HomeMy WebLinkAbout20 POST STORMWATER POLLUTION PREVENTION PLAN39 1ST LEVEL PARKING STALLSPROPOSED BUILDING1ST FLOOR RETAIL4,519 SQ.FT.F.F.E. = 847.20ZONED: UCSEA Grou
p
,
L
an
d
S
u
r
ve
y
o
r
s W. M A I N S T R E E TPROPOSED LEGEND:MAY 20, 20208
AB3456712CDEFGH83456712ABCDEFGHDESCRIPTIONDATENO
REVISION RECORD
DATE:
DWG SCALE:
DRAWN BY:
CHECKED BY:
APPROVED BY:
PROJECT NO:SHEETOFDRAWING NO.:STUDIO M ARCHITECTURE
L'ETOILE
833 W. MAIN STREET
CARMEL, INDIANAREFERENCE 530 E. Ohio Street · Suite G - Indianapolis, IN 46204
317-655-7777 · 877-746-0749
www.cecinc.comPERMITNOT FORCONSTRUCTIONPENDING21192-773
BEB
ACH
DRAFT
1" = 20'C900POST STORMWATER POLLUTION
PREVENTION PLAN
20NORTHSOIL MAPCONTACT INFORMATIONSOILS MAP LEGENDGENERAL NOTES ADDITIONAL CITY OF CARMEL NOTES: