HomeMy WebLinkAboutL207 - Layout Plan19'-2" (4 eq)
7'-3"
5'-10"120°4'-6"
26'-1"R50'-0"R
6
5
'
-
0
"
R3'-0"
R6
5
'
-0"R20'-0"R3'-0"R
3
'-0
"R50'-0"R5'-0"R5'-0"R5'-0"
R8'-0"
R8'-0 "
ej
ej
ej
ej
ejej79'-8" (20 eq)3'-6"4'-8" 2'-0"
4'
-0
"
ty
p
.4'-0" typ.12'-0" (2 eq)3'-5"4'-6"
2'-6"
6'-11" 4'-6" 7'-5"
16'-0" (3 eq)87'-4"R5
5
'
-
0
"
R3
0
'
-0"54'-5"5'-10"22'-0" 7'-7"9'-0"26'-8" (5 eq)R3'-0"R3'-0"R3'-0"R3'-0"R55'-4"19'-11 "26'-1"7'-7"26'-3"
15'-0"13'-3" 4'-7"10'-0"7'-3"5'-10" 4'-6" 39'-10" (8 eq)10'-0" (2 eq)10'-0" (2 eq)31'-2" (6 eq) 1
5
'
-8"10'-0" (2 eq)6'-0" R10'-0"14'-6" (3 eq)9'-6" (2 eq)9'-8" (2 eq)43'-11"
22'
-1"
9'-5" (2 eq) 6'-8" 4'-10"5'-0" 12'-0" (3 eq)5'-0" 4'-10" 5'-6"16'-5" (4 eq)4'-8" 4'-8" 8'-0" (2 eq) 8'-0" (2 eq)4'-8" 12'-0" (2 eq)3'-5"6'-8"6'-8"6'-8"12'-2"12'-2"ejejej
R66'
-0"2'-4"R50'-0"R250'-0"2'-3"
32'-0" (8 eq)4'-4"20'-0" (5 eq) 9'-5" (2 eq)
25'-0"
24'-7" 17'-9"1'-6" typ.9"
ty
p.
5'-6"
1
1
'
-
7
"
13'-
4
"10'-0" 16'-0"
1'-0" typ.1'-0" typ.A
16'-0" (3 eq)20'-0" (4 eq) 35'-9" (6 eq)16'-0" (3 eq)
ej
ej
29'-9" (5 eq) 7'-0"7'-11"R5'-0"R5'-0"43'-6" (8 eq)
3'-3"
5'-2"
16'-8" (3 eq)
2'-4"
25'-9" (5 eq)
2'-4"
14'-8" (3 eq)
R5'-
0
"
R5'-0"7'-11"7'-0"10'-0" (2 eq)2'-4"2'-8"3'-7"20'-0" (4 eq)3'-7"2'-4" 2'-8" ej ejejejej5'-0"6'-0" 4'-11" 10'-0"6'-0" 1. Dimensions are shown to Face of Curb unless otherwise
noted.
2. Contractor shall coordinate final joint locations in the field with
the Landscape Architect. Align to existing conditions when
practical, including at building and wall corners, connections to
existing work, and to centerlines of doors.
3. Space control joints evenly between all bands and expansion
joints as shown, unless otherwise dimensioned. Space interim
joints equally whenever possible.
4. Digital AutoCAD files will be provided to the successful bidder
as a courtesy to assist with field layout. The Contractor
maintains all responsibility for the use, accuracy, and
confirmation of such data.
5. All pavement striping shown shall adhere to Specifications.
The Contractor shall include in their bid any miscellaneous
copy, striping, or curb painting that may be requested by the
Fire Marshal.
6. All disturbed areas not proposed to receive pavements shall be
dressed with topsoil and seeded per Specifications.
7. All angles are 90 degrees unless otherwise noted
LAYOUT NOTES
Courtyard F Enlargement
Scale: 1" = 10'-0"
Courtyard E Enlargement
Scale: 1" = 10'-0" 12
0
Scale 1" = 10'-0"
20'10' 5'
North
Proposed Building
111,802 sq. ft.
FFE 855.80
Proposed Building
111,802 sq. ft.
FFE 855.80
Align bollards with edges of ramp.A
All Bollards to be 6'-5" apart and 1'-0" off face of curb, except those
noted type A. Refer to plan.
B
B
B
3 1.Addendum #03 12-20-2019
3
05/27/20