Loading...
HomeMy WebLinkAboutL207 - Layout Plan19'-2" (4 eq) 7'-3" 5'-10"120°4'-6" 26'-1"R50'-0"R 6 5 ' - 0 " R3'-0" R6 5 ' -0"R20'-0"R3'-0"R 3 '-0 "R50'-0"R5'-0"R5'-0"R5'-0" R8'-0" R8'-0 " ej ej ej ej ejej79'-8" (20 eq)3'-6"4'-8" 2'-0" 4' -0 " ty p .4'-0" typ.12'-0" (2 eq)3'-5"4'-6" 2'-6" 6'-11" 4'-6" 7'-5" 16'-0" (3 eq)87'-4"R5 5 ' - 0 " R3 0 ' -0"54'-5"5'-10"22'-0" 7'-7"9'-0"26'-8" (5 eq)R3'-0"R3'-0"R3'-0"R3'-0"R55'-4"19'-11 "26'-1"7'-7"26'-3" 15'-0"13'-3" 4'-7"10'-0"7'-3"5'-10" 4'-6" 39'-10" (8 eq)10'-0" (2 eq)10'-0" (2 eq)31'-2" (6 eq) 1 5 ' -8"10'-0" (2 eq)6'-0" R10'-0"14'-6" (3 eq)9'-6" (2 eq)9'-8" (2 eq)43'-11" 22' -1" 9'-5" (2 eq) 6'-8" 4'-10"5'-0" 12'-0" (3 eq)5'-0" 4'-10" 5'-6"16'-5" (4 eq)4'-8" 4'-8" 8'-0" (2 eq) 8'-0" (2 eq)4'-8" 12'-0" (2 eq)3'-5"6'-8"6'-8"6'-8"12'-2"12'-2"ejejej R66' -0"2'-4"R50'-0"R250'-0"2'-3" 32'-0" (8 eq)4'-4"20'-0" (5 eq) 9'-5" (2 eq) 25'-0" 24'-7" 17'-9"1'-6" typ.9" ty p. 5'-6" 1 1 ' - 7 " 13'- 4 "10'-0" 16'-0" 1'-0" typ.1'-0" typ.A 16'-0" (3 eq)20'-0" (4 eq) 35'-9" (6 eq)16'-0" (3 eq) ej ej 29'-9" (5 eq) 7'-0"7'-11"R5'-0"R5'-0"43'-6" (8 eq) 3'-3" 5'-2" 16'-8" (3 eq) 2'-4" 25'-9" (5 eq) 2'-4" 14'-8" (3 eq) R5'- 0 " R5'-0"7'-11"7'-0"10'-0" (2 eq)2'-4"2'-8"3'-7"20'-0" (4 eq)3'-7"2'-4" 2'-8" ej ejejejej5'-0"6'-0" 4'-11" 10'-0"6'-0" 1. Dimensions are shown to Face of Curb unless otherwise noted. 2. Contractor shall coordinate final joint locations in the field with the Landscape Architect. Align to existing conditions when practical, including at building and wall corners, connections to existing work, and to centerlines of doors. 3. Space control joints evenly between all bands and expansion joints as shown, unless otherwise dimensioned. Space interim joints equally whenever possible. 4. Digital AutoCAD files will be provided to the successful bidder as a courtesy to assist with field layout. The Contractor maintains all responsibility for the use, accuracy, and confirmation of such data. 5. All pavement striping shown shall adhere to Specifications. The Contractor shall include in their bid any miscellaneous copy, striping, or curb painting that may be requested by the Fire Marshal. 6. All disturbed areas not proposed to receive pavements shall be dressed with topsoil and seeded per Specifications. 7. All angles are 90 degrees unless otherwise noted LAYOUT NOTES Courtyard F Enlargement Scale: 1" = 10'-0" Courtyard E Enlargement Scale: 1" = 10'-0" 12 0 Scale 1" = 10'-0" 20'10' 5' North Proposed Building 111,802 sq. ft. FFE 855.80 Proposed Building 111,802 sq. ft. FFE 855.80 Align bollards with edges of ramp.A All Bollards to be 6'-5" apart and 1'-0" off face of curb, except those noted type A. Refer to plan. B B B 3 1.Addendum #03 12-20-2019 3 05/27/20