04 1.04 1.04 0.00 1.97 1.97 0.00 CI R3010 2 759 to 748 759 0.50 0.77 0.01 0.70 7.20 5.00 0.35 0.35 0.00 0.67 0.67 0.00 GI R3405 2 758 to 759 758 n/a 0.04 0.00 0.04 7.20 0.26 0.00 0.00 0.00 0.00 0.00 0.00 MH 2 761 to 750 761 1.00 0.05 0.00 0.05 7.20 0.32 0.32 0.32 0.00 0.62 0.62 0.00 GI R3405 AM GT 2 762 to 751 762 0.50 0.02 0.00 0.02 7.20 0.13 0.03 0.03 0.00 0.05 0.05 0.00 GI R3405 2 753 to 752 753 0.50 0.22 0.15 0.23 7.20 1.64 1.64 1.64 0.00 3.12 3.12 0.00 CI R3010 2 752 to 751 752 n/a 0.00 0.00 0.00 7.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 MH 2 751 to 750 751 n/a 0.00 0.00 0.00 7.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 MH 2 750 to 749 750 n/a 0.09 0.00 0.08 7.20 0.58 0.58 0.58 0.00 1.11 1.11 0.00 MH 2 749 to 748 749 0.50 0.31 0.07 0.29 7.20 2.11 2.11 2.11 0.00 4.01 4.01 0.00 CI R3010 2 748 to 747 748 n/a 0.00 0.00 0.00 7.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 MH 2 747 to 756 747 0.50 0.27 0.23 0.29 7.20 2.08 2.08 2.08 0.00 3.95 3.95 0.00 CI R3010 2 756 to 745 756 0.50 0.12 0.08 0.12 7.20 0.89 0.89 0.89 0.00 1.70 1.70 0.00 CI R3010 2 745 to 743 745 n/a 0.00 0.00 0.00 7.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 MH 2 744 to 745 744 0.90 0.19 0.10 0.19 7.20 1.38 1.38 1.38 0.00 2.61 2.61 0.00 CI R3010 2 743 to 734 743 0.90 0.18 0.18 0.20 7.20 1.43 1.43 1.43 0.00 2.71 2.71 0.00 CI R3010 2 736 to 735 736 1.00 0.02 0.14 0.05 7.20 0.33 0.33 0.33 0.00 0.63 0.63 0.00 GI R3405 2 735 to 734 735 n/a 0.00 0.00 0.00 7.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 MH 2 734 to 742 734 n/a 0.00 0.00 0.00 7.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 MH 2 742 to 732 742 n/a 0.00 0.00 0.00 7.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 flow-splitter MH 2 733 to 732 733 n/a 0.00 0.00 0.00 7.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 XC-6 2 732 to end 732 n/a 0.00 0.00 0.00 7.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 flow-re-join MH 2 2.61 1.23 ac imp ac perv 783 to 780 783 0.50 0.24 0.01 0.22 7.20 1.57 0.16 0.16 0.00 0.30 0.30 0.00 CI R3010 3 786 to 775 786 0.40 0.16 0.04 0.15 7.20 1.09 1.09 1.09 0.00 2.08 2.08 0.00 CI R3010 3 782 to 781 782 0.50 0.24 0.02 0.22 7.20 1.58 1.58 1.58 0.00 3.01 3.01 0.00 CI R3010 3 788 to 776 788 0.10 0.28 0.00 0.25 7.20 1.81 0.54 0.54 0.00 1.03 0.75 0.28 24" Nyloplast 3 787 to 782 787 0.50 0.09 0.02 0.09 7.20 0.61 0.61 0.61 0.00 1.16 1.16 0.00 CI R3010 3 785 to 784 785 0.50 0.11 0.29 0.16 7.20 1.13 1.13 1.13 0.00 2.15 2.15 0.00 CI R3010 3 784 to 781 784 0.50 0.14 0.03 0.13 7.20 0.95 0.95 0.95 0.00 1.81 1.81 0.00 CI R3010 3 781 to 780 781 0.50 0.21 0.11 0.21 7.20 1.52 1.52 1.52 0.00 2.89 2.89 0.00 CI R3010 3 780 to 773 780 1.10 0.04 0.37 0.11 7.20 0.79 0.79 0.79 0.00 1.50 1.50 0.00 GI R3405 3 779 to 778 779 0.30 0.21 0.01 0.19 7.20 1.38 0.22 0.22 0.00 0.42 0.42 0.00 24" Nyloplast 3 778 to 777 778 0.50 0.20 0.04 0.19 7.20 1.35 1.35 1.35 0.00 2.57 2.57 0.00 CI R3010 3 777 to 776 777 0.50 0.17 0.07 0.17 7.20 1.20 1.20 1.20 0.00 2.28 2.28 0.00 CI R3010 3 776 to 775 776 n/a 0.00 0.00 0.00 7.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 MH 3 775 to 781 775 0.50 0.15 0.07 0.15 7.20 1.07 1.07 1.07 0.00 2.04 2.04 0.00 CI R3010 3 773 to 772 773 1.10 0.33 0.66 0.43 7.20 3.09 3.09 3.09 0.00 5.87 5.87 0.00 GI R3405 3 772 to 770 772 n/a 0.00 0.00 0.00 7.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 flow-splitter MH 3 771 to 770 771 n/a 0.00 0.00 0.00 7.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 XC-6 3 770 to end 770 n/a 0.00 0.00 0.00 7.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 flow-re-join MH 3 2.57 1.74 ac imp ac perv ex inlet 853.16 0.80 0.00 0.20 0.04 7.20 0.29 0.29 0.29 0.00 0.55 0.55 0.00 GI R3405 none 8.44 4.50 ac imp ac perv 05/27/20 CARMEL ELEMENTARY SCHOOL APPENDIX D: STORM WATER SEWER HYDRAULIC CALCULATIONS 05/27/20 05/27/20 05/27/20 05/27/20 05/27/20 05/27/20 05/27/20 05/27/20 CARMEL ELEMENTARY SCHOOL APPENDIX E: EXISTING DRAINAGE MODEL (8 SUB-BASINS) 05/27/20 05/27/20 Xref .\Xref\Carmel_Ground Floor_2019 - 09-12.dwg 4TH A V E N U E Xref .\Xref\Carmel_Ground Floor_2019 - 09-12.dwg 0.06 AC IMP 1.99 AC PERV 0.08 AC IMP 2.55 AC PERV 0.02 AC IMP 2.81 AC PERV0.00 AC IMP0.71 AC PERV4.58 AC IMP 1.60 AC PERV 0.04 AC OFFSITE IMP 0.38 AC IMP 0.15 AC PERV 0.06 AC IMP 0.40 AC PERV 0.49 AC IMP 0.17 AC PERV PIPED TO NORTH Piped North node TO OFFSITE INLET TO ONSITE INLET TO 4TH AVE E S SW NW to NW North - to NE - to Onsite Inlet to North - to Offsite Inlet to East to SW to South East node to North - to 4th Ave North collector node SHEET No. SCALE: Date:PROJECT:TITLE: Job No.8365 Keystone Crossing, Suite 201Indianapolis, IN. 46240 (317) 202-0864EXISTINGDRAINAGE AREAS E1 01-02-20 1"= 120' South node 05/27/20 05/27/20 05/27/20 05/27/20 05/27/20 05/27/20 05/27/20 05/27/20 05/27/20 05/27/20 05/27/20 05/27/20 05/27/20 05/27/20 05/27/20 05/27/20 05/27/20 05/27/20 05/27/20 05/27/20 05/27/20 05/27/20 05/27/20 05/27/20 05/27/20 05/27/20 05/27/20 05/27/20 05/27/20 05/27/20 05/27/20 05/27/20 CARMEL ELEMENTARY SCHOOL APPENDIX F: PROPOSED DRAINAGE MODEL (8 SUB-BASINS) INCLUDING DETENTION CALCULATIONS 05/27/20 05/27/20 TXref ..