HomeMy WebLinkAboutL401 - Planting Plan95' OF 24" RCP@0.42%106' OF 24" RCP
@0.58%165' OF 30" RCP
@0.30
%
8' OF 30" HDPE
@0.37%
10' OF 12" RCP
@1.52%60' OF 12" RCP@0.84%36' OF 15" RCP
@0.63%79' OF 18" RCP
@0.47
%144' OF 24" RCP@0.45%1
2
8
'
OF
1
2
"
H
D
P
E@1
.
9
9%
8
0
'
OF
1
2
"
RC
P@0
.
5
0
%2
7
'
O
F
1
2
"
R
C
P@1.
6
5
%
48' OF 12" RCP
@0.41%
79' OF 12" RCP
@0 .58%78' OF 24" RCP@0.32%106'161' OF 12" RCP
@0.69%
9
7'
O
F
1
2"
R
C
P@1.4
4
%
64' OF 12" RCP
@1.95%6''SSD6''SSD
6'
'SSD6''SSD6''SSD6''SSD6''SSD6''SSD
6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD6''SSD
6''SSD6''SSDRDRD
33' OF 30" HDPE
@0.30%
11' OF 30" RCP
@0.53%
8' OF 15" RCP
@0.37%
STOPSTOP
DO NOTENTERWW WWWWW
W
W
W W W W WOHU OHU OHU OHUOHU OHUOHUOHUOHU OHUOHU OHU OHU OHU OHUOH
UOHU
W W
W WWWWW WWW WWW W WWST
O
P
STOP
STOPDRIVE TO BECONSTRUCTED BY OTHERSWALK TO BE CONSTRUCTED B Y OTHERSP
R
O
P
O
S
E
D
B
M
P
&
A
C
C
E
S
S
E
A
S
E
M
E
N
T
(7) Ile-m
(29) Bou-g
(29) Bou-g
(2) Lir-t
(1) Pla-x (1) Pla-x
(3) Zel-s
(1) Zel-s
(1) Zel-s
(1) Que-r
(1) Ulm-x
(1) Ulm-x
(1) Ulm-x
(1) Ulm-x
(1) Lir-t
(1) Lir-t
(1) Pla-x
(1) Lir-t
(6) Ile-m
(3) Ile-m
(3) Cor-a
(3) Ile-m
(3) Cor-a
(3) Ile-m
(4) Ile-m
(6) Cor-a
(8) Ile-m
(5) Tax-x
(5) Tax-x
(1) Mag-s (1) Mag-s
(4) Tax-x
(4) Bux-g
(5) Tax-x
(4) Bux-g
(1) Mag-s
(4) Pic-f
(3) Cer-c
(1)(1) Bet-n
(1) Bet-n
(1) Bet-n
(7) Jun-v
(5) Tax-x
(13) Bux-g
(7) Cea-a
(7) Cea-a
(7) Cor-a
(7) Cea-a
(7) Cor-a
(7) Cor-r
(6) Cor-r
(6) Cor-r
(1) Que-r
Existing 12" Cedar
Refer to LD100
Existing 16" Spruce
Refer to LD100
Existing 12" Cedar
Refer to LD100
Existing 12" Spruce
Refer to LD100
Existing 7" Cedar
Refer to LD100
Existing 14" + 12"+ 14" Cedar (multi-stem)
Refer to LD100
Existing 16" Tulip Poplar
Refer to LD100
Existing 7" +7" +15" Hackberry (multi-stem)
Refer to LD100
Existing 7" Ginko Biloba
Refer to LD100
Existing 11" Oak
Refer to LD100
Existing 42" Oak
Refer to LD100
Existing 10" Oak
Refer to LD100
Existing 14" Oak
Refer to LD100
Existing 11" Oak
Refer to LD100
Existing 12" Oak
Refer to LD100
Existing 4" +4" +4" Redbud
Refer to LD100
Existing 15" Bald Cypress
Refer to LD100
Existing 16" Bald Cypress
Refer to LD100
Existing 15" Bald
Refer to LD100
Existing 11" Bald
Refer to LD100
(16) Bux-g
(22) Rho-x
(3) Ile-m
(2) Ile-m
(4) Bux-g
(9) Tax-m
(1) Zel-s
(2) Ulm-x
(1) Ulm-x
(3) Ile-m
(3) Cor-a
(3) Ile-m
(3) Cor-a
(3) Ile-m
(16) Tax-m
(1) Lir-t
(1) Lir-t
(2) Que-r
(1) Syr-r
(1) Cer-c
(1) Syr-r
(1) Syr-r
(1) Syr-r
(1) Cer-c
(1) Cer-c
(1) Ulm-x
20'-0" Electrical Easement
0
Scale 1" = 30'-0"
60'30' 15'
North MATCHLINE - REFER TO SHEET L402MATCHLINE - REFER TO SHEET L402 MATCHLINE - REFER TO SHEET L403MATCHLINE - REFER TO SHEET L403
Lawn Seed Mix
Refer to Specification 32 92 00.
PLANTING LEGEND
ZONING: R2 - INSTITUTIONAL
Buffer Requirements:
Level A: 10' width; 4 shade/evergreen + 10 shrubs/100 l.f.
Level C: 15' width; 6 shade/evergreen + 1 ornamental + 15 shrubs/100 l.f.
Level D: 30' width; 8 shade/evergreen (3 of every 8 min. evergreen) + 2 ornamental
+ 20 shrubs/100 l.f.
North (west half): 350 l.f. @ Level A (Refer to Parking Lot Perimeter for 250 l.f.)
