HomeMy WebLinkAboutL203 - Layout PlanUP
UP UPOHU OHU OHUOHU OHU OHU OHUOHU OHU OHU OHU OHU OHUOHU OHU OHU OHU OHU OHU OHU OHU OHUBUSONLYBUSONLY1
1
7
'
-0
"10'-0" (2 eq)R5'R5'-0"R5'-0" typ.R5'-0" typ.R5'
-0" t
yp.
R5'-0" typ.8'-0" (2 eq)4'-2"8'-0" (2 eq)4'-2"8'-0" (2 eq)17'-11" (3 eq)6'-4" 23'-3"9"R3
0
'
-
0
"
24'-4"
19'-1"
20'-10"
23'-10"
1
4
3
'
-7
"R30'-0"22'-2"438'-7"39'-3"5'-10"1
0
0
'
-1
0
"
10'-3"1'-7"15'-2" (3 eq)
15'-10"16'-2" (4 eq)1
3
'
-0"
(4
e
q
)10'-0" (2 eq)1
1
0
'-0
"
(2
2
e
q
)ejejejej
ejR20'-0"R30'-0"8'-0" (2 eq)16'-4" (4 eq)8'-0" (2 eq)6'-0"ej
220'-1"25'-5"
88'
-
1
0
"R44'-6"121'-3"586'-7"144'-5" (35 eq)10'-0" (2 eq)
R250'-0"
Courtyard B:
Refer to
Enlargement
L206
Courtyard
Refer to Enlargem
Courtyard E:
Refer to Enlargement L20713'-0"14'-11"13'-0"26'-0" typ.1'
-
0
"
ty
p
.
1
3
'-0
"6'-0"R5'-0"R5'-0"1
3
'
-
0
"16'-0"23'-2" (4 eq)13'-0" 85'-4"25'-0"
ej
ej
B1
B2
B4
ej
e j
ej
e j586'-7"385'-1351'-11"18'-0" typ.18'-0" typ.25'-0" typ.8
4
'
-
5
"
(1
1
e
q)
4
6
'
-1
"
(6
e
q
)10'-0" (2 eq)2
5
'
-
0
"
ty
p
.
1
7
'
-0
"
(3R10'-0"441'-9" (71
6
'
-0
"
(3
e
q
)11'-11" (2 eq)5'-0"R25'-0"
R15'-0"135°ej
ej
10'-0" (2 eq)9'-6"R5'-6"R5
'
-0"6'-0" 34'-10" (6 eq) ejejej ejej
ej
ej 57'-10" (8 eq)R5'-0"
R5'-0"
1
4
'
-6
"
1
4
'
-
6
"
2
5
'
-
0"26'-1" (4 eq)5'-0" typ. 16'-0" 8'-0"5'-0" 16'-0" 8'-0"8'-0"Courtyard C:
Refer to Enlargement L206
Courtyard F:
Refer to Enlargement
59'-9"R45'-0"15'-8"R45'-0"
25'-0"
54'-5"
99'-9"R55'-0"R30'-0"58'-1"R37'-0"
16
7
°5'-0"6'
-
1
1
"6'-4"3'-6" 3
4
'
-
0
"
(5
e
q
)
1
3
'
-4
"1
2
'
-
1"49'-11"16'-6"1
4
'-6
"2'-0" typ.10'
-0
"
1
1
'
-
9
"
1. Dimensions are shown to Face of Curb unless otherwise
noted.
2. Contractor shall coordinate final joint locations in the field with
the Landscape Architect. Align to existing conditions when
practical, including at building and wall corners, connections to
existing work, and to centerlines of doors.
3. Space control joints evenly between all bands and expansion
joints as shown, unless otherwise dimensioned. Space interim
joints equally whenever possible.
4. Digital AutoCAD files will be provided to the successful bidder
as a courtesy to assist with field layout. The Contractor
maintains all responsibility for the use, accuracy, and
confirmation of such data.
5. All pavement striping shown shall adhere to Specifications.
The Contractor shall include in their bid any miscellaneous
copy, striping, or curb painting that may be requested by the
Fire Marshal.
6. All disturbed areas not proposed to receive pavements shall be
dressed with topsoil and seeded per Specifications.
7. All angles are 90 degrees unless otherwise noted
LAYOUT NOTES
0
Scale 1" = 30'-0"
60'30' 15'
North MATCHLINE - REFER TO SHEET L204MATCHLINE - REFER TO SHEET L201 MATCHLINE - REFER TO SHEET L204 Proposed Building
111,802 sq. ft.
FFE 855.80
3 1.Addendum #03 12-20-2019
3
05/27/20