\Xref\Carmel _ G r o u n d Floor_2019-09-12.dwgSTOPSTOP DO NOTENTERSTOP 1234567891012345678910STOP STOPBUSONLYDETENTION: 7' CMP FL / INV 843.8 (FLAT: 0% SLOPE) (TOP OF PIPE 850.8) HW100= 850.7 DRIVE TO BE CONSTRUCTED BY OTHERSPROPOSED BMP & ACCESS EASEMENT P RO P O S E D A C C E S S E A S E M E N TXre f ..\Xref\Floo r P l a n - S I TEPL A N C E - E L E C T R I C A L 1 1 - 1 8 - 1 9 . d w g WALK TO BE CONSTRUCTED BY OTHERSN O PARKINGNO PARKI NGNO PARKINGH.Pt. 4TH A V E N U E Xref ..\Xref\Carmel _ G r o u n d Floor_2019-09-12.dwgSTOPSTOP DO NOTENTERSTOP 12 34567891012345678910 STOP STOPBUSONLYDETENTION: 7' CMP FL / INV 843.8 (FLAT: 0% SLOPE) (TOP OF PIPE 850.8) HW100= 850.7 DRIVE TO BE CONST R UCTED BY OTHE RSPROPOSED BMP & ACCESS EASEMENT P RO P O S E D A C C E S S E A S E M E N TXre f ..\Xref\Floo r P l a n - S I TEPL A N C E - E L E C T R I C A L 1 1 - 1 8 - 1 9 . d w g W ALK T O BE CONSTRUCTED BY OTHERS0.47 AC IMP 0.00 AC PERV 0.62 AC IMP 0.01 AC PERV 0.22 AC IMP 0.15 AC PERV 0.31 AC IMP 0.07 AC PERV 0.40 AC IMP 0.74 AC PERV 0.00 AC IMP 0.20 AC PERV 0.04 AC IMP 0.37 AC PERV 0.23 AC IMP 0.05 AC PERV 0.02 AC IMP 0.14 AC PERV 0.07 AC IMP 0.06 AC PERV 0.19 AC IMP 0.10 AC PERV 0.2 4 AC I MP0.01 AC PERV0.11 AC IMP 0.29 AC PERV 0.14 AC IMP 0.03 AC PERV 0.21 AC IMP 0.11 AC PERV 0.15 AC IMP 0.07 AC PERV 0.24 AC IMP 0.02 AC PERV 0.27 AC IMP 0.23 AC PERV 0.20 AC IMP 0.04 AC PERV0.17 AC IMP 0.07 AC P E RV 0.04 AC IMP 0.10 AC PERV 0.30 AC IMP 0.00 AC PERV 0.28 AC IMP 0.00 AC PERV 0.14 AC IMP 0.00 AC PERV 0.14 AC IMP 0.00 AC PERV 0.72 AC IMP 0.00 AC PERV 0.05 AC IMP 0.03 AC PERV 0.15 AC IMP 0.00 AC PERV 0.12 AC IMP 0.18 AC PERV 0.27 AC IMP 0.00 AC PERV 0.14 AC IMP 0.00 AC PERV 0.14 AC IMP 0.00 AC PERV 0.09 AC IMP 0.00 AC PERV 0.05 AC IMP 0.01 AC PERV0.18 AC IMP0.03 AC PERV0.12 AC IMP0.08 AC PERV0.02 AC IMP0.05 AC PERV0. 1 4 A C I MP0. 0 0 A C P ERV 0.0 4 A C IMP 0.0 0 A C PE RV 0.0 4 A C I MP0.0 5 A C PER V0.01 AC IMP 0.06 A C PE RV0.05 AC IMP 0.00 AC PE R V 0.02 AC IMP 0.00 AC PE RV 0. 0 4 A C I MP0. 0 0 A C P E RV 0.0 3 A C I MP 0.0 1 A C PE R V0.01 AC IMP 0.63 AC PERV 0.00 AC IMP 0.47 AC PERV 0.00 AC IMP0.49 AC PERV0.00 AC IMP0.23 AC PERV0.0 1 A C I MP0.0 4 A C PE RV0.02 AC IMP 0.14 AC PERV 0.33 AC IMP 0.66 AC PERV 0.21 AC IMP 0.09 AC PERV 0.18 AC IMP 0.18 AC PERV 0.09 AC IMP 0.02 AC P E R V 0.16 AC IMP 0.04 AC PERV 0.04 OFFSITE IMP 0.27 AC IMP 0.21 AC PERV 0.00 AC IMP 0.32 AC PERV 0.00 AC IMP 0.28 AC PERV SHEET No. SCALE: Date:PROJECT:TITLE: Job No.8365 Keystone Crossing, Suite 201Indianapolis, IN. 46240 (317) 202-0864PROPOSEDDRAINAGE AREAS P1 02-13-20 1"= 60' South node S to South East nodeE to EastSW to SW North collector node Piped North Detention Basin NW to NW to North - to Offsite Inlet to North - to Onsite Inlet to Detn to North - to Offsite Inlet to North - to 4th Ave STM 713 STM 773STM 780 STM 785 STM 784 S T M 7 8 1 STM 782STM775 STM 786STM 724 STM 714 STM 723 STM 715 STM 716 STM 726 STM 788 S TM 7 2 8 STM 718 STM 720STM 727STM 729 S T M 7 3 0 STM 753 STM 760 STM 747 STM 746 STM 744 STM 743 STM 783STM 778 S T M 7 5 7 STM 747 STM 759 STM 727 STM 728 STM 722 STM 749 STM 749 STM 758 STM 779STM 787STM 759 STM 749 STM 717 STM 716 EX INLET STM 724STM777 05/27/20 05/27/20 05/27/20 05/27/20 05/27/20 05/27/20 05/27/20 05/27/20 05/27/20 05/27/20 05/27/20 05/27/20 05/27/20 05/27/20 05/27/20 05/27/20 05/27/20 05/27/20 05/27/20 05/27/20 05/27/20 05/27/20 05/27/20 05/27/20 05/27/20 05/27/20 05/27/20 05/27/20 05/27/20 05/27/20 05/27/20 05/27/20 05/27/20 05/27/20 05/27/20 05/27/20 05/27/20 CARMEL ELEMENTARY SCHOOL APPENDIX G: WATER QUALITY CALCULATIONS 05/27/20 City of Indianapolis Stormwater Quality Unit (SQU) Selection Guide Pg. 1 10/01/2019 Version 14.0 (Check http://www.indy.gov/eGov/City/DPW/Business/Specs/Pages/UpdatedStormWaterManual.aspx for current Selection Guide) Performance Matrix for Manufactured SQUs that are approved for use as post-construction water quality units in the City of Indianapolis and in compliance with the Stormwater Design and Construction Specifications Manual PLEASE NOTE: All SQUs shall be configured as off-line units unless approved for on-line use. On-line units must document the peak 10-year flow (per the Stormwater Design and Construction Specification Manual) is less than the approved maximum10-yr flow rate. Rate Based SQUs - Table 1 Manufactured SQU SQU System Model Max Treatment Flow (cfs) Max 10-yr On-Line Flow Rate (cfs) Cleanout Depth (Inches) SC-3 0.39 N/A 9 SC-4 0.70 N/A 9 SC-5 1.09 N/A 9 SC-6 1.57 N/A 9 SC-7 2.14 N/A 9 SC-8 2.80 N/A 9 SC-9 3.54 N/A 9 SC-10 4.37 N/A 9 SC-11 5.29 N/A 9 SciClone1 SC-12 