Loading...
HomeMy WebLinkAboutC404 - SWPP DETAILSProject Number: Drawing Number: Certified By: Checked ByDrawn ByIssue Date Revisions:PROJECT:Scope Drawings:CARMEL, INDIANAFORCARMEL CLAY SCHOOLSNEW ELEMENTARY SCHOOLSDrawing Title: 11-19-19 SO MK 18094 Rev. #Revision Description Issue Date CONFORMEDSETINLET EC-3C FABRIC DROP INLET PROTECTION SCALE: NONE PLAN ELEVATION3' MAX.1' MIN.2"x2" INTERIOR REINFORCEMENT 2"x2" OR 2"x4" WOOD POSTS OR STEEL FENCE POSTS NON-WOVEN FILTER FABRIC. ATTACHED TO ALL SIDES. NOTES: DIMENSIONS OF BOX WILL VARY ACCORDING TO THE SIZE OF INLET AND DEPTH OF BASE. BURIED FABRIC1.5' MAX.SCALE: NONE CONCRETE WASHOUTEC-25 SCALE: NONE ROCK CHUTE OUTLET PROTECTION EC-7 MAINTENANCE 1. INSPECT PERIODICALLY AND AFTER EACH STORM EVENT FOR STONE DISPLACEMENT AND EROSION AT THE SIDES AND ENDS OF THE APRON. 2. MAKE REPAIRS IMMEDIATELY; USE APPROPRIATE SIZE STONE, AND DO NOT PLACE THEM ABOVE FINISHED GRADE. MAINTENANCE 1. INSPECT ROCK CHUTES AFTER STORM EVENTS FOR STONE DISPLACEMENT AND FOR EROSION AT THE SIDES AND ENDS OF THE APRON. DANDY BAG DETAILS7 SCALE: NONE DANDY BAG Installation: Remove the grate from catch basin. If using optional oil absorbents; place absorbent pillow in unit. Stand the grate on end. Move the top lifting straps out of the way and place the grate into the Dandy Bag II so that the grate is below the top straps and above the lower straps. Holding the lifting devices, insert the grate into the inlet. Maintenance: Remove all accumulated sediment and debris from vicinity of unit after each storm event. After each storm event and at regular intervals, look into the Dandy Bag II. If the containment area is more than 1/3 full of sediment, the unit must be emptied. To empty unit, lift the unit out of the inlet using the lifting straps and remove the grate. If using optional oil absorbents; replace absorbent when near saturation. Installation and Maintenance Guidelines GRATE MONOFILAMENT DUMPING STRAP REMOVAL OF CONTENTS ALLOWS FOR EASY DANDY BAG LIFT STRAPS AN ORANGE WOVEN STANDARD FABRIC IS II DANDY BAG II II CLOSURE VELCROTO ENCLOSE GRATE FLAP FOLDS OVER IS AN ORANGE WOVEN MONOFILIMENT GRATE STRAPS ALLOW EASY MOVEMENT OF UNIT WITH GRATE DANDY BAGGRATE LIFTING STANDARD FABRIC DANDY BAG DANDY BAG R Installation and Maintenance Guidelines DANDY BAG Installation: The empty Dandy Bag should be placed over the grate as the grate stands on end. If using optional oil absorbents; place absorbent pillow in pouch, on the bottom (below-grade side) of the unit. Attach absorbent pillow to tether loop. Tuck the enclosure flap inside to completely enclose the grate. Holding the lifting devices (do not rely on lifting devices to support the entire weight of the grate), place the grate into its frame. Maintenance: Remove all accumulated sediment and debris from surface and vicinity of unit after each storm event. Remove sediment that has accumulated within the containment area of the Dandy Bag as needed. If using optional oil absorbents; remove and replace absorbent pillow when near saturation. OTHER THAN IN THE SHADED AREAS USE MULCH IRRIGATION NEEDED DURING THIS PERIOD TO CONTROL EROSION AT TIMES ** INCREASE SEEDING APPLICATION BY 50% * LATE SUMMER SEEDING DATES MAY BE EXTENDED 5 DAYS IF MULCH IS APPLIED NOV.DEC. NOV.DEC. OCT.SEP. JUL. AUG. OCT.SEP. JUL. AUG. REMARKS WET 21 DROUGHTY 2 1 12 SITE SUITABILITY* WELL DRAINED MAY FEB. MAR.APR. MAY FEB. MAR.APR. JAN. OATS JAN. TEMPORARY SEEDING DATES PERMANENT SEEDING DATES WHEET OR RYE ANNUAL RYEGRASS NON-IRRIGATED* ACRE 2 BU. 3 BU. 40 LB. 1 LB. SPRING OATS 1,000 