CONFORMEDSETINLET
EC-3C FABRIC DROP INLET PROTECTION
SCALE: NONE
PLAN
ELEVATION3' MAX.1' MIN.2"x2" INTERIOR REINFORCEMENT
2"x2" OR 2"x4" WOOD POSTS
OR STEEL FENCE POSTS
NON-WOVEN FILTER FABRIC.
ATTACHED TO ALL SIDES.
NOTES:
DIMENSIONS OF BOX WILL VARY ACCORDING
TO THE SIZE OF INLET AND DEPTH OF BASE.
BURIED FABRIC1.5' MAX.SCALE: NONE
CONCRETE WASHOUTEC-25
SCALE: NONE
ROCK CHUTE OUTLET PROTECTION EC-7
MAINTENANCE
1. INSPECT PERIODICALLY AND AFTER EACH STORM EVENT FOR STONE DISPLACEMENT AND
EROSION AT THE
SIDES AND ENDS OF THE APRON.
2. MAKE REPAIRS IMMEDIATELY; USE APPROPRIATE SIZE STONE, AND DO NOT PLACE THEM
ABOVE FINISHED
GRADE.
MAINTENANCE
1. INSPECT ROCK CHUTES AFTER STORM EVENTS FOR STONE DISPLACEMENT AND FOR
EROSION AT THE SIDES AND ENDS OF THE APRON.
DANDY BAG DETAILS7
SCALE: NONE
DANDY BAG
Installation: Remove the grate from catch basin. If using optional oil absorbents; place
absorbent pillow in unit. Stand the grate on end. Move the top lifting straps out of the way and
place the grate into the Dandy Bag II so that the grate is below the top straps and above the
lower straps. Holding the lifting devices, insert the grate into the inlet.
Maintenance: Remove all accumulated sediment and debris from vicinity of unit after each
storm event. After each storm event and at regular intervals, look into the Dandy Bag II. If the
containment area is more than 1/3 full of sediment, the unit must be emptied. To empty unit,
lift the unit out of the inlet using the lifting straps and remove the grate. If using optional oil
absorbents; replace absorbent when near saturation.
Installation and Maintenance Guidelines
GRATE
MONOFILAMENT
DUMPING STRAP
REMOVAL OF CONTENTS
ALLOWS FOR EASY
DANDY BAG
LIFT STRAPS
AN ORANGE WOVEN
STANDARD FABRIC IS
II
DANDY BAG
II
II
CLOSURE
VELCROTO ENCLOSE GRATE
FLAP FOLDS OVER
IS AN ORANGE
WOVEN MONOFILIMENT
GRATE
STRAPS
ALLOW EASY
MOVEMENT
OF UNIT
WITH GRATE
DANDY BAGGRATE
LIFTING
STANDARD FABRIC
DANDY BAG
DANDY BAG
R
Installation and Maintenance Guidelines
DANDY BAG
Installation: The empty Dandy Bag should be placed over the grate as the grate stands on
end. If using optional oil absorbents; place absorbent pillow in pouch, on the bottom
(below-grade side) of the unit. Attach absorbent pillow to tether loop. Tuck the enclosure
flap inside to completely enclose the grate. Holding the lifting devices (do not rely on lifting
devices to support the entire weight of the grate), place the grate into its frame.
Maintenance: Remove all accumulated sediment and debris from surface and vicinity of unit
after each storm event. Remove sediment that has accumulated within the containment area
of the Dandy Bag as needed. If using optional oil absorbents; remove and replace absorbent
pillow when near saturation.
OTHER THAN IN THE SHADED AREAS USE MULCH
IRRIGATION NEEDED DURING THIS PERIOD TO CONTROL EROSION AT TIMES
** INCREASE SEEDING APPLICATION BY 50%
* LATE SUMMER SEEDING DATES MAY BE EXTENDED 5 DAYS IF MULCH IS APPLIED
NOV.DEC.
NOV.DEC.
OCT.SEP. JUL. AUG.
OCT.SEP. JUL. AUG.
REMARKS
WET
21
DROUGHTY
2
1
12
SITE SUITABILITY*
WELL
DRAINED
MAY FEB. MAR.APR.
MAY FEB. MAR.APR.
JAN.
OATS
JAN.
TEMPORARY SEEDING DATES
PERMANENT SEEDING DATES
WHEET OR RYE
ANNUAL RYEGRASS
NON-IRRIGATED*
ACRE
2 BU.
3 BU.
40 LB. 1 LB.
SPRING OATS
1,000 SF
3.5 LBS.
2.3 LBS.
.8
LBS/
1,000 SF
.6
.12
.4
.4
SEEDING RATE
15
LBS/
ACRE
15
25
5
35
SPECIES
LEVEL AND SLOPING, OPEN AREAS
DORMANT SEEDING**
TYPE OF SEED
WHEET OR RYE
ANNUAL RYEGRASS
3. KENTUCKY BLUEGRASS
CREEPING RED FESCUE
2. TALL FESCUE
RED CLOVER
1. TALL FESCUE
IRRIGATED
TEMPORARY SEEDING RATE
PERMANENT SEEDING MIXTURES
JUN.
JUN.
