Loading...
HomeMy WebLinkAboutA1.1-ENLARGED-FLOOR-PLANS� �� � � NOTES L VERIFY ALL WORK AND MEASUREMENTS 5. RELOCATE� GONOOLAS (ONLY IF W FIELD BE7iNEEN CVS PROJECT CONTRACTOR HAS GONDOLA TRAINING). MANAGER AN� GENERAL CONTRACTOR CONTRACTOR RESPONSIBLE FOR MOVING PRIOR TO ANY WORK BEING DONE. p�� GONDOLAS LEVELING AND STRAIGHTENINC. THE SiORE 2 CLEAN ALL RNISHE� SURFACES (GLASS, PERSONNEL OR STORE SET—UP FRAMING, LAMINATE, CARPET, ETC.) AT PERSONNEL WILL MOVE ALL THE PROJECT COMPLETION THROUGHOUT MERCHANDISE IN THE STORE PRIOR TO ENTIRE STORE. THE REMODEL INCLU�ING FRONT CHECK—OUT AND PHARMACY. 3. ALL WORK IN CHECK OUT AREA SHALL BE COMPLETED OVERNIGHT AND SHALL 6. ALL E%ISTWG PHARIAACY REGISTERS BE FULLY OPERAiIONAL BY NEXT DAY ARE IBM TOUCHSCREEN. GC SHALL BE STORE OPENING. RESPONSIBLE FOR $ECURING ALL E%ISiING EOUIPMENT TO REMAIN. 4. THE PHARMACY SHALL REMAIN SECURE COORDINAiE NEW EQUIPMENT W1TH CPM. AT ALL TIMES. LEGEND E%ISTING PAR7ITION TO REMAIN NOTE ALL WALLS, DOORS, AND WINDOWS WITHOUT A SYMBOL DESIGNAiION ARE EXIS7ING TO REMAIN. a 1 COLUMN GRID �O NEY NOTE �ESIGNAPON NOTES BY SYMBOL OINSTALL NEW L5. RACK AS SHOWN REELEC7RICAL O MSTALL NEW PANEL 'E' AS SHOWN RE:ELEC7RICAL OA�OOIFY EXISTING MDP AS REQUIRED REELEC7RICAL �'�� pharmacy" HUB/SSSI sro� Nu�e�R� 08674 1421 RANGELME ROAD CARMEL, IN 46032 CAPCODE: (90/88) CS PROJECT NUMBER 138374 I ARCHITECT OF RECORD� \ J CONSULTANT ENGINEER� CONSULTANT� SEAL� � REVISIONS: 03-09-2020 PERMIT SET � � � DRAWING BY: JAW CVS PROJECT MANAGER: E ROSARIO DATE: 03-09-2020 JOB NUMBER: JCDT19.0401.00 TITLE: ENLARGED FLOOR PLANS SHEET NUMBER: � RELEA5E0 FOR CONSTRIICTI�N A' Su6jec��ocompliancewithallregula�ions P�Iv of S�a�e antl Local Codes City of Carmel r �un��\i lo•rvalM��. — DATE: 06�QZ�2O � COMMENTS: A1.1