Loading...
HomeMy WebLinkAboutC509 - PLAN & PROFILE (STORM)OHU OHU OHUOHU OHU OHU OHU OHU OHUOHU OHUW W W W WW W W W W W WWDO NOTENTERSTO PSTOPTP6''SSD 6''SSDSD6''SSD 6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD 6''SSD 6''SSD6''SSD 6''SSD6''SSD6''SSD 6''SSD6''SSD6''SSD 6''SSDNO PARKING6''SSD6''SSD6''SSD6''SSD6''SSD 6''SSD6''SSD 6''SSD6''SSD 6''SSD 6''SSD 6''SSD6 '' S SD 6''SSD6''SSD 6''SSD6''SSD6''SSD6''SSD 6''SSD 745 RIM=852.25 776 RIM=852.55 786 RIM=852.50 744 RIM=852.00 746 RIM=852.20 756 RIM=851.30 787 RIM=851.50 781 RIM=851.00 757 RIM=851.30 784 RIM=851.00 785 RIM=851.00 775 RIM=851.00 782 RIM=851.00 780 RIM=851.00 10 6' OF 24 " RCP @0 .49% 10' OF 12" RCP @1.52% OF 15" RCP 63%79' OF 18" RCP @0.47 %144' OF 24" RCP@0.45%8 0 ' OF 1 2 " RC P@0 . 5 0% 2 7 ' O F 1 2 " R C P@1. 6 5 %48' OF 12" RCP @0.41% 79' O F 12 " RCP @0 .58 %78' OF 24" RCP@0.32%106' OF 24" RCP @0.41%161' OF 12" RCP @0.69% 9 7 ' O F 1 2 " R C P@1. 9 5 % P I 0 + 7 9 . 5 3 PI2+40.10PI3+18.41STRUCTURE 756,745,743 STRUCTURE 743,734,742,732 165' 0.30% 30" RCP STR. #742 DIVERSION MANHOLE, 7' DIA., SEE DETAIL C603; R-1772TC: 854.50INV. IN 844.09 (30" HDPE (W))INV. OUT 843.99 (30" RCP (NE)) 8' 0.37% 30" HDPESTR. #734 MANHOLE, 6' DIA.; R-1772TC: 854.20INV. IN 844.29 (30" RCP (SW))INV. IN 848.00 (12" RCP (N))INV. OUT 844.19 (30" HDPE (E)) 32' 0.31% 30" HDPESTR. #743 MH 4' DIA.; R-3010TC: 851.50INV. IN 844.88 (24" RCP (W))INV. OUT 844.78 (30" RCP (NE))STR. #744 INLET M; R-3010TC: 852.00INV. OUT 848.30 (12" RCP (E)) 35' 0.42% 12" RCPSTR. #745 MANHOLE, 4' DIA.; R-1772TC: 852.25INV. IN 845.50 (24" RCP (S))INV. IN 848.15 (12" RCP (W))INV. OUT 845.40 (24" RCP (E))STRUCTURE 744-745 10 - YEAR HGL 10 - YEAR HGLSTR. #745 MANHOLE, 4' DIA.; R-1772TC: 852.25INV. IN 845.50 (24" RCP (S))INV. IN 848.15 (12" RCP (W))INV. OUT 845.40 (24" RCP (E))STR. #756 MH 4' DIA.; R-3010TC: 851.30INV. IN 846.52 (24" RCP (S))INV. IN 847.50 (12" RCP (W))INV. IN 847.15 (12" RCP (E))INV. OUT 846.42 (24" RCP (N))STR. #743 MH 4' DIA.; R-3010TC: 851.50INV. IN 844.88 (24" RCP (W))INV. OUT 844.78 (30" RCP (NE)) 259' 0.36% 24" RCP 106' 0.49% 24" RCP FG EG FG EG FG EG FG EG STR. #732 MANHOLE, 7' DIA.; R-1772TC: 854.60INV. IN 843.93 (30" RCP (SW))INV. IN 843.93 (15" RCP (W))INV. OUT 843.83 (30" HDPE (E)) 15' 0.40% 30" RCP (PRIVATE) (PRIVATE) (PRIVATE) (PRIVATE) (PRIVATE) (PRIVATE) (PRIVATE)OH U OHU OHUOHU OHUTP T P TP TP TPTPTPTPTP T PTP TPTP TPTP TPTP TP STOPDRIVE TO BE CONSTRUCTED BY OTHERSWALK TO BE CONSTRUCTED BY OTHERS6''SSD 6''SSD6''SSD 6''S SD 6' 'SSD6''SSD 6''SSD6''SSD 6''SSD 6''SSD 6''SSD742 RIM=854.50 743 RIM=851.50 783 RIM=851.50 736 RIM=854.00 735 RIM=854.40 165' OF 30" RCP @0.30% 9 7 ' O F 1 2 " R C P@1. 9 5 % 64' OF 1 2" RCP @1.95 % 734 RIM=854.20 9' OF 12" RCP @1.71% 732 RIM=854.60 733 RIM=854.20 11' OF 15" RCP @0.28% 15' OF 30" RCP @0.40% 32' O F 30" HDPE @0.31% 8' OF 30" HDPE @0.37% 1. TEMPORARY TRAFFIC CONTROL DURING CONSTRUCTION TO CONFORM TO APPLICABLE LOCAL AND STATE STANDARDS. 2. ALL CONSTRUCTION ACTIVITY ON THIS SITE TO BE PERFORMED IN COMPLIANCE WITH APPLICABLE 0.S.H.A. STANDARDS FOR WORKER SAFETY. 3. IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO FIELD VERIFY ALL UTILITY LOCATIONS BEFORE CONSTRUCTION BEGINS. 4. CONTRACTORS SHALL MINIMIZE DAMAGE TO EXISTING TREES. Project Number: Drawing Number: Certified By: Checked ByDrawn ByIssue Date Revisions:PROJECT:Scope Drawings:CARMEL, INDIANAFORCARMEL CLAY SCHOOLSNEW ELEMENTARY SCHOOLSDrawing Title: 11-19-19 SO MK 18094 Rev. #Revision Description Issue Date CONFORMEDSETSTORM SEWER PLAN SCALE: HORZ.: 1"=30' VERT.: 1"=3' GENERAL NOTES LEGEND Existing Grade New Grade Granular Backfill SCALE: 1" = 30' C509 PLAN & PROFILE (STORM) 1 TAC COMMENTS 12/20/2019 The storm sewer system shall be constructed per design specified and as approved by the City of Carmel on the final approved construction plans. Deviations from the approved design shall only be permitted due to special circumstances or difficulty during construction and will require prior field approval from a designated representative of the City of Carmel in addition to supplemental approval by the design engineer. An explanation of any such deviation shall be included as a requirement on as-built/record drawings submitted for release of performance guarantees. Approved design slopes identified as generating velocities of 2.5 fps or less or 10 fps or greater (at full flow capacity) shall require as-built certification at the time of construction, prior to backfilling the pipe. The contractor is instructed to as-built each section of storm pipe as it is being installed to ensure compliance with the design plans and as approved by the City of Carmel. AS-BUILT NOTES 2 TAC COMMENTS 1/3/2020 GRANULAR BACKFILL NOTES ·For RCP storm pipe granular backfill, refer to detail 3, sheet C601. ·For HDPE storm pipe granular backfill, refer to detail 4, sheet C601. · For PVC sanitary sewer, see Carmel Utilities Trench Detail & Trench Schedule on sheet C606. 3 ASI 001 2/14/2020 3 3 05/27/20