COVER SEED 1"-1 1/2" DEEP
COVER SEED 1" DEEP
COVER SEED 1/4" DEEP
SUITABLE pH
5.8-7.5
5.5-8.3
5.5-8.3
2
1
1
2
2
1
12
SCALE: NONE
.8
.6
.9
.25
4.0
4.0
.9
35
25
10
40
170
40
170
5. TALL FESCUE
KENTUCKY BLUEGRASS
EMERALD CROWNVETCH**
6. KENTUCKY BLUEGRASS
7. PERENNIAL RYEGRASS
CREEPING RED FESCUE
8. TALL FESCUE
(TURF TYPE)
EC-SC SEASONAL SOIL PROTECTION CHART
5.5-8.3
5.8-7.5
5.0-7.5
5.5-8.3
SEEDED PREPARATION
APPLY LIME TO RAISE THE pH TO THE LEVEL NEEDED FOR SPECIES BEING SEEDED.
APPLY 23 POUNDS OF 12-12-12 ANALYSIS FERTILIZER (OR EQUIVALENT) PER 1000 SF
(APPROXIMATELY 1000 POUNDS PER ACRE) OR FERTILIZE ACCORDING TO TEST
APPLICATION OF 150 LBS. OF AMMONIUM NITRATE ON AREAS LOW IN ORGANIC MATTER
AND FERTILITY WILL GREATLY ENHANCE VEGETATIVE GROWTH.
WORK THE FERTILIZER AND LIME INTO THE SOIL TO A DEPTH OF 2-3 INCHES WITH A
HARROW, DISK OR RAKE OPERATED ACROSS THE SLOPE AS MUCH AS POSSIBLE.
DO NOT USE PHOSPHOROUS CONTAINING FERTILIZERS (12-12-12) UNLES SOIL TEST SHOW
A DEFICIENCY IN PHOSPHOROUS.
SEEDING
SELECT A SEED MIXTURE BASED ON PROJECTED USE OF THE AREA (SEE PERMANENT
SEED MIXTURE CHART), WHILE CONSIDERING BEST SEEDING DATES. IF PERMANENT
SEEDING IS NOT PERMITTED USE TEMPORARY SEEDING UNTIL PERMANENT SEEDING CAN
BE APPLIED. IF TOLERANCES ARE A PROBLEM, SUCH AS SALT TOLERANCE OF SEEDINGS
ADJACENT TO STREETS AND HIGHWAYS, SEE SEED TOLERANCE CHART.
21 2 5.8-7.5 .4 154. TALL FESCUE
GEOTEXTILE FABRIC
or AS REQ
U
I
RED
INDOT COURSE AGG NO. 2
MAINTENANCE REQUIREMENTS
INSPECT ENTRANCE PAD AND SEDIMENT DISPOSAL AREA DAILY, AFTER STORM EVENTS, AND/OR
HEAVY USE.
RESHAPE PAD AS NEEDED FOR DRAINAGE AND RUNOFF CONTROL.
TOPDRESS WITH CLEAN STONE AS NEEDED.
IMMEDIATELY REMOVE MUD AND SEDIMENT TRACKED OR WASHED ONTO PUBLIC ROADS BY
BRUSHING OR SWEEPING. FLUSH ONLY IF WATER IS CONVEYED TO A SEDIMENT TRAP OR BASIN.
REPAIR ANY BROKEN ROAD PAVEMENT IMMEDIATELY.
EC-22
3.
5.
4.
2.
1.
50'
ROAD
PUBLIC
TEMPORARY CONSTRUCTION ENTRANCE
SCALE: NONE
6" COMPACTED THICKNESS
or AS REQUI
RED20'
SILT FENCE
JOINT LAP
DETAIL
SECTION
TO ATTATCH SILT FENCE
COMPACTED SOIL
MAINTENANCE
1. INSPECT THE SILT FENCE PERIODICALLY AND AFTER EACH STORM EVENT.
2. IF FENCE FABRIC TEARS, STARTS TO DECOMPOSE, OR IN ANY WAY BECOMES INEFFECTIVE,
REPLACE THE AFFECTED PORTION IMMEDIATELY.
3. REMOVE DEPOSITED SEDIMENT WHEN IT REACHES HALF THE HEIGHT OF THE FENCE AT ITS
LOWEST POINT OR IS CAUSING THE FABRIC TO BULGE.
4. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEAN OUT.
5. AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE THE FENCE AND
SEDIMENT DEPOSITS, BRING THE DISTURBED AREA TO GRADE, AND STABILIZE.
SILT FENCE BARRIER INSTALLATION
DRIVE STAKES IN TRENCH
EC-2
BACKFILL AND
COMPACT SOIL.
EXCAVATE A 4" X 8"
STEP 3:
DEEP TRENCH
STEP 1:
6' c-c
4"
8"
FLOW
SILT FENCE
STEP 2:
SCALE: NONE
18"min.
2" x 2" STAKE
FASTEN FABRIC TO STAKES
AND BURY BOTTOM 8" INTO
2" X 2"
STAKES
DUTY FABRIC
NON-WOVEN HEAVY
SECTION
NOTE: THE SLICING METHOD IS AN ACCEPTABLE ALTERNATIVE
THE TRENCH
STAKE
SILT FENCE
9
SCALE: N/A
COIR LOG CHECK DAM
SCALE: N/A
TRIPLE COIR LOG CHECK DAM6
ORANGE PLASTIC FENCING
INSTALLED AT THE DRIPLINE
DRIP LINE DRIP LINE
SCALE: NONE
TREE AND SHRUB PRESERVATION WITH TEMPORARY FENCING