6.30 N/A 9 CDS-3 0.52 1.04 9 CDS-4 0.93 1.86 9 CDS-5 1.5 3.00 9 CDS-6 2.1 4.2 9 CDS-7 2.8 5.60 9 CDS-8 3.7 7.4 9 CDS-10 5.8 11.6 9 CDS Technologies1 CDS-12 8.4 16.8 9 DVS-36C 0.56 1.12 9 DVS-48C 1.00 2.00 9 DVS-60C 1.56 3.12 9 DVS-72C 2.25 4.50 9 DVS-84C 3.06 6.12 9 DVS-96C 4.00 8.00 9 DVS-120C 6.25 12.50 9 DVS1 DVS-144C 9.00 18.00 9 05/27/20 City of Indianapolis Stormwater Quality Unit (SQU) Selection Guide Pg. 2 10/01/2019 Version 14.0 Manufactured SQU SQU System Model Max Treatment Flow (cfs) Max 10-yr On-Line Flow Rate (cfs) Cleanout Depth (Inches) 4-ft 1.12 2.95 9 6-ft 2.52 6.63 12 8-ft 4.49 11.81 15 10-ft 7.00 18.40 18 Hydro International Downstream Defender1 12 ft 10.08 26.51 21 3-ft 0.85 1.84 9 4-ft 1.5 3.24 9 5-ft 2.35 5.08 9 6-ft 3.38 7.30 9 7-ft 4.60 9.94 9 Hydro International First Defense High Capacity1 8-ft 6.00 12.96 9 HS-3 0.50 1.00 6 HS-4 0.88 1.76 6 HS-5 1.37 2.74 6 HS-6 1.98 3.96 6 HS-7 2.69 5.38 6 HS-8 3.52 7.04 6 HS-9 4.45 8.9 6 HS-10 5.49 10.98 6 HS-11 6.65 13.3 6 HydroStorm by Hydroworks, LLC1 HS-12 7.91 15.82 6 XC-2 0.57 1.16 6 XC-3 1.13 2.30 6 XC-4 1.86 3.79 6 XC-5 2.30 4.68 6 XC-6 3.31 6.74 6 XC-7 4.50 9.16 6 XC-8 5.88 11.97 6 XC-9 7.44 15.14 6 XC-10 9.19 18.70 6 XC-11 11.12 22.63 6 AquaShield Aqua-Swirl Xcelerator1 XC-12 13.23 26.92 6 1 Installed in the configuration as reviewed by NJCAT only 05/27/20 05/27/20 05/27/20 05/27/20 05/27/20 05/27/20 05/27/20 05/27/20 05/27/20 05/27/20 05/27/20 05/27/20 05/27/20 05/27/20 05/27/20 05/27/20 CARMEL ELEMENTARY SCHOOL APPENDIX H: DETAILS OF XCELERATORS XC-5 & XC-6 & DETENTION POND 05/27/20 2733 Kanasita Drive, Suite 111, Chattanooga, TN 37343 Phone (888) 344-9044 Fax (423) 826-2112 www.aquashieldinc.com Structure #: Drawn By: Scale: Date: 6/26/2019 Rvwed Rvw. Date U.S. Patent No. 6524473 and other Patent Pending Aqua-Swirl XCelerator As Shown OFlores Aqua-Swirl Stormwater Treatment System Standard Detail XC-6 CCW STD XC-6 STD Aqua-Swirl Polymer Coated Steel (PCS) Stormwater Treatment System 12 in [305 mm] Manhole Frame & Cover DetailFor Non-Traffic Areas OnlyNTS 4 in [1219 mm] Min. Gravel Backfill Concrete Wrap Compressible Expansion Joint Material to a minimum 1/2-inch [13 mm] thickness around top of riser to allow transfer of inadvertent loading from manhole cover to concrete slab. Riser Soil Cover Frame 1/2 in [13 mm] 1/2 in [13 mm] Place small amount of concrete [3,000 psi [20 MPa] (min)] to support and level manhole frame. DO NOT allow manhole frame to rest upon riser. Backfill (90% Proctor Density) 8 in [203 mm] 4 1/2 in [114 mm] Unless other traffic barriers are present, bollards shall be placed around access riser(s) in non-traffic areas to prevent inadvertent loading by maintenance vehicles. Manhole Frame & Cover Detail For Traffic Loading Areas NTS Cover Frame 48 in[1219 mm] Min. Backfill (90% Proctor Density) 3,000 psi [20 MPa] (min) Concrete #4 [13 mm] Rebar @ 6 in [152 mm] Each Way 30 in [762 mm] Riser 1/2 in[13 mm] 4 1/2 in[114 mm] 14 in[356 mm] 1/2 in [13 mm] Thick Expansion Joint Material If traffic loading (HS-25) is required or anticipated, a 4-foot [1.22 m] diameter, 14-inch [356 mm] thick reinforced concrete pad must be placed over the Stormwater Treatment System Riser to support and level the manhole frame, as shown. The top of riser pipe must be wrapped with compressible expansion joint material to a minimum 1/2-inch [13 mm] thickness to allow transfer of wheel loads from manhole cover to concrete slab. Manhole cover shall bear on concrete slab and not on riser pipe. The concrete slab shall have a minimum strength of 3,000 psi [20 MPa] and be reinforced with #4 [13 mm] reinforcing steel as shown. Minimum cover over reinforcing steel shall be 1-inch [25 mm]. Top of manhole cover and concrete slab shall be level with finish grade. Please see accompanied Aqua-Swirl specification notes. See Site Plan for actual System orientation. Approximate dry (pick) weight: 3000 lbs [1400 kg]. Backfill shall extend at least 18 inches [457 mm] outward from Swirl Concentrator and for the full height of the Swirl Concentrator (including riser) extending laterally to undisturbed soils. (See MH Detail Below) Backfill Bedding Undisturbed soil 18 in [457 mm] 6 in [152 mm] 1 1 As an alternative, 42 in [1067 mm] diameter, HS-20/25 rated precast concrete rings may be substituted. 14 in [356 mm] thickness must be maintained. XC-6 inlet/outlet pipe size ranges up to 36 in [914 mm]. XC-6 chamber height may vary up to 128 in [3251 mm], depending on inlet/outlet pipe size. Orientation may vary from a minimum of 90° to a maximum of 180°. Clockwise or counterclockwise orientation as needed. 2 3 3 2 Plan View SCALE 1:40 84 in [2134 mm] 84 in [2134 mm] n36 in [914 mm] n36 in [914 mm] 2 Octagonal Base Plate Ø72 in [Ø1832 mm] Elevation View SCALE 1:40 74 in [188 mm] 128 in [3251 mm] [1067 mm] [940 mm] 5 MH Frame [127 mm] n30 in [762 mm] Band Coupler by Manufacturer. (as needed)Riser Manhole Frame and Cover by Manufacturer. (See Details) Rim elevations to match finish grade. Pipe coupling by Contractor. 