HomeMy WebLinkAboutC103 - DEMO PLAN (SOUTH)P1
1. EROSION CONTROL SHALL BE IN PLACE PRIOR TO ANY SOIL DISTURBANCE, INCLUDING PAVEMENT
REMOVAL.
2. THE CONTRACTOR SHALL VERIFY THE LOCATION OF UNDERGROUND UTILITIES TO BE REMOVED,
RELOCATED OR ABANDONED PRIOR TO COMMENCING DEMOLITION ACTIVITIES.
3. THE CONTRACTOR SHALL COORDINATE WORK ASSOCIATED WITH THE REMOVAL, RELOCATION OR
ABANDONMENT OF UTILITIES WITH THE UTILITY COMPANY OR ENTITY HAVING OWNERSHIP OF EACH
RESPECTIVE UTILITY. COSTS FOR DISCONNECTION, REMOVAL, AND/OR RELOCATION OF EXISTING
UTILITIES AS SHOWN ON THE DRAWINGS OR AS NECESSARY TO ALLOW FOR EXECUTION OF THE WORK
SHALL BE PAID BY THE CONTRACTOR.
4. NO OPEN BURNING SHALL BE PERMITTED ON THE SITE.
5. THE OWNER HAS FIRST SALVAGE RIGHTS ON ALL ITEMS REMOVED. IF OWNER FORFEITS RIGHTS, ALL
DEMOLISHED MATERIALS SHALL BECOME THE PROPERTY OF THE CONTRACTOR AND SHALL BE LEGALLY
DISPOSED OF OFF-SITE UNLESS OTHERWISE SHOWN.
6. UNLESS SCHEDULED FOR PROTECTION ON THE DRAWINGS, ALL TREES AND VEGETATION SHALL BE
REMOVED. PROTECTIVE MEASURES SHALL INCLUDE INSTALLATION AND MAINTENANCE OF TREE
PROTECTION FENCING TO BE LOCATED WHERE SHOWN AND AT THE DRIPLINE OF ALL TREES LOCATED
WITHIN CLOSE PROXIMITY OF AREAS WHERE HEAVY EQUIPMENT WILL OPERATE.
7. A CLEAN, STRAIGHT EDGE SHALL BE SAWCUT BETWEEN ALL CONCRETE AND ASPHALT SURFACES
SCHEDULED FOR DEMOLITION AND CONCRETE AND ASPHALT SURFACES TO REMAIN IN-PLACE.
8. TERMINAL ENDS OF UNDERGROUND UTILITIES ABANDONED IN-PLACE SHALL BE CUT, CAPPED AND
PLUGGED. THE ENDS OF DISCONNECTED UNDERGROUND UTILITIES SHALL BE MARKED FOR FUTURE
IDENTIFICATION WITH DETECTABLE LOCATOR TAPE OR A METAL ROD.
9. COORDINATE DEMOLITION WORK WITH NEW CONSTRUCTION ELSEWHERE ON THE PROJECT SITE.
10. ALL FOUNDATIONS, SLABS, STRUCTURAL STEEL, MASONRY, SIDEWALKS, RETAINING WALLS, CURBS,
APPARATUSES, ETC., WITHIN DESIGNATED FOR REMOVAL SHALL BE DEMOLISHED ACCORDING TO
SPECIFICATIONS. ALL DEMOLITION WITHIN PROPOSED FOOTPRINT SHALL BE COORDINATED WITH THE
BUILDING DRAWINGS.
11. THE CONTRACTOR IS RESPONSIBLE TO MAINTAIN SAFE ACCESS FOR PEDESTRIANS AND VEHICLE TRAFFIC.
THE CONTRACTOR WILL MAINTAIN ALL UTILITY SERVICES TO ALL BUILDING SECTIONS. IF UTILITY
SERVICES MUST BE INTERRUPTED, THE CONTRACTOR SHALL COORDINATE THAT SHUTDOWN TO MINIMIZE
IMPACT TO THE BUILDING AND SCHOOL FACILITIES. COORDINATE SHUTDOWN AT LEAST ONE WEEK IN
ADVANCE WITH BUSINESS, OWNER'S REPRESENTATIVE AND FACILITY MANAGER.