Required: 14 shade/evergreen + 35 shrubs
Provided: 14 shade +35 shrubs
North (east half): 303 l.f. @ Level D
Required: 24 shade/evergreen (min.10 evergreen) + 6 ornamental + 61 shrubs
Provided: 12 shade + 12 evergreen + 6 ornamental + 61 shrubs
West (north section): 708 l.f. @ Level D
Required: 58 shade/evergreen trees (min. 22 evergreen) + 15 ornamental trees +
142 shrubs
Provided: 34 existing shade + 24 existing evergreen + 3 Shade + 3 existing
ornamental + 12 ornamental + 142 shrubs
West (south section): 342 l.f. @ Level C
Required: 21 shade/evergreen + 4 ornamental + 52 shrubs
Provided: 16 shade + 9 ornamental (Per Urban Forester may substitute 1
ornamental for 1 shade along this boundary) + 52 shrubs
South: 653 l.f. @ Level D
Required: 53 shade/evergreen (min. 20 evergreen) + 14 ornamental + 131 shrubs
Provided: 31 existing shade + 2 shade + 20 evergreens + 14 ornamental + 131
shrubs
East: 1050 l.f. @ Level D
Required: 85 shade/evergreen (min. 32 evergreen) + 21 ornamental + 210 shrubs
Provided: 34 existing shade + 14 shade + 40 evergreen + 18 ornamental + 210
shrubs (Per Urban Forester request to substitute 3 shade for ornamental at
basketball court, reduce shrub count 13 at eastern property extension)
PARKING:
Requirements:
1 shade tree + 5 shrubs per every 10 parking spaces, no parking space may be
greater than 66 ft. from the nearest tree.
Interior Parking: 116 parking spaces
Required: 12 shade trees + 58 shrubs
Provided: 12 shade trees + 58 shrubs
FOUNDATION REQUIREMENTS:
Planting beds min. 5 ft. width except at driveways, courtyards, plazas, and
pedestrian access; cover 75% of planting area; foundation shrub spacing shall not
exceed 5 ft. intervals
Required: 3181 sq. ft. x 0.75 = 2385 sq. ft. minimum coverage
Provided: 2581 sq. ft
SIGNAGE FOUNDATION REQUIREMENTS:
Planting bed to match sign face sq. ft.
Required: 63 sq. ft. x 2 sides = 126 sq. ft.
Provided: 126 sq. ft.
ORDINANCE CHART
1. Refer to Project Manual for Planting Specifications and Topsoil
requirements. Refer to Plant Schedule and Planting Details for additional
information.
2. All materials are subject to the approval of the Landscape Architect and
Owner at any time. Landscape Architect to inspect all plant locations
and plant bed conditions prior to installation. On-site adjustments may
be required.
3. Rootballs shall meet or exceed size standards as set forth in 'American
Standards for Nursery Stock'. MAIN LEADERS OF ALL TREES SHALL
REMAIN INTACT.
4. Remove from the site any plant material that turns brown or defoliates
within five (5) days after planting. Replace immediately with approved,
specified material.
5. Plant counts indicated on drawings are for Landscape Architect's use
only. Contractor shall make own plant quantity takeoffs using drawings,
specifications, and plant schedule requirements (i.e., spacing), unless
otherwise directed by Landscape Architect. Contractor to verify bed
measurements and install appropriate quantities as governed by plant
spacing per schedule. Plant material quantities shown on plan are
minimum quantities. Additional material may be needed to meet spacing
requirements and field conditions.
6. Seed all areas disturbed by construction activities that are not otherwise
noted to receive pavement, planting bed, or sod treatment.
7. The Contractor shall install and/or amend topsoil in all proposed bed
areas to meet Specifications. Contractor shall coordinate quantity and
placement of topsoil. Landscaper shall verify depth of topsoil prior to
plant installation. (Refer to specifications for topsoil source and
placement requirements)
8. All tree locations shall be marked with 2x2" stakes prior to planting for
review and approval by the Landscape Architect. Any plant material
installed in an incorrect location, by the judgment of the Landscape
Architect, shall be reinstalled at the Contractor's expense.
9. All plant beds shall receive 3" minimum of shredded hardwood bark
mulch (unless otherwise noted).
10. Verify all utility locations in the field prior to beginning work. Repair all
damaged utilities to Owner's satisfaction at no additional cost.
11. The Contractor shall maintain all plant material and lawns until the
project is fully accepted by the Landscape Architect, unless otherwise
noted.
12. All workmanship and materials shall be guaranteed by the Contractor for
a period of one calendar year after Final Acceptance.
13. Install all plant material in accordance with all local codes and
ordinances. Coordinate with the Owner to obtain any required permits
necessary to complete work.
14. Contractor shall test all tree pits for drainage. Any tree pit that holds
water for more than 24 hours shall be installed using tree pit drainage.
15. Tree Protection Fencing is the responsibility of the Contractor. Minimum
protected area shall include the full drip line of the canopy. NO
construction activities, material storage, etc. may occur within that area.
The Contractor shall ensure that no soil compaction or tree damage
occurs in any Protected areas, at any time during the construction
process.
16. Trees shall be matched in groups unless otherwise noted.
17. LANDSCAPING MUST BE PLANTED ACCORDING TO THE DETAILS
ON SHEET L410 - SEE PLANTING DETAILS.
GENERAL LANDSCAPE AND
PLANTING NOTES
3 1.Addendum #03 12-20-2019
6 2. ASI #001 02-14-2020
6
05/27/20