12 in [305 mm] long Stub-out by Manufacturer. 4 4 el. Varies Inlet/Outlet Invert el. Varies el. Varies Grade (Rim) el. Varies Pipe coupling by Contractor. 12 in [305 mm] long Stub-out by Manufacturer. 180° n72 in [1829 mm] Projected View SCALE 1:70 Optional inlet orientations available (See note 4) 05/27/20 Plan View SCALE 1:40 Elevation View SCALE 1:40 Projected View SCALE 1:70 2733 Kanasita Drive, Suite 111, Chattanooga, TN 37343 Phone (888) 344-9044 Fax (423) 826-2112 www.aquashieldinc.com Structure #: Drawn By: Scale: Date: OFlores 6/26/2019 Rvwed Rvw. Date U.S. Patent No. 6524473 and other Patent Pending Aqua-Swirl XCelerator Aqua-Swirl Stormwater Treatment System Standard Detail As Shown el. Varies Inlet/Outlet Invert el. Varies el. Varies Grade (Rim) el. Varies XC-7 CCW STD XC-7 STD Aqua-Swirl Polymer Coated Steel (PCS) Stormwater Treatment System 12 in [305 mm] Manhole Frame & Cover Detail For Non-Traffic Areas Only NTS 4 in [1219 mm] Min. Gravel Backfill Concrete Wrap Compressible Expansion Joint Material to a minimum 1/2-inch [13 mm] thickness around top of riser to allow transfer of inadvertent loading from manhole cover to concrete slab. Riser Soil Cover Frame 1/2 in [13 mm] 1/2 in [13 mm] Place small amount of concrete [3,000 psi [20 MPa] (min)] to support and level manhole frame. DO NOT allow manhole frame to rest upon riser. Backfill (90% Proctor Density) 8 in [203 mm] 4 1/2 in [114 mm] Unless other traffic barriers are present, bollards shall be placed around access riser(s) in non-traffic areas to prevent inadvertent loading by maintenance vehicles. Manhole Frame & Cover Detail For Traffic Loading Areas NTS Cover Frame 48 in [1219 mm] Min. Backfill (90% Proctor Density) 3,000 psi [20 MPa] (min) Concrete #4 [13 mm] Rebar @ 6 in [152 mm] Each Way 30 in [762 mm] Riser 1/2 in [13 mm] 4 1/2 in [114 mm] 14 in [356 mm] 1/2 in [13 mm] Thick Expansion Joint Material If traffic loading (HS-25) is required or anticipated, a 4-foot [1.22 m] diameter, 14-inch [356 mm] thick reinforced concrete pad must be placed over the Stormwater Treatment System Riser to support and level the manhole frame, as shown. The top of riser pipe must be wrapped with compressible expansion joint material to a minimum 1/2-inch [13 mm] thickness to allow transfer of wheel loads from manhole cover to concrete slab. Manhole cover shall bear on concrete slab and not on riser pipe. The concrete slab shall have a minimum strength of 3,000 psi [20 MPa] and be reinforced with #4 [13 mm] reinforcing steel as shown. Minimum cover over reinforcing steel shall be 1-inch [25 mm]. Top of manhole cover and concrete slab shall be level with finish grade. Please see accompanied Aqua-Swirl specification notes. See Site Plan for actual System orientation. Approximate dry (pick) weight: 3800 lbs [1700 kg]. Backfill shall extend at least 18 inches [457 mm] outward from Swirl Concentrator and for the full height of the Swirl Concentrator (including riser) extending laterally to undisturbed soils. (See MH Detail Below) Backfill Bedding Undisturbed soil 18 in [457 mm] 6 in [152 mm] 1 1 As an alternative, 42 in [1067 mm] diameter, HS-20/25 rated precast concrete rings may be substituted. 14 in [356 mm] thickness must be maintained. XC-7 inlet/outlet pipe size ranges up to 42 in [1067 mm]. XC-7 chamber height may vary up to 151 in [3835 mm], depending on inlet/outlet pipe size. Orientation may vary from a minimum of 90ƒ to a maximum of 180ƒ. Clockwise or counterclockwise orientation as needed. 2 3 3 2 96 in [2438 mm] 96 in [2438 mm] P42 in [P1067 mm] P42 in [P1067 mm] 2 Octagonal Base Plate P84 in [P2137 mm] 85 in [2159 mm] 151 in [3835 mm] Varies Varies 5 [127 mm] MH Frame P30 in [P762 mm] Band Coupler by Manufacturer. (as needed)Riser Manhole Frame and Cover by Manufacturer. (See Details) Rim elevations to match finish grade. Pipe coupling by Contractor. 12 in [305 mm] long Stub-out by Manufacturer. 4 4 Pipe coupling by Contractor. 12 in [305 mm] long Stub-out by Manufacturer. 180ƒP84 in [P2134 mm] Optional inlet orientations available (See note 4) 05/27/20 ACCESS HATCH ACCESS HATCH ACCESS HATCH 18" 18" 843.80 843.80 843.80 844.20 843.80 05/27/20 1.75" CCTYPCOIL WIDTH OPEN AREA = 3.33 SQ IN/SQ FT 2.711" 9@2.711" = 24.399" EDGE SPACING EQUAL ON BOTH SIDES NOTES: 1. PERFORATIONS MEET AASHTO AND ASTM SPECIFICATIONS. 2. PERFORATION OPEN AREA PER SQUARE FOOT OF PIPE IS BASED ON THE NOMINAL DIAMETER AND LENGTH OF PIPE. 3. DIMENSIONS SUBJECT TO MANUFACTURER'S TOLERANCES. 4. ALL HOLES 3/8"Ø. EXFILTRATION AREA STANDARD PERFORATION PATTERNS APPROXIMATE AREA PER LINEAR FOOT OF PIPE PIPE CORRUGATION PATTERN 2 2/3" x 1/2" 3" x 1" 5" x 1" ULTRA FLO 84"Ø 85.5 SQ. IN. 90.3 SQ. IN. 87.9 SQ. IN. NOTES: · GAGE AND COATING LIMITATIONS APPLY. 