HomeMy WebLinkAboutC511 - PLAN & PROFILE (STORM)STR. #779 24 INCH NYLOPLAST STRUCTURE, OPEN GRATETC: 854.10INV. OUT 850.10 (12" HDPE (NW)) 63' 2.70% 12" HDPE STR. #778 MH 4' DIA.; R-3010TC: 852.40INV. IN 848.40 (12" HDPE (SE))INV. OUT 848.30 (12" RCP (N)) 60' 0.84% 12" RCP STR. #777 MH 4' DIA.; R-3010TC: 851.90INV. IN 847.80 (12" RCP (S))INV. OUT 846.85 (15" RCP (NE)) 36' 0.63% 15" RCP STR. #776 MH 4' DIA.; R-3010TC: 852.55INV. IN 848.55 (12" HDPE (SE))INV. IN 846.62 (15" RCP (SW))INV. OUT 846.52 (18" RCP (NE)) 79' 0.47% 18" RCP STR. #775 MH 5' DIA.; R-3010TC: 851.00INV. IN 846.15 (18" RCP (SW))INV. IN 846.05 (12" RCP (SE))INV. OUT 846.05 (24" RCP (N)) 144' 0.45% 24" RCP
97' 1.95% 12" RCP STR. #780 MH 4' DIA; R-3405TC: 851.00INV. IN 845.05 (24" RCP (SW))INV. IN 845.60 (12" RCP (NW))INV. OUT 844.95 (24" RCP (E))STRUCTURE 779-775, 781-780 STRUCTURE 783,780
101' 0.32% 30" HDPE
STRUCTURE 773,772,770 STR. #781 MH 5' DIA.; R-3010TC: 851.00INV. IN 845.40 (24" RCP (S))INV. IN 846.24 (12" RCP (W))INV. IN 845.40 (12" RCP (SW))INV. OUT 845.30 (24" RCP (NE)) 78' 0.32% 24" RCP STR. #773 MH 5' DIA.;R-3405TC: 851.00INV. IN 844.52 (24" RCP (W))INV. OUT 844.42 (30" HDPE (N))STR. #772 DIVERSION MANHOLE, 7' DIA., SEE DETAIL C603;TC: 854.00INV. IN 844.10 (30" HDPE (S))INV. OUT 844.00 (30" RCP (N))STR. #780 MH 4' DIA; R-3405TC: 851.00INV. IN 845.05 (24" RCP (SW))INV. IN 845.60 (12" RCP (NW))INV. OUT 844.95 (24" RCP (E))STR. #783 INLET M; R-3010TC: 851.50INV. OUT 847.50 (12" RCP (SE))FG
EG
FG
EG
FG
FG
EG
10 - YEAR HGL 10 - YEAR HGL 10 - YEAR HGL
10 - YEAR HGL STR. #770 MANHOLE, 7' DIA.; R-1772TC: 854.20INV. IN 843.94 (30" RCP (S))INV. IN 843.94 (15" RCP (SW))INV. OUT 843.84 (30" HDPE (N)) 11' 0.38% 30" HDPE
15' 0.40% 30" RCP
(PRIVATE)
(PRIVATE)
(PRIVATE) (PRIVATE)
(PRIVATE)
(PRIVATE)
(PRIVATE)
(PRIVATE)
(PRIVATE)
(PRIVATE)
E
E
E E
EDO NOTENTERSTO
P 12345 678 91012345 67 8 910 6''SSD 6''SSD
6''SSD6''SSD 6''SSD
6''SSDRDRD RD
RD
RD RD
RD
RDRD RD RDNO PARKING6''SSD 6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD 6''SSD6''SSD 6''SSD6 ''SSD 6 ''SSD
6'
'SSD 6'
'SSD788
RIM=855.10
779
RIM=854.10
724
RIM=853.00
776
RIM=852.55
786
RIM=852.50
778
RIM=852.40
777
RIM=851.90
787
RIM=851.50
775
RIM=851.00
782
RIM=851.00
6
3
'
OF
1
2
"
HDPE@2
.
