HomeMy WebLinkAboutL103 - Site Materials PlanFDC
C.O.
T
Y
P
E
I
I
C.
O
.
T
Y
P
E
I
I
C.O
.
T
Y
P
E
I
I6''SSD6''SSD6''SSD6''SSD6''SSD
6''SSD6''SSD6''SSD6
''SSD6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD
6''SSD6''SSD
6'
'SSD6''SSD6''SSD
P
RDRD
RD
RD
RD
RDRDRD
RD
RD RD
RDRD RD
NO PARKI
NG C.
O
.
T
Y
P
E
I
C.
O
.
T
Y
P
E
I
C.O
.
T
Y
P
E
I6''SSD 6''SSD 6''SSD6''SSD 6''SSD6''SSD6''SSD6''SSD
UP
UP
UP X X X X X X X XOHUOHU OHUOHU OHU OHU OHU OHUOHU OHU OHU OHU OHUOHU OHU OHU OHU OHU OHU OHU OHU OHUXX X X X X XXXX X X XX XX X X XX X X XX X X XX X X X X XBUSONLYP3.2
x4
PA
PA
PA
PA
PA
PAPA
PA
PA
PA
PA PA
PA
PA
PA
PA
PA
PA
PA
PA
PA
PA
PA
PA
PA
PA
x 38
x4
PA
PA
PA
PA
PA
PA
PA PA
C1.1
C1.2
C1.1
P1.1
P1.3
P1.2
P2.2
P2.2
P2.2
S1.3
C1.3
P2.2
P2.2
P1.3
R1.3
P2.3
P1.1
P1.3
P2.2
P2.2
P2.2
P2.2
P2.2
P2.2
P2.2
P2.2
P2.3
P2.3
P2.3
P2.1
P1.1
R1.2
R1.3
F1.1
F1.2
P1.1
P1.1
C1.1C1.2
C1.2C1.1
C1.1
C1.1
C1.1
C1.1
C1.2
C1.2
C1.1
C1.1
C1.1
C1.2
C1.1
C1.2
C1.1
C1.1
F2.1
F2.1
F2.1
F2.1
S1.2
C1.8
R1.5
S1.2
R1.4S1.5
C1.8
C1.1
C1.8
R1.3
Pavement Alternate 8,431 sf.
Refer to Bidder Instructions
W1.1
F1.4
F1.5
R1.4
C1.1
Meet Existing Pavement
F2.4
P1.1
P1.3
P2.2
P3.2
P3.2
P3.2
P3.2
P3.2
P3.2
P3.2
Mechanical Yard,
Refer to Architectural
Series
C1.8
C1.3
S1.5
S1.3
P2.2 P2.2
P2.2
P2.2
P2.2
C1.2
C1.1
C1.2
C1.1
P3.2
Illuminated Bollards,
Refer to MEP Series X8
F1.6
x3
0
Scale 1" = 30'-0"
60'30'15'
North
P1.0 Pavement, Asphalt
Heavy Duty Asphalt Pavement, Refer to Detail 3/L500
Standard Asphalt Pavement, Refer to Detail 1/L500
Medium Duty Asphalt Pavement, Refer to Detail 2/L500
R1.0 Accessible Sidewalk Ramps
Detectable Warning, Refer to Details 6,7,8 /L504
Parallel Curb Ramp, Refer to Details 1,8/L504
Perpendicular Curb Ramp Adjacent Walkable Surface, Refer
to Details 1, 2 /L504
One Way Directional Perpendicular Curb Ramp with Buffer,
Refer to Details 1, 5, 6/L504
Perpendicular Curb Ramp Adjacent Non-Walkable Surface,
Refer to Details 1, 5, 6 /L504
P2.0 Pavement, Concrete
Heavy Duty Concrete Pavement, Refer to Detail 6/L500
and Specifications
Standard Concrete Pavement, Medium Broom Finish,
Refer to Details 4/L500 and Specifications
Standard Concrete Pavement, Ashlar Stamp Pattern,
Refer to Details 4/L500 and Specifications
Medium Duty Concrete Pavement, Refer to Detail,
5/L500
R1.1
R1.3
R1.2
P1.1
P1.3
P2.1
P1.2
P2.2
R1.4
F2.0 Fencing and Gates
Ornamental Fence and Gate, Refer to Architectural Drawings
and Specifications
Fence, 4'-0" ht., black, vinyl coated, chain link, Refer to
Details 11 and 12/ L502 and Specifications
Double Leaf Swing Gate, Match adjacent fencing, Refer to
Specifications
Vehicular Barrier Gate, Refer to Specifications.