5" x 1" IS NOT AVAILABLE IN ALUMINUM. · DIMENSIONS SUBJECT TO MANUFACTURER'S TOLERANCES. TYPICAL PERFORATION DETAIL NOT TO SCALE TYPICAL SECTION VIEW NOT TO SCALE NOTE: IF SALTING AGENTS FOR SNOW AND ICE REMOVAL ARE USED ON OR NEAR THE PROJECT, A GEOMEMBRANE BARRIER IS RECOMMENDED WITH THE SYSTEM. THE GEOMEMBRANE LINER IS INTENDED TO HELP PROTECT THE SYSTEM FROM THE POTENTIAL ADVERSE EFFECTS THAT MAY RESULT FROM A CHANGE IN THE SURROUNDING ENVIRONMENT OVER A PERIOD OF TIME. PLEASE REFER TO THE CORRUGATED METAL PIPE DETENTION DESIGN GUIDE FOR ADDITIONAL INFORMATION. 84" TYP. 36" TYP.27" SEE TYPICAL BACKFILL DETAIL NOTES LIMITS OF REQUIRED BACKFILL 20 MIL PE IMPERMEABLE LINER OVER TOP OF PIPE (IF REQUIRED) 1 MINIMUM TRENCH WIDTH MUST ALLOW ROOM FOR PROPER COMPACTION OF HAUNCH MATERIALS UNDER THE PIPE. THE TRENCH WIDTH IS THE MINIMUM AMOUNT REQUIRED FOR PROPER INSTALLATION AND TO SUPPORT HORIZONTAL PRESSURE FROM THE PIPE. THE MANUFACTURER'S SUGGESTED MINIMUM VALUE IS: 1.5D + 12". 1a MINIMUM EMBANKMENT WIDTH (IN FEET) FOR INITIAL FILL ENVELOPE: 3.0D BUT NO LESS THAN D + 4'0". 2 FOUNDATION SHALL BE WELL CONSOLIDATED & STABLE, CAPABLE OF SUPPORTING FILL MATERIAL LOAD. 3 OPEN-GRADED GRANULAR BEDDING MATERIAL SHALL BE A RELATIVELY LOOSE MATERIAL THAT IS ROUGHLY SHAPED TO FIT THE BOTTOM OF THE PIPE, 4" TO 6" IN DEPTH. SUGGESTED PARTICLE SIZE OF 1/2 CORRUGATION DEPTH. 4 CORRUGATED STEEL PIPE (CSP / HEL-COR). 5 HAUNCH ZONE MATERIAL SHALL BE HAND SHOVELED OR SHOVEL SLICED INTO PLACE TO ALLOW FOR PROPER COMPACTION. 5a THE BACKFILL MATERIAL SHALL BE A FREE-DRAINING, ANGULAR, WASHED-STONE PER AASHTO M 43 SIZE #3 WITH A ½” - 2” PARTICLE SIZE OR APPROVED EQUAL. MATERIAL SHALL BE PLACED IN 12" MAXIMUM LIFTS AND SHALL BE WORKED INTO THE PIPE HAUNCHES BY MEANS OF SHOVEL-SLICING, RODDING, AIR-TAMPER, VIBRATORY PLATE OR OTHER EFFECTIVE METHODS. COMPACTION IS CONSIDERED ADEQUATE WHEN A DENSITY EQUIVALENT TO 90% STANDARD PROCTOR IS ACHIEVED OR WHEN NO FURTHER YIELDING OF THE MATERIAL IS OBSERVED UNDER THE COMPACTOR OR UNDER FOOT. THE PROJECT ENGINEER OR HIS REPRESENTATIVE MUST BE SATISFIED WITH THE LEVEL OF COMPACTION. INADEQUATE COMPACTION CAN LEAD TO EXCESSIVE PIPE DEFLECTIONS AND SETTLEMENT OF THE SOILS OVER THE SYSTEM. BACKFILL SHALL BE PLACED SUCH THAT THERE IS NO MORE THAN A TWO-LIFT DIFFERENTIAL BETWEEN THE SIDES OF ANY PIPE IN THE SYSTEM AT ALL TIMES DURING THE BACKFILL PROCESS. BACKFILL SHALL BE ADVANCED ALONG THE LENGTH OF THE SYSTEM AT THE SAME RATE TO AVOID DIFFERENTIAL LOADING ON ANY PIPES IN THE SYSTEM. 6 INITIAL OPEN GRADED GRANULAR BACKFILL ABOVE PIPE MAY INCLUDE ROAD BASE MATERIAL (AND RIGID PAVEMENT IF APPLICABLE). SEE TABLE ABOVE. 6a TOTAL HEIGHT OF COMPACTED COVER FOR CONVENTIONAL HIGHWAY LOADS IS MEASURED FROM TOP OF PIPE TO BOTTOM OF FLEXIBLE PAVEMENT OR TOP OF RIGID PAVEMENT. 7 FINAL BACKFILL MATERIAL SELECTION AND COMPACTION REQUIREMENTS SHALL FOLLOW THE PROJECT PLANS AND SPECIFICATIONS PER THE ENGINEER OF RECORD. NOTES: · GEOTEXTILE SHOULD BE USED TO PREVENT SOIL MIGRATION INTO VARYING SOIL TYPES (PROJECT ENGINEER). · FOR MULTIPLE BARREL INSTALLATIONS THE RECOMMENDED STANDARD SPACING BETWEEN PARALLEL PIPE RUNS SHALL BE PIPE DIA. / 2 BUT NO LESS THAN 12", OR 36" FOR PIPE DIAMETERS 72" AND LARGER. · CONTACT YOUR CONTECH REPRESENTATIVE FOR NONSTANDARD SPACING (TABLE C12.6.7-1). FINAL BACKFILL GRANULAR BACKFILL DIAMETER (D)IN SITU DIAMETER MIN. COVER CORR. PROFILE 6"-10" 12" 1 1/2" x 1/4" 12"-48" 12" 2 2/3" x 1/2" 54"-96" 12" 3" x 1", 5" x 1" 102"-144" 18" 3" x 1", 5" x 1" LIMITS OF DRAIN ROCK MAY BE PLACED BELOW PIPE AS DEFINED BY ENGINEER OF RECORD. FOUNDATION SPEC STILL APPLIES AND BEDDING WILL BE THE FIRST 4" TO 6" BELOW INVERT 4 TYPICAL BACKFILL DETAIL NOT TO SCALE EMBANKMENT CONDITIONTRENCH CONDITION 6 6a BEDDING FOUNDATIONPIPE EMBEDMENT5a 7 5 3 2 INITIAL FILL ENVELOPE 1 1a 7037 Ridge Road, Hanover, MD 21076 866-740-3318 410-796-5505 866-376-8511 FAX MAK CHECKED: DRAWN: MAK DESIGNED: APPROVED:I:\MERLIN\PROJECT\ACTIVE\631000\631048\631048-10-CMP DETENTION\DRAWINGS\631048-010-CMP CONFAB.DWG 11/13/2019 11:34 AMSHEET NO.: OF P2 DATE:PROJECT No.: 631048 SEQ. No.: 010 PROPOSAL CONTECH DRAWING 84"Ø UNDERGROUND DETENTION SYSTEM - 631048-010 CARMEL ELEMETARY INDIANAPOLIS, IN SITE DESIGNATION: The design and information shown on this drawing is provided as a service to the project owner, engineer and contractor by Contech Engineered Solutions LLC ("Contech"). Neither this drawing, nor any part thereof, may be used, reproduced or modified in any manner without the prior written consent of Contech. Failure to comply is done at the user's own risk and Contech expressly disclaims any liability or responsibility for such use. If discrepancies between the supplied information upon which the drawing is based and actual field conditions are encountered as site work progresses, these discrepancies must be reported to Contech immediately for re-evaluation of the design. Contech accepts no liability for designs based on missing, incomplete or inaccurate information supplied by others. www.ContechES.com 4REVISION DESCRIPTIONDATE MARK BY PIPE Ø2'-6" PIPE Ø 2'-6"PIPE ØFRONT TYPICAL MANWAY DETAIL NOT TO SCALE1'-0" MIN.48"Ø to 90"Ø FITTING REINFORCEMENT MAY BE REQUIRED BASED ON HEIGHT OF COVER AND LIVE LOAD CONDITION PLAN 11/13/19 05/27/20 FLAT GASKET FLAT GASKET HUGGER BAND CONNECTION DETAIL (SBBS) 2 2/3"x1/2" RE-ROLLED END HEL-COR PIPE H-12 HUGGER BAND DETAIL NOT TO SCALE GENERAL NOTES: 1. JOINT IS TO BE ASSEMBLED PER AASHTO BRIDGE CONSTRUCTION SPECIFICATION SEC 26.4.2.4. 