Loading...
HomeMy WebLinkAboutC515 - PLAN & PROFILE (STORM)STR. #795 INLET M; R-3010TC: 852.35INV. OUT 848.50 (12" RCP (E)) 26' 0.39% 12" RCP STR. #744 MH 4' DIA.; R-3010TC: 852.35INV. IN 848.40 (12" RCP (W))INV. OUT 848.30 (12" RCP (SE))STR. #796 INLET M; R-3010TC: 852.20INV. OUT 848.60 (12" RCP (E)) 26' 0.38% 12" RCPSTR. #746 MH 4' DIA.; R-3010TC: 852.20INV. IN 848.50 (12" RCP (W))INV. OUT 848.40 (12" RCP (E))STR. #797 INLET M; R-3010TC: 852.25INV. OUT 848.60 (12" RCP (E)) 24' 0.42% 12" RCP STR. #760 MH 4' DIA.; R-3010TC: 852.25INV. IN 848.50 (12" RCP (W))INV. OUT 848.40 (12" RCP (E)) 66' 0.56% 12" RCP STR. #748 MANHOLE, 5' DIA.; R-1772TC: 854.20INV. IN 849.50 (18" RCP (NE))INV. IN 847.43 (18" RCP (S))INV. IN 848.03 (12" RCP (W))INV. OUT 847.33 (24" RCP (N))STRUCTURE 797, 760, 748 STRUCTURE 796, 746 STRUCTURE 795, 744WWWWOHUOHUOHUOHUOHU OHU OHUG GW W WW W WWC 6''SSD 6''SSD6''SSD 6''SSDTP T P T P T P T P T P TP TPTPTPTP TP TP TPTP TPTP TP ST O P P R O P O S E D B M P & A C C E S S E A S E M E N T 6''SSD6''SSD6''SSD6''S S D 745 RIM=852.25 744 RIM=852.35 743 RIM=851.50 106' OF 24 " R C P @0.49 %165' OF 26' OF 12" RCP @0.39% 795 RIM=852.35 UOHU OHU OHU OHU OHUOHUOHU OHU OHUW W W W WWWW W W6''SSD 6''SSD6''SSD6''SSD6''SSDSSD 6''SSD6''SSD 6 ''SSD 6''SSD6''SSD6 ' ' S SD 6' ' S SD6''SSD6''SSD6''SSD6''SSD6''SSD 6''SSD 6''S SD6''S SDTP 746 RIM=852.20 RIM=851.90 756 RIM=851.30 757 RIM=851.30 784 RIM=851.00 785 RIM=851.00 782 RIM=851.00 10' OF 12" RCP @1.52% 8 0' OF 1 2 " R CP@0 . 5 0% 48' OF 12" RCP @0.41%161' OF P I 0 + 7 9 . 5 3 26' OF 12" RCP @0.38% 796 RIM=852.20 OHU OHU OHU OHUOHU OHU OHU OHUOHU OHU6''SSD6''SSD6 ''SSD 6 ''SSD6''SSD6''SSD 6''SSD6''SSD6''SSD6''SSD6''SS D 6''S S D6''S S D6''SSD 6''SSD 6''SSD 6''SSD6''SSD6''SSD 6''SSD 6''SSD6''S S D6''SSD FDC T C .O . T YPE II C .O . T YPE II C .O . T Y P E II RD RDNO PARKIN G15' ELEC ESMT 748 RIM=854.20 750 RIM=852.70 749 RIM=852.50 760 RIM=852.25 761 RIM=851.80 30' OF 12" RCP@0.33% 23' OF 15" RCP@0.30%61' OF 18" RCP@0.25%189' OF 24" RCP @0.25%65' OF 12" RC P @0.28% 66' OF 12" R C P @0.56% 67' OF 18" RCP @1.05% 199' OF 8" PVC @1.9 7 % 68' OF 8" PVC 156' OF 8" PVC @0.50% 24' OF 12" RCP @0.42% 797 RIM=852.25 1. TEMPORARY TRAFFIC CONTROL DURING CONSTRUCTION TO CONFORM TO APPLICABLE LOCAL AND STATE STANDARDS. 2. ALL CONSTRUCTION ACTIVITY ON THIS SITE TO BE PERFORMED IN COMPLIANCE WITH APPLICABLE 0.S.H.A. STANDARDS FOR WORKER SAFETY. 3. IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO FIELD VERIFY ALL UTILITY LOCATIONS BEFORE CONSTRUCTION BEGINS. 4. CONTRACTORS SHALL MINIMIZE DAMAGE TO EXISTING TREES. C515 Project Number: Drawing Number: Certified By: Checked ByDrawn ByIssue Date Revisions:PROJECT:Scope Drawings:CARMEL, INDIANAFORCARMEL CLAY SCHOOLSNEW ELEMENTARY SCHOOLSDrawing Title: 11-19-19 SO MK 18094 Rev. #Revision Description Issue Date CONFORMEDSETSTORM SEWER PLAN SCALE: HORZ.: 1"=30' VERT.: 1"=3' GENERAL NOTES LEGEND Existing Grade New Grade Granular Backfill SCALE: 1" = 30' PLAN & PROFILE (STORM) 5 ASI 006 03/30/2020 The storm sewer system shall be constructed per design specified and as approved by the City of Carmel on the final approved construction plans. Deviations from the approved design shall only be permitted due to special circumstances or difficulty during construction and will require prior field approval from a designated representative of the City of Carmel in addition to supplemental approval by the design engineer. An explanation of any such deviation shall be included as a requirement on as-built/record drawings submitted for release of performance guarantees. Approved design slopes identified as generating velocities of 2.5 fps or less or 10 fps or greater (at full flow capacity) shall require as-built certification at the time of construction, prior to backfilling the pipe. The contractor is instructed to as-built each section of storm pipe as it is being installed to ensure compliance with the design plans and as approved by the City of Carmel. AS-BUILT NOTES GRANULAR BACKFILL NOTES ·For RCP storm pipe granular backfill, refer to detail 3, sheet C601. ·For HDPE storm pipe granular backfill, refer to detail 4, sheet C601. ·For PVC sanitary sewer, see Carmel Utilities Trench Detail & Trench Schedule on sheet C606. STORM SEWER PROFILE CONSTRUCT CONCRETE CRADLE ON EXISTING STORM LINE PER C605 9 ASI 012 05/05/2020 9 ROTATE STRUCTURE & ADJUST CASTING SO THAT IT WILL NOT BE IN CURB LINE 9 05/27/20