F2.1
C1.0 Curbs
Post Curb, Refer to Detail 2/L501
Integral Curb and Sidewalk, Refer to Detail 9/L500
Wheel Stops, Refer to Detail 1/L502
Playground Post Curb, Refer to Detail 5/L502
Concrete Turndown Edge, Refer to Detail 6/L502
Curb and Gutter, Concrete, Type III, Refer to Detail
8/L501
Flush Turndown Curb, Refer to Detail 10/L500 and
12/L500
Curb and Gutter, Concrete, Type II, Refer to Detail
7/L501
Roll Curb and Gutter, Concrete, Refer to Details
10/L501 and 11/L501
C1.1
C1.3
C1.2
P2.3
S1.0 Signage, (comply with MUTCD Standards)
(VIF Regulatory Signs with City Representative)
Stop, Refer to Detail 6/L501
ADA Parking, Refer to Detail 4/L501
Van Accessible ADA Parking, Refer to Detail 4/L501
Do Not Enter, Refer to Detail 6/L501
ADA Parking Symbol, Refer to Detail 5/L501
Monument Sign, See Architectural Drawings
Directional Sign, See Architectural Drawings
Bus and Service Vehicles Only Sign, Refer to Detail 6/L501
S1.1
S1.3
S1.2
S1.4
S1.5
F1.0 Site Furnishings
Flagpole, Refer to Detail 9/L502 and 1/L503
Bike Rack, Refer to Detail 4/L502
Half Basketball Court, Refer to Detail 2/L502
6' Bench, Refer to Specifications
Trash Receptacle, Refer to Specifications
Steel Pipe Bollard, Refer to Detail 11/L500
Picnic Table and Benches, Refer to Specifications
ADA Picnic Table and Benches, Refer to Specifications
Shade Sails, Refer to Specifications
F1.1
F1.2
P3.0 Pavement, Specialty
Pour in Place Play Surface, Refer to Details 5 and 6/L502
and Specifications
Stone Maintenance Edge (Mow Strip), #6 River Rock, Refer
to Detail 3/L502, 8/L410, and Specifications
P3.1
P3.2
F2.2
F2.3
C1.4
C1.5
F1.3
F1.4
S1.6
S1.7
F1.5
W1.0 Walls
Cast-in-Place Concrete Seat Wall, Smooth Finish,
Refer to Detail 1/L503 and Specifications
W1.1
C1.6
C1.7
C1.8
P2.4
R1.5
F2.4
F1.6
F1.7
F1.8
F1.9
C1.9
S1.8 MATCHLINE - REFER TO SHEET L104MATCHLINE - REFER TO SHEET L101 MATCHLINE - REFER TO SHEET L104 NOTE: Refer to Specifications for all Pavement Striping
Proposed Building
111,802 sq. ft.
FFE: 855.80
MATCHLINE - REFER TO SHEET L101
3 1.Addendum #03 12-20-2019
5 2. TAC Comments 01-03-2020
Bus/ Service Drive & Dedicated ROW to be
constructed according to Carmel's Typical Local
Road Standards, Refer to Detail 13/L500
7 3. ASI #009 04-16-2020
8
8 3. ASI #010 04-27-2020
05/27/20