2. BAND MATERIALS AND/OR COATING CAN VARY BY LOCATION. CONTACT YOUR CONTECH REPRESENTATIVE FOR AVAILABILITY. 3. BANDS ARE SHAPED TO MATCH THE PIPE-ARCH WHEN APPLICABLE. 4. BANDS ARE NORMALLY FURNISHED AS FOLLOWS: · 12" THRU 48" 1-PIECE · 54" THRU 96" 2-PIECES · 102" THRU 144" 3-PIECES 5. BAND FASTENERS ARE ATTACHED WITH SPOT WELDS, RIVETS OR HAND WELDS. 6. ALL CMP IS REROLLED TO HAVE ANNULAR END CORRUGATIONS OF 2 2/3"x1/2" 7. DIMENSIONS ARE SUBJECT TO MANUFACTURING TOLERANCES. 8. ORDER SHALL DESIGNATE GASKET OPTION, IF REQUIRED (SEE DETAILS ABOVE). SINGLE BAR, BOLT AND STRAP (SBBS) 12 1/8" 10 1/4"12" TECHCO BAND ANGLES 1/2" DIA. BOLT 12" RISER BAND DETAIL NOT TO SCALE PLAIN END CMP RISER PIPE CONNECTION DETAIL 7 1/2" TECHCO SHOWN - MAY VARY STUB HEIGHT2'-0" RECOMMENDED12" MIN.MAINLINE PIPE RISER EXTENSION FLAT BAND SHOWN, MAY VARY (NO GASKET) GENERAL NOTES: 1. DELIVERED BAND STYLE AND FASTENER TYPE MAY VARY BY FABRICATION PLANT. 2. JOINT IS TO BE ASSEMBLED PER AASHTO BRIDGE CONSTRUCTION SPECIFICATION SEC 26.4.2.4. 3. BAND MATERIAL AND GAGE TO BE SAME AS RISER MATERIAL. 4. IF RISER HAS A HEIGHT OF COVER OF 10' OR MORE, USE A SLIP JOINT. 5. BANDS ARE NORMALLY FURNISHED AS FOLLOWS: · 12" THRU 48" 1-PIECE · 54" 2-PIECES 6. ALL RISER JOINT COMPONENTS WILL BE FIELD ASSEMBLED. 7. MANHOLE RISERS IN APPLICATIONS WHERE TRAFFIC LOADS ARE IMPOSED REQUIRE SPECIAL DESIGN CONSIDERATIONS. 8. DIMENSIONS SUBJECT TO MANUFACTURING TOLERANCES. ELEVATION VIEW OF CMP AND RISER 7037 Ridge Road, Hanover, MD 21076 866-740-3318 410-796-5505 866-376-8511 FAX MAK CHECKED: DRAWN: MAK DESIGNED: APPROVED:I:\MERLIN\PROJECT\ACTIVE\631000\631048\631048-10-CMP DETENTION\DRAWINGS\631048-010-CMP CONFAB.DWG 11/13/2019 11:34 AMSHEET NO.: OF P3 DATE:PROJECT No.: 631048 SEQ. No.: 010 PROPOSAL CONTECH DRAWING 84"Ø UNDERGROUND DETENTION SYSTEM - 631048-010 CARMEL ELEMETARY INDIANAPOLIS, IN SITE DESIGNATION: The design and information shown on this drawing is provided as a service to the project owner, engineer and contractor by Contech Engineered Solutions LLC ("Contech"). Neither this drawing, nor any part thereof, may be used, reproduced or modified in any manner without the prior written consent of Contech. Failure to comply is done at the user's own risk and Contech expressly disclaims any liability or responsibility for such use. If discrepancies between the supplied information upon which the drawing is based and actual field conditions are encountered as site work progresses, these discrepancies must be reported to Contech immediately for re-evaluation of the design. Contech accepts no liability for designs based on missing, incomplete or inaccurate information supplied by others. www.ContechES.com 4REVISION DESCRIPTIONDATE MARK BY 11/13/19 05/27/20 MANHOLE CAP DETAIL NOT TO SCALE8"11" TYP.2" COVERTYP.1" GAP (TYP. ALLSIDES)NOTES: 1. DESIGN IN ACCORDANCE WITH AASHTO, 17th EDITION AND ACI 350. 2. DESIGN LOAD HS25. 3. EARTH COVER = 1' MAX. 4. CONCRETE STRENGTH = 4,000 psi 5. REINFORCING STEEL = ASTM A615, GRADE 60. 6. PROVIDE ADDITIONAL REINFORCING AROUND OPENINGS EQUAL TO THE BARS INTERRUPTED, HALF EACH SIDE. ADDITIONAL BARS TO BE IN THE SAME PLANE. A A2" COVER (TYP) SECTION VIEW ROUND OPTION PLAN VIEW SQUARE OPTION PLAN VIEW Ø CMP RISER INTERRUPTED BAR REPLACEMENT, SEE NOTE 6. STANDARD REINFORCING, SEE TABLE OPENING IN PROTECTION SLAB FOR ACESS #4 DIAGONAL TRIM BAR (TYP. 4 PLACES), SEE NOTE 7. A INTERRUPTED BAR REPLACEMENT, SEE NOTE 6. B OPENING IN PROTECTION SLAB FOR ACCESS #4 DIAGONAL TRIM BAR (TYP. 4 PLACES), SEE NOTE 7. STANDARD REINFORCING, SEE TABLE GASKET MATERIAL SUFFICIENT TO PREVENT SLAB FROM BEARING ON RISER TO BE PROVIDED BY CONTRACTOR. 2 " COVER(TYP. ) ØB REINFORCING TABLE Ø CMP RISER A B Ø REINFORCING **BEARING PRESSURE (PSF) 24"4'Ø 4'x4'26"#5 @ 10" OCEW #5 @ 10" OCEW 2,540 1,900 30"4'-6"Ø 4'-6" x 4'-6"32"#5 @ 10" OCEW #5 @ 9" OCEW 2,260 1,670 36"5'Ø 5' x 5'38"#5 @ 9" OCEW #5 @ 8" OCEW 2,060 1,500 42"5'-6"Ø 5'-6" x 5'-6"44"#5 @ 8" OCEW #5 @ 8" OCEW 1,490 1,370 48"6'Ø 6' x 6'50"#5 @ 7" OCEW #5 @ 7" OCEW 1,210 1,270 ** ASSUMED SOIL BEARING CAPACITY1'-0"A 2" COV E R (TYP.)2" C O V E R (T YP )7. TRIM OPENING WITH DIAGONAL #4 BARS, EXTEND BARS A MINIMUM OF 12" BEYOND OPENING, BEND BARS AS REQUIRED TO MAINTAIN BAR COVER. 