SF 3.5 LBS. 2.3 LBS. .8 LBS/ 1,000 SF .6 .12 .4 .4 SEEDING RATE 15 LBS/ ACRE 15 25 5 35 SPECIES LEVEL AND SLOPING, OPEN AREAS DORMANT SEEDING** TYPE OF SEED WHEET OR RYE ANNUAL RYEGRASS 3. KENTUCKY BLUEGRASS CREEPING RED FESCUE 2. TALL FESCUE RED CLOVER 1. TALL FESCUE IRRIGATED TEMPORARY SEEDING RATE PERMANENT SEEDING MIXTURES JUN. JUN. COVER SEED 1"-1 1/2" DEEP COVER SEED 1" DEEP COVER SEED 1/4" DEEP SUITABLE pH 5.8-7.5 5.5-8.3 5.5-8.3 2 1 1 2 2 1 12 SCALE: NONE .8 .6 .9 .25 4.0 4.0 .9 35 25 10 40 170 40 170 5. TALL FESCUE KENTUCKY BLUEGRASS EMERALD CROWNVETCH** 6. KENTUCKY BLUEGRASS 7. PERENNIAL RYEGRASS CREEPING RED FESCUE 8. TALL FESCUE (TURF TYPE) EC-SC SEASONAL SOIL PROTECTION CHART 5.5-8.3 5.8-7.5 5.0-7.5 5.5-8.3 SEEDED PREPARATION APPLY LIME TO RAISE THE pH TO THE LEVEL NEEDED FOR SPECIES BEING SEEDED. APPLY 23 POUNDS OF 12-12-12 ANALYSIS FERTILIZER (OR EQUIVALENT) PER 1000 SF (APPROXIMATELY 1000 POUNDS PER ACRE) OR FERTILIZE ACCORDING TO TEST APPLICATION OF 150 LBS. OF AMMONIUM NITRATE ON AREAS LOW IN ORGANIC MATTER AND FERTILITY WILL GREATLY ENHANCE VEGETATIVE GROWTH. WORK THE FERTILIZER AND LIME INTO THE SOIL TO A DEPTH OF 2-3 INCHES WITH A HARROW, DISK OR RAKE OPERATED ACROSS THE SLOPE AS MUCH AS POSSIBLE. DO NOT USE PHOSPHOROUS CONTAINING FERTILIZERS (12-12-12) UNLES SOIL TEST SHOW A DEFICIENCY IN PHOSPHOROUS. SEEDING SELECT A SEED MIXTURE BASED ON PROJECTED USE OF THE AREA (SEE PERMANENT SEED MIXTURE CHART), WHILE CONSIDERING BEST SEEDING DATES. IF PERMANENT SEEDING IS NOT PERMITTED USE TEMPORARY SEEDING UNTIL PERMANENT SEEDING CAN BE APPLIED. IF TOLERANCES ARE A PROBLEM, SUCH AS SALT TOLERANCE OF SEEDINGS ADJACENT TO STREETS AND HIGHWAYS, SEE SEED TOLERANCE CHART. 21 2 5.8-7.5 .4 154. TALL FESCUE GEOTEXTILE FABRIC or AS REQ U I RED INDOT COURSE AGG NO. 2 MAINTENANCE REQUIREMENTS INSPECT ENTRANCE PAD AND SEDIMENT DISPOSAL AREA DAILY, AFTER STORM EVENTS, AND/OR HEAVY USE. RESHAPE PAD AS NEEDED FOR DRAINAGE AND RUNOFF CONTROL. TOPDRESS WITH CLEAN STONE AS NEEDED. IMMEDIATELY REMOVE MUD AND SEDIMENT TRACKED OR WASHED ONTO PUBLIC ROADS BY BRUSHING OR SWEEPING. FLUSH ONLY IF WATER IS CONVEYED TO A SEDIMENT TRAP OR BASIN. REPAIR ANY BROKEN ROAD PAVEMENT IMMEDIATELY. EC-22 3. 5. 4. 2. 1. 50' ROAD PUBLIC TEMPORARY CONSTRUCTION ENTRANCE SCALE: NONE 6" COMPACTED THICKNESS or AS REQUI RED20' SILT FENCE JOINT LAP DETAIL SECTION TO ATTATCH SILT FENCE COMPACTED SOIL MAINTENANCE 1. INSPECT THE SILT FENCE PERIODICALLY AND AFTER EACH STORM EVENT. 2. IF FENCE FABRIC TEARS, STARTS TO DECOMPOSE, OR IN ANY WAY BECOMES INEFFECTIVE, REPLACE THE AFFECTED PORTION IMMEDIATELY. 3. REMOVE DEPOSITED SEDIMENT WHEN IT REACHES HALF THE HEIGHT OF THE FENCE AT ITS LOWEST POINT OR IS CAUSING THE FABRIC TO BULGE. 4. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEAN OUT. 5. AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE THE FENCE AND SEDIMENT DEPOSITS, BRING THE DISTURBED AREA TO GRADE, AND STABILIZE. SILT FENCE BARRIER INSTALLATION DRIVE STAKES IN TRENCH EC-2 BACKFILL AND COMPACT SOIL. EXCAVATE A 4" X 8" STEP 3: DEEP TRENCH STEP 1: 6' c-c 4" 8" FLOW SILT FENCE STEP 2: SCALE: NONE 18"min. 2" x 2" STAKE FASTEN FABRIC TO STAKES AND BURY BOTTOM 8" INTO 2" X 2" STAKES DUTY FABRIC NON-WOVEN HEAVY SECTION NOTE: THE SLICING METHOD IS AN ACCEPTABLE ALTERNATIVE THE TRENCH STAKE SILT FENCE 9 SCALE: N/A COIR LOG CHECK DAM SCALE: N/A TRIPLE COIR LOG CHECK DAM6 ORANGE PLASTIC FENCING INSTALLED AT THE DRIPLINE DRIP LINE DRIP LINE SCALE: NONE TREE AND SHRUB PRESERVATION WITH TEMPORARY FENCING C404 SWPP DETAILS 3 ASI 001 02/14/2020 3 3 05/27/20