Loading...
HomeMy WebLinkAboutC511 - PLAN & PROFILE (STORM)STR. #779 24 INCH NYLOPLAST STRUCTURE, OPEN GRATETC: 854.10INV. OUT 850.10 (12" HDPE (NW)) 63' 2.70% 12" HDPE STR. #778 MH 4' DIA.; R-3010TC: 852.40INV. IN 848.40 (12" HDPE (SE))INV. OUT 848.30 (12" RCP (N)) 60' 0.84% 12" RCP STR. #777 MH 4' DIA.; R-3010TC: 851.90INV. IN 847.80 (12" RCP (S))INV. OUT 846.85 (15" RCP (NE)) 36' 0.63% 15" RCP STR. #776 MH 4' DIA.; R-3010TC: 852.55INV. IN 848.55 (12" HDPE (SE))INV. IN 846.62 (15" RCP (SW))INV. OUT 846.52 (18" RCP (NE)) 79' 0.47% 18" RCP STR. #775 MH 5' DIA.; R-3010TC: 851.00INV. IN 846.15 (18" RCP (SW))INV. IN 846.05 (12" RCP (SE))INV. OUT 846.05 (24" RCP (N)) 144' 0.45% 24" RCP 97' 1.95% 12" RCP STR. #780 MH 4' DIA; R-3405TC: 851.00INV. IN 845.05 (24" RCP (SW))INV. IN 845.60 (12" RCP (NW))INV. OUT 844.95 (24" RCP (E))STRUCTURE 779-775, 781-780 STRUCTURE 783,780 101' 0.32% 30" HDPE STRUCTURE 773,772,770 STR. #781 MH 5' DIA.; R-3010TC: 851.00INV. IN 845.40 (24" RCP (S))INV. IN 846.24 (12" RCP (W))INV. IN 845.40 (12" RCP (SW))INV. OUT 845.30 (24" RCP (NE)) 78' 0.32% 24" RCP STR. #773 MH 5' DIA.;R-3405TC: 851.00INV. IN 844.52 (24" RCP (W))INV. OUT 844.42 (30" HDPE (N))STR. #772 DIVERSION MANHOLE, 7' DIA., SEE DETAIL C603;TC: 854.00INV. IN 844.10 (30" HDPE (S))INV. OUT 844.00 (30" RCP (N))STR. #780 MH 4' DIA; R-3405TC: 851.00INV. IN 845.05 (24" RCP (SW))INV. IN 845.60 (12" RCP (NW))INV. OUT 844.95 (24" RCP (E))STR. #783 INLET M; R-3010TC: 851.50INV. OUT 847.50 (12" RCP (SE))FG EG FG EG FG FG EG 10 - YEAR HGL 10 - YEAR HGL 10 - YEAR HGL 10 - YEAR HGL STR. #770 MANHOLE, 7' DIA.; R-1772TC: 854.20INV. IN 843.94 (30" RCP (S))INV. IN 843.94 (15" RCP (SW))INV. OUT 843.84 (30" HDPE (N)) 11' 0.38% 30" HDPE 15' 0.40% 30" RCP (PRIVATE) (PRIVATE) (PRIVATE) (PRIVATE) (PRIVATE) (PRIVATE) (PRIVATE) (PRIVATE) (PRIVATE) (PRIVATE) E E E E EDO NOTENTERSTO P 12345 678 91012345 67 8 910 6''SSD 6''SSD 6''SSD6''SSD 6''SSD 6''SSDRDRD RD RD RD RD RD RDRD RD RDNO PARKING6''SSD 6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD 6''SSD6''SSD 6''SSD6 ''SSD 6 ''SSD 6' 'SSD 6' 'SSD788 RIM=855.10 779 RIM=854.10 724 RIM=853.00 776 RIM=852.55 786 RIM=852.50 778 RIM=852.40 777 RIM=851.90 787 RIM=851.50 775 RIM=851.00 782 RIM=851.00 6 3 ' OF 1 2 " HDPE@2 . 7 0 %60' OF 12" RCP@0.84%36' OF 15" RCP @0.63%79' OF 18" RCP @0.47%144' OF 24" RCP@0.45%1 2 8 ' OF 1 2 " H D P E@1 . 9 9% 8 0 ' OF 1 2 " RC P@0 . 5 0% 2 7' O F 1 2 " R C P@1.6 5 %161' OF 12" RCP @0.69% 5 2 ' O F 1 2 " RC@0 . 