8. PROTECTION SLAB AND ALL MATERIALS TO BE PROVIDED AND INSTALLED BY CONTRACTOR. 9. DETAIL DESIGN BY DELTA ENGINEERS, ARCHITECTS AND LAND SURVEYORS, ENDWELL, NY. ØB 36"Ø MAX., HS-25 ACCESS CASTING WITH GRADE RINGS AS REQUIRED, TO BE PROVIDED AND INSTALLED BY CONTRACTOR. MAY BE TOP MOUNTED (AS SHOWN) OR RECESSED.CMP PROTECTION SLAB VARIES RIM/FINISHED GRADE ACCESS CASTING NOT SUPPLIED BY CONTECH 7037 Ridge Road, Hanover, MD 21076 866-740-3318 410-796-5505 866-376-8511 FAX MAK CHECKED: DRAWN: MAK DESIGNED: APPROVED:I:\MERLIN\PROJECT\ACTIVE\631000\631048\631048-10-CMP DETENTION\DRAWINGS\631048-010-CMP CONFAB.DWG 11/13/2019 11:34 AMSHEET NO.: OF P4 DATE:PROJECT No.: 631048 SEQ. No.: 010 PROPOSAL CONTECH DRAWING 84"Ø UNDERGROUND DETENTION SYSTEM - 631048-010 CARMEL ELEMETARY INDIANAPOLIS, IN SITE DESIGNATION: The design and information shown on this drawing is provided as a service to the project owner, engineer and contractor by Contech Engineered Solutions LLC ("Contech"). Neither this drawing, nor any part thereof, may be used, reproduced or modified in any manner without the prior written consent of Contech. Failure to comply is done at the user's own risk and Contech expressly disclaims any liability or responsibility for such use. If discrepancies between the supplied information upon which the drawing is based and actual field conditions are encountered as site work progresses, these discrepancies must be reported to Contech immediately for re-evaluation of the design. Contech accepts no liability for designs based on missing, incomplete or inaccurate information supplied by others. www.ContechES.com CONSTRUCTION LOADS FOR TEMPORARY CONSTRUCTION VEHICLE LOADS, AN EXTRA AMOUNT OF COMPACTED COVER MAY BE REQUIRED OVER THE TOP OF THE PIPE. THE HEIGHT-OF-COVER SHALL MEET THE MINIMUM REQUIREMENTS SHOWN IN THE TABLE BELOW. THE USE OF HEAVY CONSTRUCTION EQUIPMENT NECESSITATES GREATER PROTECTION FOR THE PIPE THAN FINISHED GRADE COVER MINIMUMS FOR NORMAL HIGHWAY TRAFFIC. PIPE SPAN, INCHES 18-50 MINIMUM COVER (FT) AXLE LOADS (kips) 50-75 75-110 110-150 12-42 2.0 2.5 3.0 3.0 4.03.5 3.0 48-72 3.0 3.078-120 3.5 4.0 4.0 4.54.5 4.0 126-144 3.5 *MINIMUM COVER MAY VARY, DEPENDING ON LOCAL CONDITIONS. THE CONTRACTOR MUST PROVIDE THE ADDITIONAL COVER REQUIRED TO AVOID DAMAGE TO THE PIPE. MINIMUM COVER IS MEASURED FROM THE TOP OF THE PIPE TO THE TOP OF THE MAINTAINED CONSTRUCTION ROADWAY SURFACE. HEIGHT OF COVER TEMPORARY COVER FOR CONSTRUCTION LOADS FINISHED GRADE CONSTRUCTION LOADING DIAGRAM NOT TO SCALE SCOPE THIS SPECIFICATION COVERS THE MANUFACTURE AND INSTALLATION OF THE CORRUGATED STEEL PIPE (CSP) DETAILED IN THE PROJECT PLANS. MATERIAL THE ALUMINIZED TYPE 2 STEEL COILS SHALL CONFORM TO THE APPLICABLE REQUIREMENTS OF AASHTO M274 OR ASTM A929. PIPE THE CSP SHALL BE MANUFACTURED IN ACCORDANCE WITH THE APPLICABLE REQUIREMENTS OF AASHTO M36 OR ASTM A760. THE PIPE SIZES, GAGES AND CORRUGATIONS SHALL BE AS SHOWN ON THE PROJECT PLANS. ALL FABRICATION OF THE PRODUCT SHALL OCCUR WITHIN THE UNITED STATES. HANDLING AND ASSEMBLY SHALL BE IN ACCORDANCE WITH RECOMMENDATIONS OF THE NATIONAL CORRUGATED STEEL PIPE ASSOCIATION (NCSPA) INSTALLATION SHALL BE IN ACCORDANCE WITH AASHTO STANDARD SPECIFICATIONS FOR HIGHWAY BRIDGES, SECTION 26, DIVISION II OR ASTM A798 AND IN CONFORMANCE WITH THE PROJECT PLANS AND SPECIFICATIONS. IF THERE ARE ANY INCONSISTENCIES OR CONFLICTS THE CONTRACTOR SHOULD DISCUSS AND RESOLVE WITH THE SITE ENGINEER. IT IS ALWAYS THE RESPONSIBILITY OF THE CONTRACTOR TO FOLLOW OSHA GUIDELINES FOR SAFE PRACTICES. SPECIFICATION FOR CORRUGATED STEEL PIPE-ALUMINIZED TYPE 2 STEEL MATERIAL SPECIFICATION NOT TO SCALE 4REVISION DESCRIPTIONDATE MARK BY 11/13/19 05/27/20 CARMEL ELEMENTARY SCHOOL APPENDIX I: EXHIBIT: 100-YEAR PONDING LIMITS 05/27/20 OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHUOHU OHU OHU OHU OHU OHU OHUOHUOHUOHUOHU OHUOHUOHUOHU OHU OHU OHU OHUOHU OHU OHU OHU OHU OHUOHU OHU OHU OHU OHU OHUOHU OHU OHUOHUOHU OHU OHU OHU OHU OHUOHUOHUOHU OHUOHUOHU OHU OHU OHUOHUOHUEEEEEEE EEE E E E E4TH AVENUEXref .\Xref\Carmel_Ground Floor_2019-09-12.dwgSTOPSTOPD O NO T EN T ERSTOP STOPSTOPBUSONLYDETENTION: 7' CMPFL / INV 843.8 (FLAT: 0% SLOPE)(TOP OF PIPE 850.8)HW100= 850.7DRIVE TO BE CONSTRUCTED BY OTHERSPROPOSED BMP & ACCESS EASEMENTPRO P OSED ACCESS EASEMENTUNDERGROUND DETENTIONXref .\Xref\FloorPlan-SITEPLANCE-ELECTRICAL 11-18-19.dwg WALK TO BE CONSTRUCTED BY OTHERSFFE = 855.80Xref .\Xref\Carmel_Ground Floor_2019-09-12.dwgSTOP STOPD O NO T EN T ERSTOP STOPSTOPBUSONLYDETENTION: 7' CMPFL / INV 843.8 (FLAT: 0% SLOPE)(TOP OF PIPE 850.8)HW100= 850.7DRI VE TO BE CONSTRUCTED BY OTHERSPROPOSED BMP & ACCESS EASEMENTPRO P OSED ACCESS EASEMENTUNDERGROUND DETENTIONXref .