12.
13. EXISTING MANHOLES, CATCH BASINS, CLEANOUTS, VALVE BOXES, FRAMES COVERS AND GRATES
REMAINING IN USE SHALL BE PROTECTED AND ADJUSTED TO FINAL GRADES.
14. REMOVE EXISTING UTILITIES ONLY AFTER CRITICAL NEW SYSTEMS ARE IN PLACE AND OPERATIONAL (I.E.
STORM DRAINAGE, SERVICES TO EXISTING STRUCTURES). IT IS THE CONTRACTOR'S RESPONSIBILITY TO
PROVIDE PROPER REMOVAL, INCLUDING SAFE SEQUENCING OF UTILITY REMOVAL. CONTRACTOR SHALL
MAINTAIN POSITIVE DRAINAGE AT ALL TIMES.
15. FOR ALL UTILITY LINES AND STRUCTURES DESIGNATED TO BE REMOVED, PLACE AND COMPACT
STRUCTURAL BACKFILL WITHIN TRENCH/EXCAVATION.
16. SAWCUT INTEGRAL CURB & WALK AT NEAREST CONSTRUCTION JOINT WHEN ADJACENT
INTEGRAL CURB & WALK IS TO REMAIN.
17. CONTRACTOR SHALL CUT CONCRETE AT NEAREST CONSTRUCTION JOINT.
P2
P3
INDICATES ASPHALT PAVEMENT REMOVAL
DEMOLITION PLAN NOTES
PROTECTION LEGEND
WITHIN THE LIMITS OF DEMOLITION, THE CONTRACTOR SHALL REMOVE ANY AND ALL OF THE
FOLLOWING FEATURES :
·PAVEMENT, WALKS, CURBS, BRICKS AND ANY OTHER HARDSCAPE SURFACE.
·STRUCTURES OF ANY KIND INCLUDING, BUT NOT LIMITED TO DUGOUTS, FENCES,
SCOREBOARDS, LIGHT POLES, PITS OR RETAINING WALLS. FOUNDATIONS SHALL BE
COMPLETELY REMOVED OR PULVERIZED IN ACCORDANCE WITH THE SPECIFICATIONS.
· ANY AND ALL UTILITY SERVICE LINES FOR EVERY STRUCTURE MUST BE COMPLETELY REMOVED
BACK TO THE MAIN IN ACCORDANCE WITH THE REQUIREMENTS OF THE UTILITY OWNER. ALL
WATER AND SANITARY SERVICE LINES SHALL BE REMOVED.
· ASSUME ALL WATER SERVICES MUST BE REMOVED TO THE CORPORATION STOPS AND ALL
SANITARY SEWER SERVICES MUST BE REMOVED AND CAPPED AT THE MAIN.
· ALL VEGETATION - ALIVE OR DEAD - INCLUDED ALL STUMPS AND ANY SURFACE STORED OR
BURIED LANDSCAPE MATERIALS.
· ANY BUILDING ACCESSORY ITEMS INCLUDING, BUT NOT LIMITED TO, AIR CONDITIONING
UNITS, HVAC UNITS, PROPANE TANKS, FUEL TANKS, SEPTIC TANKS AND UNDERGROUND FUEL
STORAGE TANKS.
· FENCES OF ANY KIND. THE FENCES ALONG THE ADJACENT PROPERTY LINES SHALL NOT BE
REMOVED.
·TOPSOIL EXCEPT WHAT IS NEEDED FOR PROPOSED LANDSCAPING AREAS.
·ANY OTHER ABOVE OR BELOW GRADE OBJECT LARGER THAN 2-INCHES IN DIAMETER WITHIN
THE LIMITS OF DEMOLITION.
· STORM WATER PIPE, ELECTRIC LINE and SANITARY MAIN SHALL BE PROTECTED FROM
DEMOLITION AS INDICATED ON THIS SHEET.
PROTECT EXISTING STORM SEWER AND STRUCTURES
PROTECT EXISTING POWER LINE AND STRUCTURES. COORDINATE REMOVAL TIMING
WITH ELECTRIC COMPANY & SCHOOL.