7
0
%60' OF 12" RCP@0.84%36' OF 15" RCP
@0.63%79' OF 18" RCP
@0.47%144' OF 24" RCP@0.45%1
2
8
'
OF
1
2
"
H
D
P
E@1
.
9
9%
8
0
'
OF
1
2
"
RC
P@0
.
5
0%
2
7'
O
F
1
2
"
R
C
P@1.6
5
%161' OF 12" RCP
@0.69%
5
2
'
O
F
1
2
"
RC@0
.
5
7%DO NOTENTERTPTPTPTPTP
TPTP
STO
PSTOPDRIVE TO BE CONSTRUCTED BYWALK TO BE CONSTRUCTED 6 ''SSD 6''S S D
6'
'SSD6''SSD6''SSD6''SSD6
''
S
SD
6
''
S
S
D6''SSD 6''SSD772
RIM=854.00
781
RIM=851.00
783
RIM=851.50
784
RIM=851.00
780
RIM=851.00
773
RIM=851.00165' OF 30" RCP
@0.30
%144' OF 24" RCP@0.45%101' OF 30" HDPE@0.32%11' OF 30" HDPE
@0.38%
7 9' OF 1 2" RCP
@0 .58 %78' OF 24" RCP@0.32%106' OF 24" RCP
@0.41%161' OF 12" RCP
@0.69
%
9
7'
O
F
1
2
"
R
C
P@1.
9
5
%
770
RIM=854.20
15' OF 30" RCP
@0.40%771
RIM=854.10
11' OF 15" RCP
@0.28%
1. TEMPORARY TRAFFIC CONTROL DURING CONSTRUCTION
TO CONFORM TO APPLICABLE LOCAL AND STATE
STANDARDS.
2. ALL CONSTRUCTION ACTIVITY ON THIS SITE TO BE
PERFORMED IN COMPLIANCE WITH APPLICABLE 0.S.H.A.
STANDARDS FOR WORKER SAFETY.
3. IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO FIELD
VERIFY ALL UTILITY LOCATIONS BEFORE CONSTRUCTION
BEGINS.
4. CONTRACTORS SHALL MINIMIZE DAMAGE TO EXISTING
TREES.
Project Number:
Drawing Number:
Certified By:
Checked ByDrawn ByIssue Date
Revisions:PROJECT:Scope Drawings:CARMEL, INDIANAFORCARMEL CLAY SCHOOLSNEW ELEMENTARY SCHOOLSDrawing Title:
11-19-19 SO MK
18094
Rev. #Revision
Description
Issue
Date
CONFORMEDSETSTORM SEWER PLAN
SCALE: HORZ.: 1"=30'
VERT.: 1"=3'
GENERAL NOTES
LEGEND
Existing Grade New Grade Granular Backfill
SCALE: 1" = 30'
C511
PLAN & PROFILE
(STORM)
1 TAC COMMENTS 12/20/2019
The storm sewer system shall be constructed per design specified
and as approved by the City of Carmel on the final approved
construction plans. Deviations from the approved design shall only
be permitted due to special circumstances or difficulty during
construction and will require prior field approval from a designated
representative of the City of Carmel in addition to supplemental
approval by the design engineer. An explanation of any such
deviation shall be included as a requirement on as-built/record
drawings submitted for release of performance guarantees.
Approved design slopes identified as generating velocities of 2.5
fps or less or 10 fps or greater (at full flow capacity) shall require
as-built certification at the time of construction, prior to backfilling
the pipe. The contractor is instructed to as-built each section of
storm pipe as it is being installed to ensure compliance with the
design plans and as approved by the City of Carmel.
AS-BUILT NOTES
2 TAC COMMENTS 1/3/2020
GRANULAR BACKFILL NOTES
·For RCP storm pipe granular backfill, refer to detail 3, sheet C601.
·For HDPE storm pipe granular backfill, refer to detail 4, sheet
C601.
· For PVC sanitary sewer, see Carmel Utilities Trench Detail &
Trench Schedule on sheet C606.
3 ASI 001 2/14/2020
3
3
3
05/27/20