\Xref\FloorPlan-SITEPLANCE-ELECTRICAL 11-18-19.dwg WALK TO BE CONSTRUCTED BY OTH ERS730 RIM=855.10 726 RIM=855.10 788 RIM=855.10 717 RIM=853.00 758 RIM=855.00 742 RIM=854.50 772 RIM=854.00 722 RIM=854.80 712 RIM=856.00 752 RIM=854.70 759 RIM=854.50 729 RIM=854.30 779 RIM=854.10 725 RIM=854.75 721 RIM=854.10 728 RIM=854.00 727 RIM=854.00 751 RIM=853.20 719 RIM=854.20 762 RIM=854.80 724 RIM=853.00 723 RIM=853.50 716 RIM=853.00 748 RIM=854.20 753 RIM=853.10 750 RIM=852.70 715 RIM=851.50 720 RIM=852.90 718 RIM=852.90 776 RIM=852.55 749 RIM=852.50 778 RIM=852.40 786 RIM=852.50 745 RIM=852.25 747 RIM=851.75 760 RIM=852.25 746 RIM=852.20 744 RIM=852.00 777 RIM=851.90 761 RIM=851.80 714 RIM=851.50 757 RIM=851.30 756 RIM=851.30 713 RIM=851.60 743 RIM=851.50 780 RIM=851.00 787 RIM=851.50 783 RIM=851.50 782 RIM=851.00 775 RIM=851.00 773 RIM=851.00 781 RIM=851.00 785 RIM=851.00 784 RIM=851.00 731 RIM=855.90 735 RIM=854.60 736 RIM=854.00 DETENTION: 7' CMPFL / INV 843.8 (FLAT: 0% SLOPE)(TOP OF PIPE 850.8)HW 10-YR= 847.32 HW 100-YR= 850.596''SSD 6''SSD6''SSD 6''SSD6''SSD6''SSD 6''SSD6''SSD6''SSD 6''SSD6''SSD6''SSD6''SSD6''S S D6''SSD6''SSD6''SSD 6''SSD6''SSD6 ''S S D 6' 'SSD 6''SSD 6''SSD6''SSD 6''SSD6''SSD 6''SSD6''SSD6''SSD6''SSD6''SSD 6''SSD6''SSD6''SSD6''SSD 6''SSD 6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD6''SSDRD RD RD RD RDRD RD RD RDRDRDRDRDRD RD RD RD RD RD RD RD RD RD RD RD RD RDRDRD RD RD RD RDPROPOSED BMP & ACCESS EASEMENTPRO P OSED ACCESS EASEMENT N O P A R K I N G NO PA R K ING NO PARKING A RIM=854.50 B RIM=852.85 D RIM=854.28 E RIM=852.94 F RIM=854.44 C RIM=853.13 6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD 6''SSD 6''SSD6''SSD6''SSD6''SSDH.Pt.6''SSD 6''SSD 6''SSD6''SSD6''SSD 6''SSD771 RIM=854.10 770 RIM=854.20 734 RIM=854.50 732 RIM=854.85 733 RIM=854.72 711 RIM=856.10 710 RIM=856.20 6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD 6 ''SSD 6''SSD6''SSD6''SSD6''SSD 6''SSD 6''SSD 6''SSD 6''SSD 6''SSD 6''SSD 6''SSD 6''SSD 6''SSD 6''SSD 6''SSD6''SSD6''SSD 6''SSD 6''SSD 6''SSD 6''SSD 791 RIM=854.54 792 RIM=854.50 854854854 854 854 855 854 853854 854855857855852 852854853852854853 FRFR FRFRFRFRFRFR FRFRFRFRFRFRFRFRFRFR FR FRFRFRFRFRFRFRFRFRFRFRFRFRFRFRFRFRFRFRFRFRFRFRFRFRFRFRFRFRFR FRFRFRFRFRFRFRFRFRFRFRFRFRFR FRFRFRFRFRFRFRFRFRFRFRFRFRFRFR FRFRFRFRFR FRFRFRFRFRFRFRFRFRFRFRFRFRFR FRFRFRFRFRFRFR FR FRFRFRFRFRFRFRFRFR FR FRFRFRFRFRFRFRFRFR FR FR FRFRFRFRFRFRFRFRFRFRFRFRFRFRFRFRFRFRFRFRFRFRFR FRFRFR FR F R FR F R 852853 853853854 854854853853853 85385385485485 4 85 3853 8 5 4 85 3 853 854 853 853854 85 4 853 85385385485 3 853853 85 4 854 85485485585585 5 8 5 5 8 5 5 85485 4 854853853854 854854853853853853 8 5 2 8528528528528528 5 2852 852 8 5 2 852 85 2 85285285 2 85 2 852853 85385485 4 853 854 853 854858857856 853854855853854 853 855 852 853 854 855 85 3 8 5 3 855 856 85785685585585685 7 855854 853852852 852 854 852854854 8 5 4 8558538538 5 4 8 5 7 8 5 6 8 5 7 8 5 6855 855855855 8558 55856856 854855 855854 8 5 4 854 855 854855 8 54 8528538548528538 5 4 Project Number: Drawing Number: Certified By: Checked ByDrawn ByIssue Date Revisions:PROJECT:Scope Drawings:CARMEL, INDIANAFORCARMEL CLAY SCHOOLSNEW ELEMENTARY SCHOOLSDrawing Title: 11-19-19 SO MK 18094 Rev. #Revision Description Issue Date CONFORMEDSETSCALE: 1" = 40' GRADING PLAN (100-YEAR INUNDATION WITH DESIGN SYSTEM BLOCKED) C303100-YEAR INUNDATION LIMITS ALL PROPOSED STORM SEWERS ARE PRIVATE SEWERS. SEWER OWNERSHIP 1 TAC COMMENTS 01/03/2019 3 ASI 001 02/14/2020 3 3 05/27/20 CARMEL ELEMENTARY SCHOOL APPENDIX J: DETENTION VOLUME CALCULATION INCLUDING 10% EXTRA VOLUME FOR SEDIMENT 05/27/20 Detention volume calculator CMP pipe by Mark Kilgore, P.E. Diameter of pipe = 7 ft Area of pipe full = 38.48 sf Number of pipes = 95.5 pipes Effective pipe L = 19.53 ft volume of 1 pipe = 751.60 ft^3 volume all pipes = 71,778 ft^3 rock space vol = 1.328 factor estimate based on calcs surface area rock = 19,930 ft^2 rock layer under = 0.5 ft rock layer over = 0.5 ft void space ratio = 0.4 pipe cumulative with filled pipes pipe rock (ft) (ft) (sf) % (ft^3) (ft^3) (ft^3) depth elev area full full vol volume volume 0 843.80 0 0 71,778 0 0 1 844.80 3.37 0.0876 71,778 6,285 8,347 2 845.80 9.07 0.2357 71,778 16,917 22,465 3 846.80 15.75 0.4093 71,778 29,376 39,011 4 847.80 22.73 0.5906 71,778 42,394 56,299 5 848.80 29.41 0.7642 71,778 54,853 72,845 6 849.80 35.11 0.9123 71,778 65,484 86,963 7 850.80 38.48 1 71,778 71,778 95,321 7.5 851.30 38.48 1 71,778 71,778 99,307 volume under pipes = 9,965 ft^3 void space vol under pipes = 3,986 ft^3 volume over pipes = 9,965 ft^3 void space vol over pipes = 3,986 ft^3 Total vol provided= 107,279 cf (void space under & over pipes + vol) 100-yr vol used = 92,967 cf 10% extra vol req'd= 9,297 cf Total volume req'd= 102,264 cf = less than total volume provided Therefore the basin does have the extra 10% volume required. 05/27/20