PROTECT EXISTING SANITARY MAIN
PROTECT EXISTING TREES. PROVIDE TREE PROTECTION FENCE AT DRIPLINE OF
TREES.
PROTECT EXISTING WATERMAIN AND STRUCTURES AS SHOWN FOR CONNECTION
TO THE NEW BUILDING
P4
P5
THE NORTH SCHOOL BUILDING WILL REMAIN OPEN DURING CONSTRUCTION. THE CONTRACTOR, IN
COORDINATION WITH THE CONSTRUCTION MANAGER, SHALL TAKE EXTREME CARE TO PROTECT
CHILDREN, STAFF, AND PEDESTRIANS. ALL DEMOLITION MUST BE CLOSELY COORDINATED WITH
CARMEL SCHOOLS. ALL UTILITIES AND SERVICE TO THE EXISTING BUILDING MUST REMAIN ACTIVE
THROUGH OUT THE 2019 / 2020 AND 2020 / 2021 SCHOOL YEARS.
CRITICAL PARAMETER
TREE PROTECTION FENCE
APPROXIMATE LIMITS OF DEMOLITION
DEMOLITION SCOPE
THE CONTRACTOR AND CONSTRUCTION MANAGER SHALL WALK THE SITE WITH THE CARMEL
SCHOOL FACILITIES MANAGER AND SCHOOL ADMINISTRATION TO REVIEW SALVAGED DIRECTIVES.
THIS SHALL OCCUR PRIOR TO EACH PHASE OF DEMOLITION TO ENSURE THAT THE LEGACY AND
CHARACTER OF THE SCHOOL IS CLOSELY CONSIDERED AND PROTECTED BY THE CONSTRUCTION
TEAM.
LEGACY PRESERVATION OHU OHU OHU OHU OHU OHU OHU OHUOHU OHU OHU OHU OHUOHU OHU OHU OHU OHU OHU OHU OHUO HU
OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHUOHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHU OHUN00°00'09"E (M) NORTH (R) 1000.00'E
E
E E
E
E
E
E
CEE
E
E
E
E
E EC
C
E
EEE
E EEEG
G G G G G G G
W W
W
W W W WW
W W W W WW W WWWWEE EEEEE EE EE E
E
EE EEE
E E E E E E
E E E E E E E
G
E
E
E E E E E E E E
E
E
E EEEEEE EEE
E
E E
E EEE E E
EEEEE E E
E E
W W WEEE
E EEEEE
E E
E
E E EE
E EEEE EE
EEEEE EE E E
E
E
E
E
E
E EE EEE E E EE EE E EEEEE EEE
E E E
E E
E
E
S89°45'41"W (M) WEST (R) 653.40' S00°00'09"W (M) SOUTH (R) 1000.00'E
E
WATER MAIN
DEPTH 4.75'
P3
P3
P3
P2
P5
P4
UNKNOWN MANHOLE AND
REMOVAL IS WARRANTED
COORDINATE SHED RELOCATION
WITH SCHOOL & SHED OWNER.
INCLUDE SHED RELOCATION
IN BID SCOPE.
PRESERVE & PROTECT ALL INFRASTRUCTURE
INCLUDING BUT NOT LIMITED TO PARKING,
UTILITIES, STRUCTURES, ACCESS WAYS, AND
PLAYGROUND EQUIPMENT THAT SERVE THE
BUILDING UNTIL FINAL DEMOLITION OF THE
EXISTING SCHOOL BUILDING.LEXINGTON BLVDREMOVE
WATER
SERVICE
Project Number:
Drawing Number:
Certified By:
Checked ByDrawn ByIssue Date
Revisions:PROJECT:Scope Drawings:CARMEL, INDIANAFORCARMEL CLAY SCHOOLSNEW ELEMENTARY SCHOOLSDrawing Title:
11-19-19 SO MK
18094
Rev. #Revision
Description
Issue
Date
SCALE: 1" = 30'
EXISTING
CONDITIONS &
DEMOLITION
PLAN
(SOUTH)
C103
C102 MATCH LINE
1 ADDENDUM # 3 12/20/2019
05/27/20