5 7%DO NOTENTERTPTPTPTPTP TPTP STO PSTOPDRIVE TO BE CONSTRUCTED BYWALK TO BE CONSTRUCTED 6 ''SSD 6''S S D 6' 'SSD6''SSD6''SSD6''SSD6 '' S SD 6 '' S S D6''SSD 6''SSD772 RIM=854.00 781 RIM=851.00 783 RIM=851.50 784 RIM=851.00 780 RIM=851.00 773 RIM=851.00165' OF 30" RCP @0.30 %144' OF 24" RCP@0.45%101' OF 30" HDPE@0.32%11' OF 30" HDPE @0.38% 7 9' OF 1 2" RCP @0 .58 %78' OF 24" RCP@0.32%106' OF 24" RCP @0.41%161' OF 12" RCP @0.69 % 9 7' O F 1 2 " R C P@1. 9 5 % 770 RIM=854.20 15' OF 30" RCP @0.40%771 RIM=854.10 11' OF 15" RCP @0.28% 1. TEMPORARY TRAFFIC CONTROL DURING CONSTRUCTION TO CONFORM TO APPLICABLE LOCAL AND STATE STANDARDS. 2. ALL CONSTRUCTION ACTIVITY ON THIS SITE TO BE PERFORMED IN COMPLIANCE WITH APPLICABLE 0.S.H.A. STANDARDS FOR WORKER SAFETY. 3. IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO FIELD VERIFY ALL UTILITY LOCATIONS BEFORE CONSTRUCTION BEGINS. 4. CONTRACTORS SHALL MINIMIZE DAMAGE TO EXISTING TREES. Project Number: Drawing Number: Certified By: Checked ByDrawn ByIssue Date Revisions:PROJECT:Scope Drawings:CARMEL, INDIANAFORCARMEL CLAY SCHOOLSNEW ELEMENTARY SCHOOLSDrawing Title: 11-19-19 SO MK 18094 Rev. #Revision Description Issue Date CONFORMEDSETSTORM SEWER PLAN SCALE: HORZ.: 1"=30' VERT.: 1"=3' GENERAL NOTES LEGEND Existing Grade New Grade Granular Backfill SCALE: 1" = 30' C511 PLAN & PROFILE (STORM) 1 TAC COMMENTS 12/20/2019 The storm sewer system shall be constructed per design specified and as approved by the City of Carmel on the final approved construction plans. Deviations from the approved design shall only be permitted due to special circumstances or difficulty during construction and will require prior field approval from a designated representative of the City of Carmel in addition to supplemental approval by the design engineer. An explanation of any such deviation shall be included as a requirement on as-built/record drawings submitted for release of performance guarantees. Approved design slopes identified as generating velocities of 2.5 fps or less or 10 fps or greater (at full flow capacity) shall require as-built certification at the time of construction, prior to backfilling the pipe. The contractor is instructed to as-built each section of storm pipe as it is being installed to ensure compliance with the design plans and as approved by the City of Carmel. AS-BUILT NOTES 2 TAC COMMENTS 1/3/2020 GRANULAR BACKFILL NOTES ·For RCP storm pipe granular backfill, refer to detail 3, sheet C601. ·For HDPE storm pipe granular backfill, refer to detail 4, sheet C601. · For PVC sanitary sewer, see Carmel Utilities Trench Detail & Trench Schedule on sheet C606. 3 ASI 001 2/14/2020 3 3 3 05/27/20